A bicriteria approach to maximize the weighted number of just-in-time jobs and to minimize the total resource consumption cost in a two-machine flow-shop scheduling system

We analyze a two-machine flow-shop scheduling problem in which the job processing times are controllable by the allocation of resources to the job operations and the resources can be used in discrete quantities. We provide a bicriteria analysis of the problem where the first criterion is to maximize...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:International journal of production economics Ročník 136; číslo 1; s. 67 - 74
Hlavní autoři: Shabtay, Dvir, Bensoussan, Yaron, Kaspi, Moshe
Médium: Journal Article
Jazyk:angličtina
Vydáno: Amsterdam Elsevier B.V 01.03.2012
Elsevier Sequoia S.A
Témata:
ISSN:0925-5273, 1873-7579
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Abstract We analyze a two-machine flow-shop scheduling problem in which the job processing times are controllable by the allocation of resources to the job operations and the resources can be used in discrete quantities. We provide a bicriteria analysis of the problem where the first criterion is to maximize the weighted number of just-in-time jobs and the second criterion is to minimize the total resource consumption cost. We prove that although the problem is known to be NP - hard even for constant processing times, a pseudo-polynomial time algorithm for its solution exists. In addition, we show how the pseudo-polynomial time algorithm can be converted into a two-dimensional fully polynomial approximation scheme for finding an approximate Pareto solution.
AbstractList We analyze a two-machine flow-shop scheduling problem in which the job processing times are controllable by the allocation of resources to the job operations and the resources can be used in discrete quantities. We provide a bicriteria analysis of the problem where the first criterion is to maximize the weighted number of just-in-time jobs and the second criterion is to minimize the total resource consumption cost. We prove that although the problem is known to be NP - hard even for constant processing times, a pseudo-polynomial time algorithm for its solution exists. In addition, we show how the pseudo-polynomial time algorithm can be converted into a two-dimensional fully polynomial approximation scheme for finding an approximate Pareto solution.
We analyze a two-machine flow-shop scheduling problem in which the job processing times are controllable by the allocation of resources to the job operations and the resources can be used in discrete quantities. We provide a bicriteria analysis of the problem where the first criterion is to maximize the weighted number of just-in-time jobs and the second criterion is to minimize the total resource consumption cost. We prove that although the problem is known to be NP-hard even for constant processing times, a pseudo-polynomial time algorithm for its solution exists. In addition, we show how the pseudo-polynomial time algorithm can be converted into a two-dimensional fully polynomial approximation scheme for finding an approximate Pareto solution. [PUBLICATION ABSTRACT]
We analyze a two-machine flow-shop scheduling problem in which the job processing times are controllable by the allocation of resources to the job operations and the resources can be used in discrete quantities. We provide a bicriteria analysis of the problem where the first criterion is to maximize the weighted number of just-in-time jobs and the second criterion is to minimize the total resource consumption cost. We prove that although the problem is known to be NP - hard even for constant processing times, a pseudo-polynomial time algorithm for its solution exists. In addition, we show how the pseudo-polynomial time algorithm can be converted into a two-dimensional fully polynomial approximation scheme for finding an approximate Pareto solution.
Author Bensoussan, Yaron
Shabtay, Dvir
Kaspi, Moshe
Author_xml – sequence: 1
