A Multi-Objective Mathematical Programming Model for Project-Scheduling Optimization Considering Customer Satisfaction in Construction Projects

The aim of this study was to develop a multi-objective mathematical programming model for the trade-off of time, cost, and quality in the project-scheduling problem (PSP) by taking priorities and resource constraints as well as activity preemption into account. First, a small-sized problem instance...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:Mathematics (Basel) Ročník 12; číslo 2; s. 211
Hlavní autoři: Zohrehvandi, Mehrnoosh, Zohrehvandi, Shakib, Khalilzadeh, Mohammad, Amiri, Maghsoud, Jolai, Fariborz, Zavadskas, Edmundas Kazimieras, Antucheviciene, Jurgita
Médium: Journal Article
Jazyk:angličtina
Vydáno: Basel MDPI AG 01.01.2024
Témata:
ISSN:2227-7390, 2227-7390
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Abstract The aim of this study was to develop a multi-objective mathematical programming model for the trade-off of time, cost, and quality in the project-scheduling problem (PSP) by taking priorities and resource constraints as well as activity preemption into account. First, a small-sized problem instance that was a sub-project of an oil and gas construction project was used for te validation of the proposed model and algorithm. Subsequently, considering the sensitivity, complexity, and importance of oil and gas projects, the proposed model was implemented in a large-sized oil and gas construction project. Considering the NP-hardness of this problem, the NSGA-II metaheuristic algorithm was used to deal with the time, cost, and quality trade-off problem. Finally, a sensitivity analysis was implemented on the three main parameters of time, cost, and quality to investigate the effects of changes on the results. The findings show that the proposed model is more sensitive to cost changes, so an increase in project costs leads to a drastic change in the values of other objective functions.
AbstractList The aim of this study was to develop a multi-objective mathematical programming model for the trade-off of time, cost, and quality in the project-scheduling problem (PSP) by taking priorities and resource constraints as well as activity preemption into account. First, a small-sized problem instance that was a sub-project of an oil and gas construction project was used for te validation of the proposed model and algorithm. Subsequently, considering the sensitivity, complexity, and importance of oil and gas projects, the proposed model was implemented in a large-sized oil and gas construction project. Considering the NP-hardness of this problem, the NSGA-II metaheuristic algorithm was used to deal with the time, cost, and quality trade-off problem. Finally, a sensitivity analysis was implemented on the three main parameters of time, cost, and quality to investigate the effects of changes on the results. The findings show that the proposed model is more sensitive to cost changes, so an increase in project costs leads to a drastic change in the values of other objective functions.
Audience Academic
Author Khalilzadeh, Mohammad
Antucheviciene, Jurgita
Amiri, Maghsoud
Zohrehvandi, Shakib
