A LAGRANGIAN RELAXATION-BASED ALGORITHM FOR THE ALLOCATION OF YARD CRANES FOR YARD ACTIVITIES WITH DIFFERENT PRIORITIES

This paper proposes a mixed integer programming model for the allocation of rail mounted gantry cranes for four basic yard activities with different priorities. The model pays special attention to the typical features of this kind of gantry cranes, such as a restricted traveling range and a limited...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of systems science and systems engineering Jg. 22; H. 2; S. 227 - 252
Hauptverfasser: Zhang, Canrong, Wu, Tao, Zheng, Li, Miao, Lixin
Format: Journal Article
Sprache:Englisch
Veröffentlicht: Heidelberg SP Systems Engineering Society of China 01.06.2013
Springer
Springer Nature B.V
Department of Industrial Engineering, Tsinghua University, Beijing 10084, China%Business Analytics and Optimization, University of Phoenix, Apollo Group, Inc., Phoenix, AZ 85040, U.S.A.%Department of Industrial Engineering, Tsinghua University, Beijing 10084, China%Logistics Engineering and Simulation Laboratory, Graduate School at Shenzhen, Tsinghua University, Shenzhen 518055, China
Logistics Engineering and Simulation Laboratory, Graduate School at Shenzhen, Tsinghua University, Shenzhen 518055, China
Schlagworte:
ISSN:1004-3756, 1861-9576
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!