Mor, B., & Mosheiov, G. (2021). A note: Flowshop scheduling with linear deterioration and job-rejection. 4OR, 19(1), 103-111. https://doi.org/10.1007/s10288-020-00436-z
Chicago Style (17th ed.) CitationMor, Baruch, and Gur Mosheiov. "A Note: Flowshop Scheduling with Linear Deterioration and Job-rejection." 4OR 19, no. 1 (2021): 103-111. https://doi.org/10.1007/s10288-020-00436-z.
MLA (9th ed.) CitationMor, Baruch, and Gur Mosheiov. "A Note: Flowshop Scheduling with Linear Deterioration and Job-rejection." 4OR, vol. 19, no. 1, 2021, pp. 103-111, https://doi.org/10.1007/s10288-020-00436-z.
Warning: These citations may not always be 100% accurate.