APA (7th ed.) Citation

Kim, H., Lee, J., & Lee, T. (2015). Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm. IEEE transactions on automation science and engineering, 12(2), 690-700. https://doi.org/10.1109/TASE.2013.2293552

Chicago Style (17th ed.) Citation

Kim, Hyun-Jung, Jun-Ho Lee, and Tae-Eog Lee. "Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm." IEEE Transactions on Automation Science and Engineering 12, no. 2 (2015): 690-700. https://doi.org/10.1109/TASE.2013.2293552.

MLA (9th ed.) Citation

Kim, Hyun-Jung, et al. "Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm." IEEE Transactions on Automation Science and Engineering, vol. 12, no. 2, 2015, pp. 690-700, https://doi.org/10.1109/TASE.2013.2293552.

Warning: These citations may not always be 100% accurate.