Optimization of hydraulic fracturing wastewater management alternatives: A hybrid multi-objective linear programming model

Production of high volumes of wastewater by hydraulic fracturing operations is a challenging issue in the unconventional gas industry in North America. A scheduling-based solution is required to optimally manage the produced wastewater. This study develops a novel, hybrid, multi-objective linear pro...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of cleaner production Jg. 286; S. 124950
Hauptverfasser: Shamloo, Nazila, Bakhtavar, Ezzeddin, Hewage, Kasun, Sadiq, Rehan
Format: Journal Article
Sprache:Englisch
Veröffentlicht: Elsevier Ltd 01.03.2021
Schlagworte:
ISSN:0959-6526, 1879-1786
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!