Study on guaranteed output constraints in the long term joint optimal scheduling for the hydropower station group
Long-term joint scheduling of hydropower station group (LJSHSG) is a constrained optimization problem, which suffers from a variety of complex and time-state coupling constraints. It is beset with difficulties to solve LJSHSG problem owing to these equality constraints, rigid constraints and flexibl...