A bicriteria approach to maximize the weighted number of just-in-time jobs and to minimize the total resource consumption cost in a two-machine flow-shop scheduling system

We analyze a two-machine flow-shop scheduling problem in which the job processing times are controllable by the allocation of resources to the job operations and the resources can be used in discrete quantities. We provide a bicriteria analysis of the problem where the first criterion is to maximize...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of production economics Jg. 136; H. 1; S. 67 - 74
Hauptverfasser: Shabtay, Dvir, Bensoussan, Yaron, Kaspi, Moshe
Format: Journal Article
Sprache:Englisch
Veröffentlicht: Amsterdam Elsevier B.V 01.03.2012
Elsevier Sequoia S.A
Schlagworte:
ISSN:0925-5273, 1873-7579
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:We analyze a two-machine flow-shop scheduling problem in which the job processing times are controllable by the allocation of resources to the job operations and the resources can be used in discrete quantities. We provide a bicriteria analysis of the problem where the first criterion is to maximize the weighted number of just-in-time jobs and the second criterion is to minimize the total resource consumption cost. We prove that although the problem is known to be NP - hard even for constant processing times, a pseudo-polynomial time algorithm for its solution exists. In addition, we show how the pseudo-polynomial time algorithm can be converted into a two-dimensional fully polynomial approximation scheme for finding an approximate Pareto solution.
Bibliographie:SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ObjectType-Article-2
content type line 23
ISSN:0925-5273
1873-7579
DOI:10.1016/j.ijpe.2011.09.011