Project Management Model for Constructing a Renewable Energy Plant

A project management model is developed for constructing a renewable energy plant in this research. Program evaluation and review technique (PERT) is applied first to find the critical activities when constructing the plant and to calculate the total project cost and total duration time for the proj...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:Procedia engineering Ročník 174; s. 145 - 154
Hlavní autoři: Lee, Amy H.I., Kang, He-Yau, Huang, Tzu-Ting
Médium: Journal Article
Jazyk:angličtina
Vydáno: Elsevier Ltd 2017
Témata:
ISSN:1877-7058, 1877-7058
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Abstract A project management model is developed for constructing a renewable energy plant in this research. Program evaluation and review technique (PERT) is applied first to find the critical activities when constructing the plant and to calculate the total project cost and total duration time for the project under normal condition. When some activities are crashed, the total duration time can be reduced. The total project cost and the total duration time for crashing various activities are calculated. The fuzzy PERT model is developed by the fuzzy multiple objective linear programming, and the model can devise the project implementation plan to maximize the total degree of satisfaction while minimizing total project cost and total duration time. A case study of a wind turbine construction in Taiwan is presented to show the practicality of the proposed models.
AbstractList A project management model is developed for constructing a renewable energy plant in this research. Program evaluation and review technique (PERT) is applied first to find the critical activities when constructing the plant and to calculate the total project cost and total duration time for the project under normal condition. When some activities are crashed, the total duration time can be reduced. The total project cost and the total duration time for crashing various activities are calculated. The fuzzy PERT model is developed by the fuzzy multiple objective linear programming, and the model can devise the project implementation plan to maximize the total degree of satisfaction while minimizing total project cost and total duration time. A case study of a wind turbine construction in Taiwan is presented to show the practicality of the proposed models.
Author Lee, Amy H.I.
Kang, He-Yau
Huang, Tzu-Ting
Author_xml – sequence: 1
  givenname: Amy H.I.
  surname: Lee
  fullname: Lee, Amy H.I.
  organization: Department of Technology Management,Chung Hua University, Taiwan
– sequence: 2
  givenname: He-Yau
  surname: Kang
  fullname: Kang, He-Yau
  email: kanghy@ncut.edu.tw
  organization: Department of Industrial Engineering and Management, National Chin-Yi University of Technology, Taiwan
– sequence: 3
  givenname: Tzu-Ting
  surname: Huang
  fullname: Huang, Tzu-Ting
  organization: Department of Industrial Engineering and Management, National Chin-Yi University of Technology, Taiwan
BookMark eNqFkM1Kw0AUhQepYK19Axd5gcS5SZqZuBC0-AcVi-h6uJnchAnpTJmMSt_elLoQF3o352y-A_c7ZRPrLDF2DjwBDsVFl2y9I9smKQeRcEhAFkdsClKIWPCFnPzoJ2w-DB3fn-DpAqbsZu1dRzpET2ixpQ3Zsbqa-qhxPlo6OwT_roOxbYTRC1n6xKqn6NaSb3fRukcbzthxg_1A8--csbe729flQ7x6vn9cXq9inQMPcVZBnTaggYqikmUqClFWgJKnNYhGIIkMqxKxljLPtMjrRUMIWZanJWYCRDZjl4dd7d0weGqUNgGDcTZ4NL0CrvZCVKcOQtReiOKgRiEjnP-Ct95s0O_-w64OGI2PfRjyatCGrKba-NGaqp35e-ALSAN-ig
CitedBy_id crossref_primary_10_4028_www_scientific_net_AMM_892_266
crossref_primary_10_1088_1757_899X_737_1_012037
crossref_primary_10_1080_15623599_2023_2239431
crossref_primary_10_1088_1757_899X_852_1_012087
crossref_primary_10_1177_23998083251347682
crossref_primary_10_3390_en14154661
crossref_primary_10_3390_su152115526
crossref_primary_10_1051_matecconf_201819201027
crossref_primary_10_1109_ACCESS_2021_3077289
crossref_primary_10_35378_gujs_1599844
crossref_primary_10_36004_nier_es_2023_1_02
Cites_doi 10.1080/00207543.2014.952792
10.1016/j.ejor.2015.06.038
10.1007/s11135-011-9460-y
10.1016/0165-0114(92)90318-X
10.3233/IFS-120751
10.1016/j.amc.2006.01.027
10.1016/0165-0114(78)90031-3
10.1016/j.ejor.2014.11.014
ContentType Journal Article
Copyright 2017 The Authors
Copyright_xml – notice: 2017 The Authors
DBID 6I.
