He, Z., Zhou, J., Xie, M., Jia, B., Bao, Z., Qin, H., & Zhang, H. (2019). Study on guaranteed output constraints in the long term joint optimal scheduling for the hydropower station group. Energy (Oxford), 185, 1210-1224. https://doi.org/10.1016/j.energy.2019.07.066
Citace podle Chicago (17th ed.)He, Zhongzheng, Jianzhong Zhou, Mengfei Xie, Benjun Jia, Zhengfeng Bao, Hui Qin, a Hairong Zhang. "Study on Guaranteed Output Constraints in the Long Term Joint Optimal Scheduling for the Hydropower Station Group." Energy (Oxford) 185 (2019): 1210-1224. https://doi.org/10.1016/j.energy.2019.07.066.
Citace podle MLA (9th ed.)He, Zhongzheng, et al. "Study on Guaranteed Output Constraints in the Long Term Joint Optimal Scheduling for the Hydropower Station Group." Energy (Oxford), vol. 185, 2019, pp. 1210-1224, https://doi.org/10.1016/j.energy.2019.07.066.