Zavadskas, Edmundas Kazimieras
Zohrehvandi, Mehrnoosh
Jolai, Fariborz
Author_xml – sequence: 1
  givenname: Mehrnoosh
  surname: Zohrehvandi
  fullname: Zohrehvandi, Mehrnoosh
– sequence: 2
  givenname: Shakib
  orcidid: 0000-0003-2462-999X
  surname: Zohrehvandi
  fullname: Zohrehvandi, Shakib
– sequence: 3
  givenname: Mohammad
  orcidid: 0000-0002-2373-8505
  surname: Khalilzadeh
  fullname: Khalilzadeh, Mohammad
– sequence: 4
  givenname: Maghsoud
  surname: Amiri
  fullname: Amiri, Maghsoud
– sequence: 5
  givenname: Fariborz
  orcidid: 0000-0003-0824-8513
  surname: Jolai
  fullname: Jolai, Fariborz
– sequence: 6
  givenname: Edmundas Kazimieras
  orcidid: 0000-0002-3201-949X
  surname: Zavadskas
  fullname: Zavadskas, Edmundas Kazimieras
– sequence: 7
  givenname: Jurgita
  orcidid: 0000-0002-1734-3216
  surname: Antucheviciene
  fullname: Antucheviciene, Jurgita
BookMark eNptUctq3DAUNSWFpml2_QBDt3Uqy5ItL4ehj0CGKaRdCz2uJhpsayrJhfQn-su9HqcQSnUXku55IJ37uriYwgRF8bYmN03Tkw-jyg81JVh1_aK4pJR2VYfAxbPzq-I6pSPB1deNYP1l8XtT7uYh-2qvj2Cy_wnlDo0A3bxRQ_k1hkNU4-inQ7kLFobShbh0F3Z1bx7AzsMC7k_Zj_4XysJUbsOUvIW4ANs55TBCLO8RS06ZM8OvpBzn9f7kmN4UL50aElw_7VfF908fv22_VHf7z7fbzV1lGGlzpcER6LVgmteuJ4JbqpVjNbQM6p4T0XNtgCvqdMtYJ7RpiGa95pZroUjXXBW3q68N6ihP0Y8qPsqgvDw3QjxIFTGCAaRBC2us5sIaxkEpy4A3GKfiFkSr0Ovd6nWK4ccMKctjmOOEz5e0r0UnMO8WWTcr66DQ1E8u5KgMloXRG5yl89jfIBsVglIU0FVgYkgpgpPG53O-KPSDrIlcBi-fDx5F7_8R_f3bf-l_AB2dtMo
CitedBy_id crossref_primary_10_3390_infrastructures9020024
crossref_primary_10_3390_app15084089
Cites_doi 10.1016/j.cor.2019.05.004
10.1007/s10668-022-02370-y
10.1287/opre.9.3.296
10.1016/j.autcon.2018.09.009
10.1016/S0263-7863(98)00043-X
10.1016/j.eswa.2023.121660
10.3390/sym13122402
10.1016/j.ejor.2019.02.030
10.1061/(ASCE)CO.1943-7862.0001451
10.1080/00207543.2022.2074322
10.1007/978-3-030-24835-2
10.1016/0377-2217(94)00202-9
10.3390/su131910922
10.1016/j.eswa.2013.08.081
10.1016/j.aci.2014.02.003
10.1108/ECAM-02-2021-0177
10.1287/mnsc.20.6.990
10.1016/j.ijproman.2011.05.004
10.1016/j.jngse.2017.04.033
10.3390/sym12040594
10.1108/JEDT-11-2020-0463
10.3390/su10030680
10.1007/s12667-019-00374-8
10.1080/09544120050135533
10.1061/(ASCE)0733-9364(2005)131:4(477)
10.1016/j.eswa.2014.11.032
ContentType Journal Article
Copyright COPYRIGHT 2024 MDPI AG
2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.
Copyright_xml – notice: COPYRIGHT 2024 MDPI AG
– notice: 2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.
DBID AAYXX
CITATION
3V.
7SC
7TB
7XB
8AL
8FD
8FE
8FG
8FK
ABJCF
ABUWG
AFKRA
ARAPS
AZQEC
BENPR
BGLVJ
CCPQU
DWQXO
FR3
GNUQQ
HCIFZ
JQ2
K7-
KR7
L6V
L7M
L~C
L~D
M0N
M7S
P62
PHGZM
PHGZT
PIMPY
PKEHL
PQEST
PQGLB
PQQKQ
PQUKI
PRINS
PTHSS
Q9U
DOA
DOI 10.3390/math12020211
DatabaseName CrossRef
ProQuest Central (Corporate)
Computer and Information Systems Abstracts
Mechanical & Transportation Engineering Abstracts
ProQuest Central (purchase pre-March 2016)
Computing Database (Alumni Edition)
Technology Research Database
ProQuest SciTech Collection
ProQuest Technology Collection
ProQuest Central (Alumni) (purchase pre-March 2016)
Materials Science & Engineering Collection
ProQuest Central (Alumni)
ProQuest Central UK/Ireland
Advanced Technologies & Computer Science Collection
