Two‐stage stochastic‐robust planning of distributed energy storage systems with Archimedes optimisation algorithm
With the advancement of energy storage technologies, energy storage systems (ESSs) have emerged as a promising solution for distribution networks to mitigate the impact of intermittent and violate renewable energy sources. The optimal planning of distributed ESS is studied to minimise the investment...
Gespeichert in:
| Veröffentlicht in: | IET smart grid Jg. 7; H. 5; S. 643 - 652 |
|---|---|
| Hauptverfasser: | , , |
| Format: | Journal Article |
| Sprache: | Englisch |
| Veröffentlicht: |
Durham
John Wiley & Sons, Inc
01.10.2024
Wiley |
| Schlagworte: | |
| ISSN: | 2515-2947, 2515-2947 |
| Online-Zugang: | Volltext |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
| Zusammenfassung: | With the advancement of energy storage technologies, energy storage systems (ESSs) have emerged as a promising solution for distribution networks to mitigate the impact of intermittent and violate renewable energy sources. The optimal planning of distributed ESS is studied to minimise the investment and operational costs for the distribution system operator. To address the various uncertainties associated with load demand and distributed generation, the authors formulate the problem as a two‐stage stochastic‐robust optimisation problem. The proposed formulation implements various representative scenarios of actual operating conditions and constructs the robust uncertainty set to ensure feasibility under worst‐case scenarios. In view of the computational complexity of the proposed model, a solution approach combining the Archimedes optimisation algorithm and the global optimisation method is presented. By decomposing the investment and operation stages, the subproblems are relaxed into mixed integer second‐order cone programming models, which can be solved in parallel based on scenarios. Numerical studies are carried out on a 17‐node test system to demonstrate the validity of the proposed model and algorithm. In addition, a comparison between the proposed method and the genetic algorithm is performed, to illustrate its superiority in solving speed and solution optimality.
To address the uncertainties associated with load demand and distribution generation, the authors formulate a two‐stage stochastic‐robust optimisation problem, including various representative scenarios of actual operating conditions and a robust uncertainty set to ensure feasibility under worst‐case scenarios. In view of the computational complexity of the proposed model, a solution approach combining the Archimedes optimisation algorithm and the global optimisation method is presented. |
|---|---|
| Bibliographie: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
| ISSN: | 2515-2947 2515-2947 |
| DOI: | 10.1049/stg2.12171 |