An ANN to Predict Ground Condition ahead of Tunnel Face using TBM Operational Data

This paper presents an artificial neural network (ANN) model that predicts ground conditions ahead of a tunnel face by using shield tunnel boring machine (TBM) data obtained during the tunneling operation. The primary advantage of the proposed technique is that, by using TBM data, no additional data...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:KSCE Journal of Civil Engineering Ročník 23; číslo 7; s. 3200 - 3206
Hlavní autori: Jung, Jee-Hee, Chung, Heeyoung, Kwon, Young-Sam, Lee, In-Mo
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: Seoul Korean Society of Civil Engineers 01.07.2019
Springer Nature B.V
대한토목학회
Predmet:
ISSN:1226-7988, 1976-3808
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Buďte prvý, kto okomentuje tento záznam!
Najprv sa musíte prihlásiť.