Scheduling Jobs on a Single Machine With Dirt Cleaning Consideration to Minimize Total Completion Time
This paper studies a single-machine scheduling problem observed in the wafer manufacturing process, where the machine must receive periodical maintenance so that the dirt generated in the process does not exceed the limit. The objective is to minimize the total completion times. A mixed binary integ...
Uloženo v:
| Vydáno v: | IEEE access Ročník 7; s. 22290 - 22300 |
|---|---|
| Hlavní autoři: | , , , , |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
Piscataway
IEEE
2019
The Institute of Electrical and Electronics Engineers, Inc. (IEEE) |
| Témata: | |
| ISSN: | 2169-3536, 2169-3536 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | This paper studies a single-machine scheduling problem observed in the wafer manufacturing process, where the machine must receive periodical maintenance so that the dirt generated in the process does not exceed the limit. The objective is to minimize the total completion times. A mixed binary integer programming model is formulated, and, due to its computational intractability for large problems, three effective heuristics are proposed based on our developed properties. The proposed heuristics are evaluated by comparison with exact solutions on small problems and with lower bounds on large problems. The experimental results show that the INDEX-LOE heuristic yields high-quality solutions in comparison with those obtained from the other two heuristics. Furthermore, the impacts of dirt accumulation and cleaning time are discussed in detail. |
|---|---|
| Bibliografie: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
| ISSN: | 2169-3536 2169-3536 |
| DOI: | 10.1109/ACCESS.2019.2898905 |