AAFTH
AAYXX
CITATION
DOI 10.1016/j.proeng.2017.01.186
DatabaseName ScienceDirect Open Access Titles
Elsevier:ScienceDirect:Open Access
CrossRef
DatabaseTitle CrossRef
DatabaseTitleList
DeliveryMethod fulltext_linktorsrc
Discipline Engineering
EISSN 1877-7058
EndPage 154
ExternalDocumentID 10_1016_j_proeng_2017_01_186
S1877705817301868
GroupedDBID --K
0R~
0SF
1B1
4.4
457
5VS
6I.
71M
AACTN
AAEDT
AAEDW
AAFTH
AAFWJ
AAIKJ
AALRI
AAQFI
AAXUO
ABMAC
ACGFS
ADBBV
ADEZE
ADMUD
AEXQZ
AFTJW
AGHFR
AITUG
ALMA_UNASSIGNED_HOLDINGS
AMRAJ
E3Z
EBS
EJD
EP3
FDB
FEDTE
FNPLU
HVGLF
HZ~
IXB
KQ8
M41
M~E
NCXOZ
O-L
O9-
OK1
OZT
P2P
RIG
ROL
SES
SSZ
XH2
9DU
AAYWO
AAYXX
ABWVN
ACRPL
ACVFH
ADCNI
ADNMO
ADVLN
AEUPX
AFPUW
AIGII
AKBMS
AKRWK
AKYEP
CITATION
~HD
ID FETCH-LOGICAL-c410t-3b1d2f1c1e66b8927679b1a802d17f7ae73ab9aad8843c74d5fea133429a37173
ISICitedReferencesCount 9
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000399998200017&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 1877-7058
IngestDate Sat Nov 29 02:10:56 EST 2025
Tue Nov 18 20:53:08 EST 2025
Fri Feb 23 02:47:36 EST 2024
IsDoiOpenAccess true
IsOpenAccess true
IsPeerReviewed true
IsScholarly true
Keywords project management
Renewable energy
program evaluation and review technique (PERT)
fuzzy
Language English
License This is an open access article under the CC BY-NC-ND license.
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-c410t-3b1d2f1c1e66b8927679b1a802d17f7ae73ab9aad8843c74d5fea133429a37173
OpenAccessLink https://dx.doi.org/10.1016/j.proeng.2017.01.186
PageCount 10
ParticipantIDs crossref_citationtrail_10_1016_j_proeng_2017_01_186
crossref_primary_10_1016_j_proeng_2017_01_186
elsevier_sciencedirect_doi_10_1016_j_proeng_2017_01_186
PublicationCentury 2000
PublicationDate 2017
2017-00-00
PublicationDateYYYYMMDD 2017-01-01
PublicationDate_xml – year: 2017
  text: 2017
PublicationDecade 2010
PublicationTitle Procedia engineering
PublicationYear 2017
Publisher Elsevier Ltd
Publisher_xml – name: Elsevier Ltd
References Chrysafis, Papadopoulos (bib0015) 2014; 26
Jeang (bib0020) 2015; 53
Lai, Hwang (bib0040) 1992; 49
Azaron, Moghaddam (bib0010) 2006; 181
Liang, Huang, Yang (bib0035) 2012; 46
Chrysafis, Papadopoulos (bib0005) 2014; 26
Creemers, DeReyck, Leus (bib0025) 2015; 242
Zimmermann (bib0050) 1978; 1
Yaghoubi, Noori, Azaron, Fynes (bib0030) 2015; 247
Hwang, Yoon (bib0045) 1981
Hwang (10.1016/j.proeng.2017.01.186_bib0045) 1981
Lai (10.1016/j.proeng.2017.01.186_bib0040) 1992; 49
Azaron (10.1016/j.proeng.2017.01.186_bib0010) 2006; 181
Liang (10.1016/j.proeng.2017.01.186_bib0035) 2012; 46
Zimmermann (10.1016/j.proeng.2017.01.186_bib0050) 1978; 1
Creemers (10.1016/j.proeng.2017.01.186_bib0025) 2015; 242
Jeang (10.1016/j.proeng.2017.01.186_bib0020) 2015; 53
Chrysafis (10.1016/j.proeng.2017.01.186_bib0015) 2014; 26
Chrysafis (10.1016/j.proeng.2017.01.186_bib0005) 2014; 26
Yaghoubi (10.1016/j.proeng.2017.01.186_bib0030) 2015; 247
References_xml – volume: 49
  start-page: 121
  year: 1992
  end-page: 133
  ident: bib0040
  article-title: A new approach to some possibilistic linear programming problems
  publication-title: Fuzzy Set Syst
– volume: 53
  start-page: 1503
  year: 2015
  end-page: 1526
  ident: bib0020
  article-title: Project management for uncertainty with multiple objectives optimisation of time, cost and reliability
  publication-title: Int J Prod Res
– volume: 26
  start-page: 577
  year: 2014
  end-page: 587
  ident: bib0015
  article-title: Approaching activity duration in PERT by means of fuzzy sets theory and statistics
  publication-title: J Intell Fuzzy Syst
– volume: 242
  start-page: 465
  year: 2015
  end-page: 476
  ident: bib0025
  article-title: Project planning with alternative technologies in uncertain environments
  publication-title: Eur J Oper Res