  givenname: Dvir
  surname: Shabtay
  fullname: Shabtay, Dvir
  email: dvirs@bgu.ac.il
– sequence: 2
  givenname: Yaron
  surname: Bensoussan
  fullname: Bensoussan, Yaron
  email: bensousy@bgu.ac.il
– sequence: 3
  givenname: Moshe
  surname: Kaspi
  fullname: Kaspi, Moshe
  email: moshe@bgu.ac.il
BookMark eNp9kUGL1TAUhYOM4JvRP-AquHLTmrRN24CbYXBUGHCj65CmN9Nb2qQmqc_xL_knzfMJwixmdRI438nNuZfkwnkHhLzmrOSMt-_mEucNyopxXjJZZnlGDrzv6qITnbwgByYrUYiqq1-QyxhnxljH-_5Afl_TAU3ABAE11dsWvDYTTZ6u-ieu-AtomoAeAe-nBCN1-zpAoN7SeY-pQFckXIHOfohUu_EviO4_mHzSCw0Q_R4MUONd3NctoXf5HBNFRzVNR1-s-Vl0QO3ij0Wc_EajmWDcF3T3ND7EBOtL8tzqJcKrf3pFvt1--Hrzqbj78vHzzfVdYZqqTkVreaPB9tIw3XPR9K3JVzEIxmouheWybQy0QzV0mulBANhBM9tIO8pKalFfkbfn3FzG9x1iUitGA8uiHfg9qtw4k7xr6j5b3zyyzvmjLk-nsqNuOtE22VSdTSb4GANYtQVcdXjISaewVs3qtD51Wp9iUmXJUP8IMpj0qbgUNC5Po-_PKOSSfiAEFQ2CMzBiAJPU6PEp_A8KlbxV
CODEN IJPCEY
CitedBy_id crossref_primary_10_1002_nav_22097
crossref_primary_10_1016_j_omega_2015_05_001
crossref_primary_10_1016_j_cie_2016_12_020
crossref_primary_10_1057_jors_2016_14
crossref_primary_10_1016_j_ijpe_2012_08_014
crossref_primary_10_1007_s10951_017_0511_7
crossref_primary_10_1007_s10951_022_00772_4
crossref_primary_10_1016_j_ijpe_2013_05_004
crossref_primary_10_1016_j_omega_2015_09_010
crossref_primary_10_1016_j_ijpe_2013_12_021
crossref_primary_10_1016_j_cie_2015_06_002
crossref_primary_10_1016_j_ijpe_2017_12_025
crossref_primary_10_1016_j_ejor_2021_03_034
crossref_primary_10_1007_s10951_017_0552_y
crossref_primary_10_1007_s12597_020_00484_3
crossref_primary_10_1002_nav_21731
crossref_primary_10_1016_j_cie_2019_106003
crossref_primary_10_1155_2014_679702
crossref_primary_10_1016_j_cor_2012_09_001
crossref_primary_10_1080_0305215X_2017_1414207
crossref_primary_10_3390_a11040043
Cites_doi 10.1007/s10951-007-0030-z
10.1016/S0305-0548(03)00187-4
10.1145/321921.321934
10.1016/S0305-0548(03)00081-9
10.1016/S0305-0548(00)00086-1
10.1287/opre.42.2.234
10.1007/s10951-005-6813-1
10.1007/s10479-004-5030-1
10.1016/j.dam.2007.02.003
10.1007/s00607-001-1441-x
10.1016/0377-2217(90)90376-M
10.1016/S0167-5060(08)70356-X
10.1137/S1052623495288192
10.1016/0305-0548(95)00078-X
10.7494/dmms.2007.1.2.59
10.1016/0166-218X(93)E0174-W
10.1016/j.cor.2004.05.011
10.1007/s10951-010-0204-y
10.1016/j.ijpe.2008.10.014
10.1016/0377-2217(93)90245-I
10.1016/0377-2217(96)00129-4
10.1080/05695558008974515
10.1080/0020754031000087175
10.1016/j.ijpe.2009.03.003
10.1016/0166-218X(90)90105-L
10.1080/07408170601181674
10.1016/S0377-2217(82)80008-8
10.1287/opre.38.1.22
10.1016/S0377-2217(97)00343-3
10.1007/s10951-005-2863-7
10.1016/j.ejor.2004.07.012
10.1007/s10878-009-9270-5
ContentType Journal Article
Copyright 2011 Elsevier B.V.
Copyright Elsevier Sequoia S.A. Mar 2012
Copyright_xml – notice: 2011 Elsevier B.V.
– notice: Copyright Elsevier Sequoia S.A. Mar 2012
DBID AAYXX
CITATION
7TA
7TB
8FD
FR3
JG9
KR7
DOI 10.1016/j.ijpe.2011.09.011
DatabaseName CrossRef
Materials Business File
Mechanical & Transportation Engineering Abstracts
Technology Research Database
Engineering Research Database
Materials Research Database
Civil Engineering Abstracts
DatabaseTitle CrossRef
Materials Research Database
Civil Engineering Abstracts
Engineering Research Database
Technology Research Database
Mechanical & Transportation Engineering Abstracts
Materials Business File
DatabaseTitleList Materials Research Database
Materials Research Database

DeliveryMethod fulltext_linktorsrc
Discipline Engineering
Business
EISSN 1873-7579
EndPage 74
ExternalDocumentID 2568528371
10_1016_j_ijpe_2011_09_011
S0925527311003975
Genre Feature
GroupedDBID --K
--M
-~X
.DC
.~1
0R~
1B1
1RT
1~.
1~5
29J
4.4
457
4G.
5GY
5VS
7-5
71M
8P~
9JN
9JO
AAAKF
AAAKG
AABNK
AACTN
AAEDT
AAEDW
AAFFL
AAIAV
AAIKJ
AAKOC
AALRI
AAOAW
AAPFB
AAQFI
AAQXK
AARIN
AAXUO
ABFNM
ABFRF
ABJNI
ABMAC
ABUCO
ABXDB
ABYKQ
ACDAQ
ACGFO
ACGFS
ACGOD
ACIWK
ACNNM
ACRLP
ACROA
ADBBV
ADEZE
ADFHU
ADMUD
ADTZH
AEBSH
AECPX
AEFWE
AEKER
AENEX
AEYQN
AFKWA
AFODL
AFTJW
AGHFR
AGTHC
AGUBO
AGYEJ
AHHHB
AHJVU
AI.
