Preventive Maintenance Scheduling of Multi-Cogeneration Plants Using Integer Programming

Maintenance scheduling of cogeneration plants, which produce both electric power and desalinated water, is a typical complex process with long-term operations and planning problems. The plants' maintenance scheduling process has to determine the appropriate schedule for preventive maintenance,...

Full description

Saved in:
Bibliographic Details
Published in:The Journal of the Operational Research Society Vol. 59; no. 4; pp. 503 - 509
Main Authors: Alardhi, M., Labib, A. W.
Format: Journal Article Conference Proceeding
Language:English
Published: London Palgrave Macmillan Publishers 01.04.2008
Palgrave Macmillan UK
Palgrave
Taylor & Francis Ltd
Subjects:
ISSN:0160-5682, 1476-9360
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Maintenance scheduling of cogeneration plants, which produce both electric power and desalinated water, is a typical complex process with long-term operations and planning problems. The plants' maintenance scheduling process has to determine the appropriate schedule for preventive maintenance, while satisfying all the system constraints and maintaining adequate system availability. It is an optimization problem and the maintenance and system constraints include the crew constraint, maintenance window constraint and time limitation constraint. In this paper, an integer linear-programming model, which has been developed, is described which schedules the preventive maintenance tasks in a multi-cogeneration plant. Results of a test example of such a plant situated in Kuwait are presented to show the applicability of the approach.
Bibliography:SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ISSN:0160-5682
1476-9360
DOI:10.1057/palgrave.jors.2602386