– volume: 46
  start-page: 1451
  year: 2012
  end-page: 1470
  ident: bib0035
  article-title: Application of fuzzy mathematical programming to imprecise project management decisions
  publication-title: Qual Quant
– volume: 26
  start-page: 577
  year: 2014
  end-page: 587
  ident: bib0005
  article-title: Approaching activity duration in PERT by means of fuzzy sets theory and statistics
  publication-title: J Intell Fuzzy Syst
– volume: 1
  start-page: 45
  year: 1978
  end-page: 55
  ident: bib0050
  article-title: Fuzzy programming and linear programming with several objective functions
  publication-title: Fuzzy Set Syst
– volume: 247
  start-page: 879
  year: 2015
  end-page: 894
  ident: bib0030
  article-title: Resource allocation in multi-class dynamic PERT networks with finite capacity
  publication-title: Eur J Oper Res
– volume: 181
  start-page: 163
  year: 2006
  end-page: 174
  ident: bib0010
  article-title: A multi-objective resource allocation problem in dynamic PERT networks
  publication-title: Appl Math Comput
– year: 1981
  ident: bib0045
  article-title: Multiple attribute decision making: methods and applications
– volume: 53
  start-page: 1503
  year: 2015
  ident: 10.1016/j.proeng.2017.01.186_bib0020
  article-title: Project management for uncertainty with multiple objectives optimisation of time, cost and reliability
  publication-title: Int J Prod Res
  doi: 10.1080/00207543.2014.952792
– volume: 247
  start-page: 879
  year: 2015
  ident: 10.1016/j.proeng.2017.01.186_bib0030
  article-title: Resource allocation in multi-class dynamic PERT networks with finite capacity
  publication-title: Eur J Oper Res
  doi: 10.1016/j.ejor.2015.06.038
– volume: 46
  start-page: 1451
  year: 2012
  ident: 10.1016/j.proeng.2017.01.186_bib0035
  article-title: Application of fuzzy mathematical programming to imprecise project management decisions
  publication-title: Qual Quant
  doi: 10.1007/s11135-011-9460-y
– volume: 49
  start-page: 121
  issue: 2
  year: 1992
  ident: 10.1016/j.proeng.2017.01.186_bib0040
  article-title: A new approach to some possibilistic linear programming problems
  publication-title: Fuzzy Set Syst
  doi: 10.1016/0165-0114(92)90318-X
– volume: 26
  start-page: 577
  issue: 2
  year: 2014
  ident: 10.1016/j.proeng.2017.01.186_bib0005
  article-title: Approaching activity duration in PERT by means of fuzzy sets theory and statistics
  publication-title: J Intell Fuzzy Syst
  doi: 10.3233/IFS-120751
– volume: 181
  start-page: 163
  issue: 1
  year: 2006
  ident: 10.1016/j.proeng.2017.01.186_bib0010
  article-title: A multi-objective resource allocation problem in dynamic PERT networks
  publication-title: Appl Math Comput
  doi: 10.1016/j.amc.2006.01.027
– year: 1981
  ident: 10.1016/j.proeng.2017.01.186_bib0045
– volume: 1
  start-page: 45
  year: 1978
  ident: 10.1016/j.proeng.2017.01.186_bib0050
  article-title: Fuzzy programming and linear programming with several objective functions
  publication-title: Fuzzy Set Syst
  doi: 10.1016/0165-0114(78)90031-3
– volume: 26
  start-page: 577
  issue: 2
  year: 2014
  ident: 10.1016/j.proeng.2017.01.186_bib0015
  article-title: Approaching activity duration in PERT by means of fuzzy sets theory and statistics
  publication-title: J Intell Fuzzy Syst
  doi: 10.3233/IFS-120751
– volume: 242
  start-page: 465
  year: 2015
  ident: 10.1016/j.proeng.2017.01.186_bib0025
  article-title: Project planning with alternative technologies in uncertain environments
  publication-title: Eur J Oper Res
  doi: 10.1016/j.ejor.2014.11.014
SSID ssj0000070251
Score 2.115452
Snippet A project management model is developed for constructing a renewable energy plant in this research. Program evaluation and review technique (PERT) is applied...