ProQuest Central Essentials
ProQuest Central
Technology Collection
ProQuest One Community College
ProQuest Central Korea
Engineering Research Database
ProQuest Central Student
SciTech Premium Collection
ProQuest Computer Science Collection
Computer Science Database
Civil Engineering Abstracts
ProQuest Engineering Collection
Advanced Technologies Database with Aerospace
Computer and Information Systems Abstracts – Academic
Computer and Information Systems Abstracts Professional
Computing Database
Engineering Database
ProQuest Advanced Technologies & Aerospace Collection
ProQuest Central Premium
ProQuest One Academic (New)
Publicly Available Content Database
ProQuest One Academic Middle East (New)
ProQuest One Academic Eastern Edition (DO NOT USE)
One Applied & Life Sciences
ProQuest One Academic (retired)
ProQuest One Academic UKI Edition
ProQuest Central China
Engineering Collection
ProQuest Central Basic
DOAJ Directory of Open Access Journals
DatabaseTitle CrossRef
Publicly Available Content Database
Computer Science Database
ProQuest Central Student
Technology Collection
Technology Research Database
Computer and Information Systems Abstracts – Academic
ProQuest One Academic Middle East (New)
Mechanical & Transportation Engineering Abstracts
ProQuest Advanced Technologies & Aerospace Collection
ProQuest Central Essentials
ProQuest Computer Science Collection
Computer and Information Systems Abstracts
ProQuest Central (Alumni Edition)
SciTech Premium Collection
ProQuest One Community College
ProQuest Central China
ProQuest Central
ProQuest One Applied & Life Sciences
ProQuest Engineering Collection
ProQuest Central Korea
ProQuest Central (New)
Advanced Technologies Database with Aerospace
Engineering Collection
Advanced Technologies & Aerospace Collection
Civil Engineering Abstracts
ProQuest Computing
Engineering Database
ProQuest Central Basic
ProQuest Computing (Alumni Edition)
ProQuest One Academic Eastern Edition
ProQuest Technology Collection
ProQuest SciTech Collection
Computer and Information Systems Abstracts Professional
ProQuest One Academic UKI Edition
Materials Science & Engineering Collection
Engineering Research Database
ProQuest One Academic
ProQuest One Academic (New)
ProQuest Central (Alumni)
DatabaseTitleList
Publicly Available Content Database

CrossRef
Database_xml – sequence: 1
  dbid: DOA
  name: DOAJ Directory of Open Access Journals
  url: https://www.doaj.org/
  sourceTypes: Open Website
– sequence: 2
  dbid: PIMPY
  name: Publicly Available Content Database
  url: http://search.proquest.com/publiccontent
  sourceTypes: Aggregation Database
DeliveryMethod fulltext_linktorsrc
Discipline Mathematics
EISSN 2227-7390
ExternalDocumentID oai_doaj_org_article_cb64dcdb58dc45eaad4e53739a5de86a
A780878822
10_3390_math12020211
GeographicLocations Iran
GeographicLocations_xml – name: Iran
GroupedDBID -~X
5VS
85S
8FE
8FG
AADQD
AAFWJ
AAYXX
ABDBF
ABJCF
ABPPZ
ABUWG
ACIPV
ACIWK
ADBBV
AFFHD
AFKRA
AFPKN
AFZYC
ALMA_UNASSIGNED_HOLDINGS
AMVHM
ARAPS
AZQEC
BCNDV
BENPR
BGLVJ
BPHCQ
CCPQU
CITATION
DWQXO
GNUQQ
GROUPED_DOAJ
HCIFZ
IAO
ITC
K6V
K7-
KQ8
L6V
M7S
MODMG
M~E
OK1
PHGZM
PHGZT
PIMPY
PQGLB
PQQKQ
PROAC
PTHSS
RNS
3V.
