Zan, X., Wu, Z., Guo, C., & Yu, Z. (2020). A Pareto-based genetic algorithm for multi-objective scheduling of automated manufacturing systems. Advances in mechanical engineering, 12(1), . https://doi.org/10.1177/1687814019885294
Citace podle Chicago (17th ed.)Zan, Xin, Zepeng Wu, Cheng Guo, a Zhenhua Yu. "A Pareto-based Genetic Algorithm for Multi-objective Scheduling of Automated Manufacturing Systems." Advances in Mechanical Engineering 12, no. 1 (2020). https://doi.org/10.1177/1687814019885294.
Citace podle MLA (9th ed.)Zan, Xin, et al. "A Pareto-based Genetic Algorithm for Multi-objective Scheduling of Automated Manufacturing Systems." Advances in Mechanical Engineering, vol. 12, no. 1, 2020, https://doi.org/10.1177/1687814019885294.
Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..