SourceID crossref
elsevier
SourceType Enrichment Source
Index Database
Publisher
StartPage 145
SubjectTerms fuzzy
program evaluation and review technique (PERT)
project management
Renewable energy
Title Project Management Model for Constructing a Renewable Energy Plant
URI https://dx.doi.org/10.1016/j.proeng.2017.01.186
Volume 174
WOSCitedRecordID wos000399998200017&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVHPJ
  databaseName: ROAD: Directory of Open Access Scholarly Resources
  customDbUrl:
  eissn: 1877-7058
  dateEnd: 20181231
  omitProxy: false
  ssIdentifier: ssj0000070251
  issn: 1877-7058
  databaseCode: M~E
  dateStart: 20090101
  isFulltext: true
  titleUrlDefault: https://road.issn.org
  providerName: ISSN International Centre
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV3LaxYxEA9aPehB6otWW8nBW8nHZpNvkxzbUvkEKQU_pZ6WbDYBi66lD6ke_Ns7k2QftsUXeFl2w2azO_NjMjvM_IaQl5KXlQ3BsuCcZNJXlllhWiZ1YbEnpAgxpvv-jdrf14eH5iCXK57GdgKq6_TFhTn-r6qGMVA2ls7-hbqHh8IAnIPS4Qhqh-MfKf4gxVYmiS2x4VmsU4z9ORNjLNYmgnDBq47FU3upBhB7GP0UrY-FBIChLT8SF15J4tn-_G1rMXs9G2x3DkEvPPtgz0fc5OHl93O27J-S4w2psDKFv_oSmDHfCC2mVoqpIvGvz_wNY72ZVXJiKHkikcx7Lk9E0tfMeYosHOFmAl-JiXgKSVb5VfbsuB-_xWVxVY5WS1f6NrlTKvhhwoTOH2PkDRmOytiXc3jPvqYyJv5dX-xmn2XihyxXyYP8A0G3k-Ifklu-e0TuT2glH5OdDAE6QoBGCFCAAJ1CgFo6QIAmCNAIgSfk3au95e6C5V4ZzElenDHR8LYM3HFfVY02paqUabjVRdlyFZT1StjGWNtqLYVTsp0Hb7kQ4I5YgZkYT8lK96Xza4SKuWuLwsl5qIQ0bTCNME6YRnuNLYPFOhG9NGqXieSxn8mnus8YPKqTDGuUYV3wGmS4Ttgw6zgRqfzmftULus7OYHLyagDHL2c---eZz8k9vEoRtg2yAsrwm-Su-3r28fTkRUTRJVvJg38
linkProvider ISSN International Centre
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Project+Management+Model+for+Constructing+a+Renewable+Energy+Plant&rft.jtitle=Procedia+engineering&rft.au=Lee%2C+Amy+H.I.&rft.au=Kang%2C+He-Yau&rft.au=Huang%2C+Tzu-Ting&rft.date=2017&rft.pub=Elsevier+Ltd&rft.issn=1877-7058&rft.eissn=1877-7058&rft.volume=174&rft.spage=145&rft.epage=154&rft_id=info:doi/10.1016%2Fj.proeng.2017.01.186&rft.externalDocID=S1877705817301868
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1877-7058&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1877-7058&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1877-7058&client=summon