7SC
7TB
7XB
8AL
8FD
8FK
FR3
JQ2
KR7
L7M
L~C
L~D
M0N
P62
PKEHL
PQEST
PQUKI
PRINS
Q9U
ID FETCH-LOGICAL-c406t-bef0e9b84b51f9085d2baf41e64e1950895bce5a2fb64478bc30b49b5d5b8a073
IEDL.DBID DOA
ISICitedReferencesCount 2
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=001150828900001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 2227-7390
IngestDate Fri Oct 03 12:53:03 EDT 2025
Sun Jul 13 04:39:06 EDT 2025
Tue Nov 04 18:40:00 EST 2025
Tue Nov 18 21:14:22 EST 2025
Sat Nov 29 07:09:49 EST 2025
IsDoiOpenAccess true
IsOpenAccess true
IsPeerReviewed true
IsScholarly true
Issue 2
Language English
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c406t-bef0e9b84b51f9085d2baf41e64e1950895bce5a2fb64478bc30b49b5d5b8a073
Notes ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ORCID 0000-0002-1734-3216
0000-0003-0824-8513
0000-0002-3201-949X
0000-0003-2462-999X
0000-0002-2373-8505
OpenAccessLink https://doaj.org/article/cb64dcdb58dc45eaad4e53739a5de86a
PQID 2918780006
PQPubID 2032364
ParticipantIDs doaj_primary_oai_doaj_org_article_cb64dcdb58dc45eaad4e53739a5de86a
proquest_journals_2918780006
gale_infotracacademiconefile_A780878822
crossref_citationtrail_10_3390_math12020211
crossref_primary_10_3390_math12020211
PublicationCentury 2000
PublicationDate 2024-01-01
PublicationDateYYYYMMDD 2024-01-01
PublicationDate_xml – month: 01
  year: 2024
  text: 2024-01-01
  day: 01
PublicationDecade 2020
PublicationPlace Basel
PublicationPlace_xml – name: Basel
PublicationTitle Mathematics (Basel)
PublicationYear 2024
Publisher MDPI AG
Publisher_xml – name: MDPI AG
References Creemers (ref_7) 2019; 277
Aluko (ref_22) 2020; 19
Olatunde (ref_35) 2017; 15
Ammar (ref_14) 2019; 22
Farughi (ref_26) 2018; 31
Tareghian (ref_5) 2006; 181
ref_11
ref_32
Sajedi (ref_29) 2018; 50
Eirgash (ref_41) 2019; 71
Alavipour (ref_4) 2019; 98
Maghsoudlou (ref_8) 2020; 12
Kim (ref_34) 2012; 30
Moniri (ref_42) 2020; 19
ref_16
ref_38
Banihashemi (ref_39) 2023; 25
ref_15
Demir (ref_43) 2024; 237
Babu (ref_2) 1996; 88
Kelley (ref_31) 1961; 9
Tavana (ref_1) 2014; 41
Roghanian (ref_13) 2018; 18
Wood (ref_37) 2017; 45
(ref_10) 2018; 14
Khang (ref_17) 1999; 17
Ghasemi (ref_27) 2023; 61
Alavipour (ref_19) 2018; 144
Aluko (ref_23) 2021; 20
ref_46
ref_45
ref_44
Cheraghi (ref_30) 2023; 30
ref_20
Kristensen (ref_21) 2000; 11
ref_40
Bagheri (ref_6) 2018; 8
Ogbu (ref_24) 2021; 20
ref_28
Kandil (ref_3) 2005; 131
Hu (ref_36) 2014; 2014
Vanhoucke (ref_9) 2019; 109
Monghasemi (ref_25) 2015; 42
Sarkar (ref_12) 2020; 22
Diehlmann (ref_18) 2021; 20
Patterson (ref_33) 1974; 20
References_xml – volume: 109
  start-page: 230
  year: 2019
  ident: ref_9
  article-title: Resource-constrained project scheduling with activity splitting and setup times
  publication-title: Comput. Oper. Res.
  doi: 10.1016/j.cor.2019.05.004
– volume: 22
  start-page: 1818
  year: 2020
  ident: ref_12
  article-title: Risk analysis by integrated fuzzy expected value method and fuzzy failure mode and effect analysis for an elevated metro rail project of Ahmedabad, India
  publication-title: Int. J. Constr. Manag.
– volume: 25
  start-page: 7737
  year: 2023
  ident: ref_39
  article-title: Towards sustainable project scheduling with reducing environmental pollution of projects: Fuzzy multi-objective programming approach to a case study of Eastern Iran
  publication-title: Environ. Dev. Sustain.
  doi: 10.1007/s10668-022-02370-y
– volume: 2014
  start-page: 673248
  year: 2014
  ident: ref_36
  article-title: An innovative time, cost, and quality tradeoff modeling of building construction project based on resource allocation
  publication-title: Sci. World J.
– volume: 9
  start-page: 296
  year: 1961
  ident: ref_31
  article-title: Critical-path planning and scheduling: Mathematical basis
  publication-title: Oper. Res.
  doi: 10.1287/opre.9.3.296
– volume: 20
  start-page: 1519
  year: 2021
  ident: ref_24
  article-title: Influence of selection criteria on clients’ satisfaction with construction consultancy services in Nigeria
  publication-title: J. Eng. Des. Technol.
