He, Z., Zhou, J., Xie, M., Jia, B., Bao, Z., Qin, H., & Zhang, H. (2019). Study on guaranteed output constraints in the long term joint optimal scheduling for the hydropower station group. Energy (Oxford), 185, 1210-1224. https://doi.org/10.1016/j.energy.2019.07.066
Chicago Style (17th ed.) CitationHe, Zhongzheng, Jianzhong Zhou, Mengfei Xie, Benjun Jia, Zhengfeng Bao, Hui Qin, and Hairong Zhang. "Study on Guaranteed Output Constraints in the Long Term Joint Optimal Scheduling for the Hydropower Station Group." Energy (Oxford) 185 (2019): 1210-1224. https://doi.org/10.1016/j.energy.2019.07.066.
MLA (9th ed.) CitationHe, Zhongzheng, et al. "Study on Guaranteed Output Constraints in the Long Term Joint Optimal Scheduling for the Hydropower Station Group." Energy (Oxford), vol. 185, 2019, pp. 1210-1224, https://doi.org/10.1016/j.energy.2019.07.066.