Coordinated short-term scheduling and long-term expansion planning in microgrids incorporating renewable energy resources and energy storage systems

this paper presents a two-level stochastic microgrid planning tool. The proposed tool determines the optimal location and size of different technologies through a long-term plan as well as the optimal operation strategy for technologies through a short-term plan. The proposed planning tool considers...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:Energy (Oxford) Ročník 134; s. 699 - 708
Hlavní autoři: Hemmati, Reza, Saboori, Hedayat, Siano, Pierluigi
Médium: Journal Article
Jazyk:angličtina
Vydáno: Oxford Elsevier Ltd 01.09.2017
Elsevier BV
Témata:
ISSN:0360-5442, 1873-6785
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Popis
Shrnutí:this paper presents a two-level stochastic microgrid planning tool. The proposed tool determines the optimal location and size of different technologies through a long-term plan as well as the optimal operation strategy for technologies through a short-term plan. The proposed planning tool considers distributed generation resources, energy storage systems, and lines as candidates for the expansion. One of the key characteristics of the introduced planning is its ability to tackle load and renewable energies uncertainties through stochastic planning. Both the long-term and short-term plans are mathematically expressed as mixed integer nonlinear programming problems and solved by using a strong Meta-heuristic optimization algorithm. Simulation results demonstrate that the proposed two-level planning method reduces the planning cost compared to the conventional method (i.e., only long-term planning). As well, it is indicated that considering line as an option for the expansion reduces the planning cost and increases the flexibility of the planning. •A stochastic expansion planning is addressed on microgrids.•The planning tool includes two long-term and short-term plans.•Wind unit, solar panel, energy storage system, and line are installed by plan.•The planning tool is expressed as a mixed integer nonlinear programming.•Meta-heuristic optimization algorithm is applied so solve the problem.
Bibliografie:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
content type line 23
ISSN:0360-5442
1873-6785
DOI:10.1016/j.energy.2017.06.081