AIEXJ
AIIAU
AIKHN
AITUG
AJBFU
AJOXV
AJWLA
ALMA_UNASSIGNED_HOLDINGS
AMFUW
AMRAJ
APLSM
ASPBG
AVWKF
AXJTR
AXLSJ
AZFZN
BEHZQ
BEZPJ
BGSCR
BJAXD
BKOJK
BKOMP
BLXMC
BNTGB
BPUDD
BULVW
BZJEE
CS3
DU5
EBS
EFJIC
EFLBG
EJD
EO8
EO9
EP2
EP3
FDB
FEDTE
FGOYB
FIRID
FNPLU
FYGXN
G-2
G-Q
GBLVA
HAMUX
HLX
HVGLF
HZ~
IHE
IXIXF
J1W
JJJVA
KOM
LG8
LY1
LY7
M41
MO0
MS~
N9A
O-L
O9-
OAUVE
OZT
P-8
P-9
P2P
PC.
PQQKQ
Q38
R2-
RIG
ROL
RPZ
RXW
SBM
SDF
SDG
SDP
SDS
SES
SET
SEW
SPC
SPCBC
SSB
SSD
SSF
SST
SSZ
T5K
TAE
TN5
U5U
VH1
WUQ
YK3
~02
~G-
9DU
AATTM
AAXKI
AAYWO
AAYXX
ABWVN
ACLOT
ACRPL
ACVFH
ADCNI
ADNMO
ADVLN
AEIPS
AEUPX
AFJKZ
AFPUW
AGQPQ
AIGII
AIIUN
AKBMS
AKRWK
AKYEP
ANKPU
APXCP
CITATION
EFKBS
~HD
7TA
7TB
8FD
AGCQF
FR3
JG9
KR7
ID FETCH-LOGICAL-c423t-6f14aef89c0a815486caef5b5003195f1964ce6b2b7a0ab5eefba0f49fd929a53
ISICitedReferencesCount 23
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000300741100007&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 0925-5273
IngestDate Sun Sep 28 06:19:03 EDT 2025
Wed Aug 13 10:00:46 EDT 2025
Tue Nov 18 22:16:02 EST 2025
Sat Nov 29 01:48:07 EST 2025
Fri Feb 23 02:19:00 EST 2024
IsPeerReviewed true
IsScholarly true
Issue 1
Keywords Just-in-time scheduling
Flow shop
FPTAS
Controllable processing times
Resource allocation
Pseudo-polynomial time algorithm
Language English
License https://www.elsevier.com/tdm/userlicense/1.0
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-c423t-6f14aef89c0a815486caef5b5003195f1964ce6b2b7a0ab5eefba0f49fd929a53
Notes SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ObjectType-Article-2
content type line 23
PQID 917347564
PQPubID 45063
PageCount 8
ParticipantIDs proquest_miscellaneous_1010917438
proquest_journals_917347564
crossref_primary_10_1016_j_ijpe_2011_09_011
crossref_citationtrail_10_1016_j_ijpe_2011_09_011
elsevier_sciencedirect_doi_10_1016_j_ijpe_2011_09_011
PublicationCentury 2000
PublicationDate 2012-03-01
PublicationDateYYYYMMDD 2012-03-01
PublicationDate_xml – month: 03
  year: 2012
  text: 2012-03-01
  day: 01
PublicationDecade 2010
PublicationPlace Amsterdam
PublicationPlace_xml – name: Amsterdam
PublicationTitle International journal of production economics
PublicationYear 2012
Publisher Elsevier B.V
Elsevier Sequoia S.A
Publisher_xml – name: Elsevier B.V
– name: Elsevier Sequoia S.A
References Shabtay, Kaspi (bib25) 2004; 31
Janiak, Kovalyov (bib14) 1996; 94
Carlisle, Lloyd (bib3) 1995; 59
Shabtay (bib24) 2004; 31
Nowicki, Zdrzalka (bib22) 1990; 26
Chudzik, Janiak, Lichtenstein (bib8) 2006
Sung, Vlach (bib31) 2005; 8
Van Wassenhove, Baker (bib35) 1982; 11
Choi, Yoon (bib5) 2007; 10
Su, Lien (bib30) 2009; 117
Cheng, Janiak, Kovalyov (bib4) 1998; 8
Cormen, Leiserson, Rivest (bib7) 1996
Daniels (bib9) 1990; 48
Ng, Cheng, Janiak, Kovalyov (bib21) 2005; 133
to appear.
