APA (7th ed.) Citation

Zeqiraj, D. (2022). Enhanced oil recovery (EOR) project scheduling with multiobjective of maximum net present value and minimum makesapn. Results in engineering, 13, 100339. https://doi.org/10.1016/j.rineng.2022.100339

Chicago Style (17th ed.) Citation

Zeqiraj, Dulian. "Enhanced Oil Recovery (EOR) Project Scheduling with Multiobjective of Maximum Net Present Value and Minimum Makesapn." Results in Engineering 13 (2022): 100339. https://doi.org/10.1016/j.rineng.2022.100339.

MLA (9th ed.) Citation

Zeqiraj, Dulian. "Enhanced Oil Recovery (EOR) Project Scheduling with Multiobjective of Maximum Net Present Value and Minimum Makesapn." Results in Engineering, vol. 13, 2022, p. 100339, https://doi.org/10.1016/j.rineng.2022.100339.

Warning: These citations may not always be 100% accurate.