He, Z., Zhou, J., Xie, M., Jia, B., Bao, Z., Qin, H., & Zhang, H. (2019). Study on guaranteed output constraints in the long term joint optimal scheduling for the hydropower station group. Energy (Oxford), 185, 1210-1224. https://doi.org/10.1016/j.energy.2019.07.066
Citácia podle Chicago (17th ed.)He, Zhongzheng, Jianzhong Zhou, Mengfei Xie, Benjun Jia, Zhengfeng Bao, Hui Qin, a Hairong Zhang. "Study on Guaranteed Output Constraints in the Long Term Joint Optimal Scheduling for the Hydropower Station Group." Energy (Oxford) 185 (2019): 1210-1224. https://doi.org/10.1016/j.energy.2019.07.066.
Citácia podľa MLA (8th ed.)He, Zhongzheng, et al. "Study on Guaranteed Output Constraints in the Long Term Joint Optimal Scheduling for the Hydropower Station Group." Energy (Oxford), vol. 185, 2019, pp. 1210-1224, https://doi.org/10.1016/j.energy.2019.07.066.