Vickson (bib34) 1980; 12
Sahni (bib23) 1976; 23
Shabtay, Steiner (bib27) 2007; 155
Kaspi, Shabtay (bib17) 2003; 41
Trick (bib33) 1994; 42
Janiak (bib13) 1987; 23
Graham, Lawler, Lenstra, Rinnooy Kan (bib10) 1979; 5
Hiraishi, Levner, Vlach (bib11) 2002; 29
Hoogeveen, Woeginger (bib12) 2002; 68
Čepek, Sung (bib6) 2005; 32
T'kindt, Billaut (bib32) 2006
Shakhlevich, Strusevich (bib29) 2005; 8
Yedidsion, Shabtay, Korach, Kaspi (bib36) 2009; 119
Lann, Mosheiov (bib19) 1996; 23
Alidaee, Ahmadian (bib1) 1993; 70
Shabtay, Kaspi, Steiner (bib26) 2007; 39
Baker, Scudder (bib2) 1990; 38
Kayan, Akturk (bib18) 2005; 167
Shabtay, D., Bensoussan, Y. Maximizing the weighted number of just-in-time jobs in a two machine flow and open shop scheduling systems. Journal of Scheduling, doi
Janiak, Janiak, Lichtenstein (bib16) 2007; 1
Janiak (bib15) 1998; 107
Leyvand, Shabtay, Steiner, Yedidsion (bib20) 2010; 19
Chudzik (10.1016/j.ijpe.2011.09.011_bib8) 2006
Graham (10.1016/j.ijpe.2011.09.011_bib10) 1979; 5
Cormen (10.1016/j.ijpe.2011.09.011_bib7) 1996
Janiak (10.1016/j.ijpe.2011.09.011_bib14) 1996; 94
Janiak (10.1016/j.ijpe.2011.09.011_bib15) 1998; 107
Sung (10.1016/j.ijpe.2011.09.011_bib31) 2005; 8
Čepek (10.1016/j.ijpe.2011.09.011_bib6) 2005; 32
Shabtay (10.1016/j.ijpe.2011.09.011_bib25) 2004; 31
Kaspi (10.1016/j.ijpe.2011.09.011_bib17) 2003; 41
Ng (10.1016/j.ijpe.2011.09.011_bib21) 2005; 133
Lann (10.1016/j.ijpe.2011.09.011_bib19) 1996; 23
Shabtay (10.1016/j.ijpe.2011.09.011_bib26) 2007; 39
Cheng (10.1016/j.ijpe.2011.09.011_bib4) 1998; 8
Vickson (10.1016/j.ijpe.2011.09.011_bib34) 1980; 12
Nowicki (10.1016/j.ijpe.2011.09.011_bib22) 1990; 26
Leyvand (10.1016/j.ijpe.2011.09.011_bib20) 2010; 19
Daniels (10.1016/j.ijpe.2011.09.011_bib9) 1990; 48
Shabtay (10.1016/j.ijpe.2011.09.011_bib27) 2007; 155
Su (10.1016/j.ijpe.2011.09.011_bib30) 2009; 117
Yedidsion (10.1016/j.ijpe.2011.09.011_bib36) 2009; 119
T'kindt (10.1016/j.ijpe.2011.09.011_bib32) 2006
Van Wassenhove (10.1016/j.ijpe.2011.09.011_bib35) 1982; 11
Sahni (10.1016/j.ijpe.2011.09.011_bib23) 1976; 23
Choi (10.1016/j.ijpe.2011.09.011_bib5) 2007; 10
Alidaee (10.1016/j.ijpe.2011.09.011_bib1) 1993; 70
Janiak (10.1016/j.ijpe.2011.09.011_bib16) 2007; 1
Shabtay (10.1016/j.ijpe.2011.09.011_bib24) 2004; 31
Trick (10.1016/j.ijpe.2011.09.011_bib33) 1994; 42
Carlisle (10.1016/j.ijpe.2011.09.011_bib3) 1995; 59
Baker (10.1016/j.ijpe.2011.09.011_bib2) 1990; 38
Janiak (10.1016/j.ijpe.2011.09.011_bib13) 1987; 23
Shakhlevich (10.1016/j.ijpe.2011.09.011_bib29) 2005; 8
10.1016/j.ijpe.2011.09.011_bib28
Hoogeveen (10.1016/j.ijpe.2011.09.011_bib12) 2002; 68
Hiraishi (10.1016/j.ijpe.2011.09.011_bib11) 2002; 29
Kayan (10.1016/j.ijpe.2011.09.011_bib18) 2005; 167
References_xml – volume: 167
  start-page: 624
  year: 2005
  end-page: 643
  ident: bib18
  article-title: A new bounding mechanism for the CNC machine scheduling problem with controllable processing times
  publication-title: European Journal of Operational Research
– year: 1996
  ident: bib7
  article-title: Introduction to Algorithms
– volume: 10
  start-page: 237
  year: 2007
  end-page: 243
  ident: bib5
  article-title: Maximizing the weighted number of just-in-time jobs in flow shop scheduling
  publication-title: Journal of Scheduling
– volume: 133
  start-page: 163
  year: 2005
  end-page: 174
  ident: bib21
  article-title: Group scheduling with controllable setup and processing times: minimizing total weighted completion time
  publication-title: Annals of Operations Research
– volume: 8
  start-page: 233
  year: 2005
  end-page: 253
  ident: bib29
  article-title: Pre-emptive scheduling problems with controllable processing times
  publication-title: Journal of Scheduling
– volume: 41
  start-page: 2229
  year: 2003
  end-page: 2248
  ident: bib17
  article-title: Optimization of machining economics problem for a multi-stage transfer machine under failure, opportunistic and integrated replacement strategies
  publication-title: International Journal of Production Research
– reference: Shabtay, D., Bensoussan, Y. Maximizing the weighted number of just-in-time jobs in a two machine flow and open shop scheduling systems. Journal of Scheduling, doi:
– volume: 117
  start-page: 256
  year: 2009
  end-page: 266
  ident: bib30
  article-title: Scheduling parallel machines with resource-dependent processing times
  publication-title: International Journal of Production Economics
– year: 2006
  ident: bib8
  article-title: Scheduling problems with resource allocation
  publication-title: Scheduling in Computer and Manufacturing Systems
– volume: 107
  start-page: 325
  year: 1998
  end-page: 337
  ident: bib15
