A note: flowshop scheduling with linear deterioration and job-rejection

We study a scheduling problem on an m -machine flowshop with linear deterioration of job processing times and job rejection. The objectives are minimum makespan and minimum total load, subject to an upper bound on the total permitted rejection cost. The problems are NP-hard (since the single machine...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:4OR Jg. 19; H. 1; S. 103 - 111
Hauptverfasser: Mor, Baruch, Mosheiov, Gur
Format: Journal Article
Sprache:Englisch
Veröffentlicht: Berlin/Heidelberg Springer Berlin Heidelberg 01.03.2021
Springer Nature B.V
Schlagworte:
ISSN:1619-4500, 1614-2411
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:We study a scheduling problem on an m -machine flowshop with linear deterioration of job processing times and job rejection. The objectives are minimum makespan and minimum total load, subject to an upper bound on the total permitted rejection cost. The problems are NP-hard (since the single machine makespan minimization version was shown to be hard), and we introduce pseudo-polynomial dynamic programming algorithms, thus proving that both problems are NP-hard in the ordinary sense.
Bibliographie:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:1619-4500
1614-2411
DOI:10.1007/s10288-020-00436-z