A bicriteria approach to maximize the weighted number of just-in-time jobs and to minimize the total resource consumption cost in a two-machine flow-shop scheduling system

We analyze a two-machine flow-shop scheduling problem in which the job processing times are controllable by the allocation of resources to the job operations and the resources can be used in discrete quantities. We provide a bicriteria analysis of the problem where the first criterion is to maximize...

Full description

Saved in:
Bibliographic Details
Published in:International journal of production economics Vol. 136; no. 1; pp. 67 - 74
Main Authors: Shabtay, Dvir, Bensoussan, Yaron, Kaspi, Moshe
Format: Journal Article
Language:English
Published: Amsterdam Elsevier B.V 01.03.2012
Elsevier Sequoia S.A
Subjects:
ISSN:0925-5273, 1873-7579
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first