  article-title: Minimization of the makespan in a two-machine problem under given resource constraints
  publication-title: European Journal of Operational Research
– volume: 119
  start-page: 298
  year: 2009
  end-page: 307
  ident: bib36
  article-title: A bicriteria approach to minimize number of tardy jobs and resource consumption in scheduling a single machine
  publication-title: International Journal of Production Economics
– volume: 59
  start-page: 225
  year: 1995
  end-page: 235
  ident: bib3
  article-title: On the k-coloring of intervals
  publication-title: Discrete Applied Mathematics
– volume: 39
  start-page: 539
  year: 2007
  end-page: 557
  ident: bib26
  article-title: The no-wait two-machine flow-shop scheduling problem with convex resource-dependent processing times
  publication-title: IIE Transactions
– volume: 31
  start-page: 1303
  year: 2004
  end-page: 1315
  ident: bib24
  article-title: Single and a two-resource allocation algorithms for minimizing the maximal lateness in a single machine-scheduling problem
  publication-title: Computers and Operations Research
– volume: 23
  start-page: 116
  year: 1976
  end-page: 127
  ident: bib23
  article-title: Algorithms for scheduling independent tasks
  publication-title: Journal of the ACM
– volume: 31
  start-page: 2279
  year: 2004
  end-page: 2289
  ident: bib25
  article-title: Minimizing the total weighted flow time in a single machine with controllable processing times
  publication-title: Computers and Operations Research
– volume: 29
  start-page: 841
  year: 2002
  end-page: 848
  ident: bib11
  article-title: Scheduling of parallel identical machines to maximize the weighted number of just-in-time jobs
  publication-title: Computers and Operations Research
– volume: 19
  start-page: 347
  year: 2010
  end-page: 368
  ident: bib20
  article-title: Just-in-time scheduling with controllable processing times on parallel machines
  publication-title: Journal of Combinatorial Optimization
– volume: 38
  start-page: 22
  year: 1990
  end-page: 36
  ident: bib2
  article-title: Sequencing with earliness and tardiness penalties: a review
  publication-title: Operations Research
– volume: 42
  start-page: 234
  year: 1994
  end-page: 248
  ident: bib33
  article-title: Scheduling multiple variable-speed machines
  publication-title: Operations Research
– volume: 5
  start-page: 287
  year: 1979
  end-page: 326
  ident: bib10
  article-title: Optimization and approximation in deterministic sequencing and scheduling: a survey
  publication-title: Annals of Discrete Mathematics
– volume: 70
  start-page: 335
  year: 1993
  end-page: 341
  ident: bib1
  article-title: Two parallel machine sequencing problems involving controllable job processing times
  publication-title: European Journal of Operational Research
– volume: 94
  start-page: 284
  year: 1996
  end-page: 291
  ident: bib14
  article-title: Single machine scheduling subject to deadlines and resource dependent processing times
  publication-title: European Journal of Operational Research
– volume: 1
  start-page: 59
  year: 2007
  end-page: 89
  ident: bib16
  article-title: Resource management in machine scheduling problems: a survey
  publication-title: Decision Making in Manufacturing and Services
– volume: 155
  start-page: 1643
  year: 2007
  end-page: 1666
  ident: bib27
  article-title: A survey of scheduling with controllable processing times
  publication-title: Discrete Applied Mathematics
– volume: 26
  start-page: 271
  year: 1990
  end-page: 287
  ident: bib22
  article-title: A survey of results for sequencing problems with controllable processing times
  publication-title: Discrete Applied Mathematics
– volume: 48
  start-page: 226
  year: 1990
  end-page: 241
  ident: bib9
  article-title: A multi-objective approach to resource allocation in single machine scheduling
  publication-title: European Journal of Operational Research
– volume: 12
  start-page: 258
  year: 1980
  end-page: 262
  ident: bib34
  article-title: Two single machine sequencing problems involving controllable job processing times
  publication-title: AIIE Transactions
– volume: 32
  start-page: 3265
  year: 2005
  end-page: 3271
  ident: bib6
  article-title: A quadratic time algorithm to maximize the number of just-in-time jobs on identical parallel machines
  publication-title: Computers and Operations Research
– volume: 8
  start-page: 617
  year: 1998
  end-page: 630
  ident: bib4
  article-title: Bicriterion single machine scheduling with resource dependent processing times
  publication-title: SIAM Journal on Optimization
– reference: , to appear.
