Rafiee Parsa, N., Karimi, B., & Moattar Husseini, S. (2016). Minimizing total flow time on a batch processing machine using a hybrid max–min ant system. Computers & industrial engineering, 99, 372-381. https://doi.org/10.1016/j.cie.2016.06.008
Citace podle Chicago (17th ed.)Rafiee Parsa, N., B. Karimi, a S.M Moattar Husseini. "Minimizing Total Flow Time on a Batch Processing Machine Using a Hybrid Max–min Ant System." Computers & Industrial Engineering 99 (2016): 372-381. https://doi.org/10.1016/j.cie.2016.06.008.
Citace podle MLA (9th ed.)Rafiee Parsa, N., et al. "Minimizing Total Flow Time on a Batch Processing Machine Using a Hybrid Max–min Ant System." Computers & Industrial Engineering, vol. 99, 2016, pp. 372-381, https://doi.org/10.1016/j.cie.2016.06.008.