A note: flowshop scheduling with linear deterioration and job-rejection
We study a scheduling problem on an m -machine flowshop with linear deterioration of job processing times and job rejection. The objectives are minimum makespan and minimum total load, subject to an upper bound on the total permitted rejection cost. The problems are NP-hard (since the single machine...
Uloženo v:
| Vydáno v: | 4OR Ročník 19; číslo 1; s. 103 - 111 |
|---|---|
| Hlavní autoři: | , |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
Berlin/Heidelberg
Springer Berlin Heidelberg
01.03.2021
Springer Nature B.V |
| Témata: | |
| ISSN: | 1619-4500, 1614-2411 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | We study a scheduling problem on an
m
-machine flowshop with linear deterioration of job processing times and job rejection. The objectives are minimum makespan and minimum total load, subject to an upper bound on the total permitted rejection cost. The problems are NP-hard (since the single machine makespan minimization version was shown to be hard), and we introduce pseudo-polynomial dynamic programming algorithms, thus proving that both problems are NP-hard in the ordinary sense. |
|---|---|
| Bibliografie: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
| ISSN: | 1619-4500 1614-2411 |
| DOI: | 10.1007/s10288-020-00436-z |