– volume: 23
  start-page: 765
  year: 1996
  end-page: 781
  ident: bib19
  article-title: Single machine scheduling to minimize the number of early and tardy jobs
  publication-title: Computers and Operations Research
– volume: 23
  start-page: 289
  year: 1987
  end-page: 293
  ident: bib13
  article-title: One-machine scheduling with allocation of continuously-divisible resource and with no precedence constraints
  publication-title: Kybernetika
– volume: 11
  start-page: 48
  year: 1982
  end-page: 54
  ident: bib35
  article-title: A bicriterion approach to time/cost trade-offs in sequencing
  publication-title: European Journal of Operational Research
– year: 2006
  ident: bib32
  article-title: Multicriteria Scheduling: Theory, Models and Algorithms
– volume: 8
  start-page: 453
  year: 2005
  end-page: 460
  ident: bib31
  article-title: Maximizing weighted number of just-in-time jobs on unrelated parallel machines
  publication-title: Journal of Scheduling
– volume: 68
  start-page: 181
  year: 2002
  end-page: 192
  ident: bib12
  article-title: Some comments on sequencing with controllable processing times
  publication-title: Computing
– volume: 10
  start-page: 237
  year: 2007
  ident: 10.1016/j.ijpe.2011.09.011_bib5
  article-title: Maximizing the weighted number of just-in-time jobs in flow shop scheduling
  publication-title: Journal of Scheduling
  doi: 10.1007/s10951-007-0030-z
– volume: 31
  start-page: 2279
  issue: 13
  year: 2004
  ident: 10.1016/j.ijpe.2011.09.011_bib25
  article-title: Minimizing the total weighted flow time in a single machine with controllable processing times
  publication-title: Computers and Operations Research
  doi: 10.1016/S0305-0548(03)00187-4
– year: 2006
  ident: 10.1016/j.ijpe.2011.09.011_bib32
– volume: 23
  start-page: 116
  issue: 1
  year: 1976
  ident: 10.1016/j.ijpe.2011.09.011_bib23
  article-title: Algorithms for scheduling independent tasks
  publication-title: Journal of the ACM
  doi: 10.1145/321921.321934
– volume: 31
  start-page: 1303
  issue: 8
  year: 2004
  ident: 10.1016/j.ijpe.2011.09.011_bib24
  article-title: Single and a two-resource allocation algorithms for minimizing the maximal lateness in a single machine-scheduling problem
  publication-title: Computers and Operations Research
  doi: 10.1016/S0305-0548(03)00081-9
– volume: 29
  start-page: 841
  issue: 7
  year: 2002
  ident: 10.1016/j.ijpe.2011.09.011_bib11
  article-title: Scheduling of parallel identical machines to maximize the weighted number of just-in-time jobs
  publication-title: Computers and Operations Research
  doi: 10.1016/S0305-0548(00)00086-1
– volume: 42
  start-page: 234
  year: 1994
  ident: 10.1016/j.ijpe.2011.09.011_bib33
  article-title: Scheduling multiple variable-speed machines
  publication-title: Operations Research
  doi: 10.1287/opre.42.2.234
– volume: 8
  start-page: 233
  year: 2005
  ident: 10.1016/j.ijpe.2011.09.011_bib29
  article-title: Pre-emptive scheduling problems with controllable processing times
  publication-title: Journal of Scheduling
  doi: 10.1007/s10951-005-6813-1
– volume: 133
  start-page: 163
  year: 2005
  ident: 10.1016/j.ijpe.2011.09.011_bib21
  article-title: Group scheduling with controllable setup and processing times: minimizing total weighted completion time
  publication-title: Annals of Operations Research
  doi: 10.1007/s10479-004-5030-1
– volume: 155
  start-page: 1643
  issue: 13
  year: 2007
  ident: 10.1016/j.ijpe.2011.09.011_bib27
  article-title: A survey of scheduling with controllable processing times
  publication-title: Discrete Applied Mathematics
  doi: 10.1016/j.dam.2007.02.003
– year: 1996
  ident: 10.1016/j.ijpe.2011.09.011_bib7
– volume: 68
  start-page: 181
  year: 2002
  ident: 10.1016/j.ijpe.2011.09.011_bib12
  article-title: Some comments on sequencing with controllable processing times
  publication-title: Computing
  doi: 10.1007/s00607-001-1441-x
– volume: 48
  start-page: 226
  year: 1990
  ident: 10.1016/j.ijpe.2011.09.011_bib9
  article-title: A multi-objective approach to resource allocation in single machine scheduling
  publication-title: European Journal of Operational Research
  doi: 10.1016/0377-2217(90)90376-M
– volume: 5
  start-page: 287
  year: 1979
  ident: 10.1016/j.ijpe.2011.09.011_bib10
  article-title: Optimization and approximation in deterministic sequencing and scheduling: a survey
  publication-title: Annals of Discrete Mathematics
  doi: 10.1016/S0167-5060(08)70356-X
– volume: 8
  start-page: 617
  issue: 2
  year: 1998
  ident: 10.1016/j.ijpe.2011.09.011_bib4
  article-title: Bicriterion single machine scheduling with resource dependent processing times
  publication-title: SIAM Journal on Optimization
  doi: 10.1137/S1052623495288192
– volume: 23
  start-page: 765
  year: 1996
  ident: 10.1016/j.ijpe.2011.09.011_bib19
  article-title: Single machine scheduling to minimize the number of early and tardy jobs
  publication-title: Computers and Operations Research
  doi: 10.1016/0305-0548(95)00078-X
– volume: 1
  start-page: 59
  year: 2007
  ident: 10.1016/j.ijpe.2011.09.011_bib16
  article-title: Resource management in machine scheduling problems: a survey
