Coordinated short-term scheduling and long-term expansion planning in microgrids incorporating renewable energy resources and energy storage systems

this paper presents a two-level stochastic microgrid planning tool. The proposed tool determines the optimal location and size of different technologies through a long-term plan as well as the optimal operation strategy for technologies through a short-term plan. The proposed planning tool considers...

Full description

Saved in:
Bibliographic Details
Published in:Energy (Oxford) Vol. 134; pp. 699 - 708
Main Authors: Hemmati, Reza, Saboori, Hedayat, Siano, Pierluigi
Format: Journal Article
Language:English
Published: Oxford Elsevier Ltd 01.09.2017
Elsevier BV
Subjects:
ISSN:0360-5442, 1873-6785
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:this paper presents a two-level stochastic microgrid planning tool. The proposed tool determines the optimal location and size of different technologies through a long-term plan as well as the optimal operation strategy for technologies through a short-term plan. The proposed planning tool considers distributed generation resources, energy storage systems, and lines as candidates for the expansion. One of the key characteristics of the introduced planning is its ability to tackle load and renewable energies uncertainties through stochastic planning. Both the long-term and short-term plans are mathematically expressed as mixed integer nonlinear programming problems and solved by using a strong Meta-heuristic optimization algorithm. Simulation results demonstrate that the proposed two-level planning method reduces the planning cost compared to the conventional method (i.e., only long-term planning). As well, it is indicated that considering line as an option for the expansion reduces the planning cost and increases the flexibility of the planning. •A stochastic expansion planning is addressed on microgrids.•The planning tool includes two long-term and short-term plans.•Wind unit, solar panel, energy storage system, and line are installed by plan.•The planning tool is expressed as a mixed integer nonlinear programming.•Meta-heuristic optimization algorithm is applied so solve the problem.
Bibliography:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
content type line 23
ISSN:0360-5442
1873-6785
DOI:10.1016/j.energy.2017.06.081