  publication-title: Decision Making in Manufacturing and Services
  doi: 10.7494/dmms.2007.1.2.59
– volume: 59
  start-page: 225
  year: 1995
  ident: 10.1016/j.ijpe.2011.09.011_bib3
  article-title: On the k-coloring of intervals
  publication-title: Discrete Applied Mathematics
  doi: 10.1016/0166-218X(93)E0174-W
– volume: 32
  start-page: 3265
  year: 2005
  ident: 10.1016/j.ijpe.2011.09.011_bib6
  article-title: A quadratic time algorithm to maximize the number of just-in-time jobs on identical parallel machines
  publication-title: Computers and Operations Research
  doi: 10.1016/j.cor.2004.05.011
– ident: 10.1016/j.ijpe.2011.09.011_bib28
  doi: 10.1007/s10951-010-0204-y
– volume: 117
  start-page: 256
  issue: 2
  year: 2009
  ident: 10.1016/j.ijpe.2011.09.011_bib30
  article-title: Scheduling parallel machines with resource-dependent processing times
  publication-title: International Journal of Production Economics
  doi: 10.1016/j.ijpe.2008.10.014
– volume: 70
  start-page: 335
  year: 1993
  ident: 10.1016/j.ijpe.2011.09.011_bib1
  article-title: Two parallel machine sequencing problems involving controllable job processing times
  publication-title: European Journal of Operational Research
  doi: 10.1016/0377-2217(93)90245-I
– volume: 94
  start-page: 284
  year: 1996
  ident: 10.1016/j.ijpe.2011.09.011_bib14
  article-title: Single machine scheduling subject to deadlines and resource dependent processing times
  publication-title: European Journal of Operational Research
  doi: 10.1016/0377-2217(96)00129-4
– volume: 12
  start-page: 258
  issue: 3
  year: 1980
  ident: 10.1016/j.ijpe.2011.09.011_bib34
  article-title: Two single machine sequencing problems involving controllable job processing times
  publication-title: AIIE Transactions
  doi: 10.1080/05695558008974515
– volume: 41
  start-page: 2229
  issue: 10
  year: 2003
  ident: 10.1016/j.ijpe.2011.09.011_bib17
  article-title: Optimization of machining economics problem for a multi-stage transfer machine under failure, opportunistic and integrated replacement strategies
  publication-title: International Journal of Production Research
  doi: 10.1080/0020754031000087175
– volume: 119
  start-page: 298
  year: 2009
  ident: 10.1016/j.ijpe.2011.09.011_bib36
  article-title: A bicriteria approach to minimize number of tardy jobs and resource consumption in scheduling a single machine
  publication-title: International Journal of Production Economics
  doi: 10.1016/j.ijpe.2009.03.003
– year: 2006
  ident: 10.1016/j.ijpe.2011.09.011_bib8
  article-title: Scheduling problems with resource allocation
– volume: 26
  start-page: 271
  year: 1990
  ident: 10.1016/j.ijpe.2011.09.011_bib22
  article-title: A survey of results for sequencing problems with controllable processing times
  publication-title: Discrete Applied Mathematics
  doi: 10.1016/0166-218X(90)90105-L
– volume: 39
  start-page: 539
  issue: 5
  year: 2007
  ident: 10.1016/j.ijpe.2011.09.011_bib26
  article-title: The no-wait two-machine flow-shop scheduling problem with convex resource-dependent processing times
  publication-title: IIE Transactions
  doi: 10.1080/07408170601181674
– volume: 11
  start-page: 48
  year: 1982
  ident: 10.1016/j.ijpe.2011.09.011_bib35
  article-title: A bicriterion approach to time/cost trade-offs in sequencing
  publication-title: European Journal of Operational Research
  doi: 10.1016/S0377-2217(82)80008-8
– volume: 38
  start-page: 22
  year: 1990
  ident: 10.1016/j.ijpe.2011.09.011_bib2
  article-title: Sequencing with earliness and tardiness penalties: a review
  publication-title: Operations Research
  doi: 10.1287/opre.38.1.22
– volume: 107
  start-page: 325
  year: 1998
  ident: 10.1016/j.ijpe.2011.09.011_bib15
  article-title: Minimization of the makespan in a two-machine problem under given resource constraints
  publication-title: European Journal of Operational Research
  doi: 10.1016/S0377-2217(97)00343-3
– volume: 23
  start-page: 289
  issue: 4
  year: 1987
  ident: 10.1016/j.ijpe.2011.09.011_bib13
  article-title: One-machine scheduling with allocation of continuously-divisible resource and with no precedence constraints
  publication-title: Kybernetika
– volume: 8
  start-page: 453
  year: 2005
  ident: 10.1016/j.ijpe.2011.09.011_bib31
  article-title: Maximizing weighted number of just-in-time jobs on unrelated parallel machines
  publication-title: Journal of Scheduling
  doi: 10.1007/s10951-005-2863-7
– volume: 167
  start-page: 624
  year: 2005
  ident: 10.1016/j.ijpe.2011.09.011_bib18
  article-title: A new bounding mechanism for the CNC machine scheduling problem with controllable processing times
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2004.07.012
– volume: 19
  start-page: 347
  issue: 3
  year: 2010
  ident: 10.1016/j.ijpe.2011.09.011_bib20
  article-title: Just-in-time scheduling with controllable processing times on parallel machines
  publication-title: Journal of Combinatorial Optimization
  doi: 10.1007/s10878-009-9270-5
SSID ssj0007188
Score 2.142585
Snippet We analyze a two-machine flow-shop scheduling problem in which the job processing times are controllable by the allocation of resources to the job operations...
SourceID proquest
crossref
elsevier
SourceType Aggregation Database
Enrichment Source
Index Database
Publisher
StartPage 67
SubjectTerms Algorithms
Allocations
Approximation
Controllable processing times
Cost engineering
Criteria
Flow shop
FPTAS
Job shops
Just in time
Just-in-time scheduling
Mathematical analysis
Operations research
Pareto optimum
Production scheduling
Pseudo-polynomial time algorithm
Resource allocation
Resource scheduling
Scheduling
Studies
Title A bicriteria approach to maximize the weighted number of just-in-time jobs and to minimize the total resource consumption cost in a two-machine flow-shop scheduling system
URI https://dx.doi.org/10.1016/j.ijpe.2011.09.011
https://www.proquest.com/docview/917347564
https://www.proquest.com/docview/1010917438
Volume 136
WOSCitedRecordID wos000300741100007&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVESC
  databaseName: Elsevier SD Freedom Collection Journals 2021
  customDbUrl:
  eissn: 1873-7579
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0007188
  issn: 0925-5273
  databaseCode: AIEXJ
  dateStart: 19950301
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1Nj9MwELXKLkJwQLCAKAvISIhL5FXafPpYUFeAloJEVyqnyEltNVWbhCb9EH-Jf8KvYhzbabqI1XLgkiZp7LSaF_vNZPwGoddgUhdoqkvCKXOJO3VsAmamZCr8MHE8qQqlik0Eo1E4mdAvnc4vsxZmswiyLNztaPFfTQ3nwNhy6ew_mLvpFE7APhgdtmB22N7I8AMrTmEokBrMrJEMlxRzyXbpMv3Ba665rUOi9bt_WRJEcsb5uqxImhFZbt6a57FSb5YN02zfsMpVLQAV9ZdZ6_Dn1LiT5GVdcIBZ1TYnyzpNk1tikW9JOcsLCxxpmNjq9e9KQLrNjA9Dky1Bi0Jp0sobcL2KuvEDvs5YXDGVCLBJmzzjt-Cb5-uyVMHdb2zVyjVgZVEnMHzKyxlvxzxk8ohJ-jLBy75HpHTcwTiulFQOAKtGZVXwQ8_vqijQHzOHCmLMz9J5wbWyKz2z9URwINM9-hydX15cROPhZPym-E5kBTP5pl-Xc7mFjvuBR2GEPR58GE4-NrwAWEDNC8xv10u4VLbh1dv-jSZdIQw1Cxo_QPe1-4IHCnYPUYdnJ-iOWT1xgu619C0foZ8DvMciNljEVY4NFjFAChssYoVFnAvcxiKWWMSAxbqhxmLdsMYiNljELSxiiUWcZpjhFhZxg0W8xyJWWHyMLs-H43fvia4OQhJwASrii57LuAhpYrNQOt5-Aode7Ml5inpCKs0l3I_7ccBsFnuci5jZwqViCi4B85wn6CjLM_4UYUEdFxyFmPpJ3-UCXCbYix3XFdBjkEy7qGeMESVaOl9WcFlEJkdyHkkDRtKAkU0j-Ogiq2lTKOGYa6_2jI0jTX0VpY0An9e2OzWAiPSTWUa0Fzhu4PluF71qvoVZQ74KZBmH5092B44CeA_hsxtcc4ru7p_C5-ioWq35C3Q72VRpuXqpcf4bu8nwPA
linkProvider Elsevier
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=A+bicriteria+approach+to+maximize+the+weighted+number+of+just-in-time+jobs+and+to+minimize+the+total+resource+consumption+cost+in+a+two-machine+flow-shop+scheduling+system&rft.jtitle=International+journal+of+production+economics&rft.au=Shabtay%2C+Dvir&rft.au=Bensoussan%2C+Yaron&rft.au=Kaspi%2C+Moshe&rft.date=2012-03-01&rft.issn=0925-5273&rft.volume=136&rft.issue=1&rft.spage=67&rft.epage=74&rft_id=info:doi/10.1016%2Fj.ijpe.2011.09.011&rft.externalDBID=NO_FULL_TEXT
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0925-5273&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0925-5273&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0925-5273&client=summon