– ident: ref_32
– volume: 19
  start-page: 966
  year: 2020
  ident: ref_42
  article-title: Turnaround project risk assessment using hybrid fuzzy SWARA and EDAS method: Case of upstream oil process industries in Iran
  publication-title: J. Eng. Des. Technol.
– volume: 98
  start-page: 110
  year: 2019
  ident: ref_4
  article-title: Time-cost tradeoff analysis with minimized project financing cost
  publication-title: Autom. Constr.
  doi: 10.1016/j.autcon.2018.09.009
– volume: 20
  start-page: 543
  year: 2021
  ident: ref_18
  article-title: Including decision-makers preferences in the cost-deprivation trade-off during disaster interventions
  publication-title: J. Eng. Des. Technol.
– volume: 17
  start-page: 249
  year: 1999
  ident: ref_17
  article-title: Time, cost and quality trade-off in project management: A case study
  publication-title: Int. J. Proj. Manag.
  doi: 10.1016/S0263-7863(98)00043-X
– volume: 15
  start-page: 619
  year: 2017
  ident: ref_35
  article-title: Quantitative appraisal of cost and time performance of construction projects in public and private universities in Osun State, Nigeria
  publication-title: J. Eng. Des. Technol.
– volume: 237
  start-page: 121660
  year: 2024
  ident: ref_43
  article-title: Sensitivity analysis in multi-criteria decision making: A state-of-the-art research perspective using bibliometric analysis
  publication-title: Expert Syst. Appl.
  doi: 10.1016/j.eswa.2023.121660
– ident: ref_16
– ident: ref_38
  doi: 10.3390/sym13122402
– volume: 277
  start-page: 238
  year: 2019
  ident: ref_7
  article-title: The preemptive stochastic resource-constrained project scheduling problem
  publication-title: Eur. J. Oper. Res.
  doi: 10.1016/j.ejor.2019.02.030
– volume: 50
  start-page: 1003
  year: 2018
  ident: ref_29
  article-title: Optimization of Time and Cost in Establishment of Temporary Accommodations after the Crisis
  publication-title: Amirkabir J. Civ. Eng.
– volume: 144
  start-page: 04018012
  year: 2018
  ident: ref_19
  article-title: Optimizing financing cost in construction projects with fixed project duration
  publication-title: J. Constr. Eng. Manag.
  doi: 10.1061/(ASCE)CO.1943-7862.0001451
– ident: ref_44
– volume: 19
  start-page: 557
  year: 2020
  ident: ref_22
  article-title: Relationship between perceived service quality and client satisfaction indicators of engineering consultancy services in building projects
  publication-title: J. Eng. Des. Technol.
– volume: 61
  start-page: 2963
  year: 2023
  ident: ref_27
  article-title: A new approach for production project scheduling with time, cost, and quality trade-off considering multi-mode resource-constraints under interval uncertainty
  publication-title: Int. J. Prod. Res.
  doi: 10.1080/00207543.2022.2074322
– ident: ref_45
  doi: 10.1007/978-3-030-24835-2
– volume: 88
  start-page: 320
  year: 1996
  ident: ref_2
  article-title: Project management with time, cost, and quality considerations
  publication-title: Eur. J. Oper. Res.
  doi: 10.1016/0377-2217(94)00202-9
– ident: ref_28
  doi: 10.3390/su131910922
– volume: 41
  start-page: 1830
  year: 2014
  ident: ref_1
  article-title: A new multi-objective multi-mode model for solving preemptive time–cost–quality trade-off project scheduling problems
  publication-title: Expert Syst. Appl.
  doi: 10.1016/j.eswa.2013.08.081
– volume: 14
  start-page: 192
  year: 2018
  ident: ref_10
  article-title: A solution procedure for preemptive multi-mode project scheduling problem with mode changeability to resumption
  publication-title: Appl. Comput. Inform.
  doi: 10.1016/j.aci.2014.02.003
– volume: 8
  start-page: 83
  year: 2018
  ident: ref_6
  article-title: Scheduling of construction projects using a combination of multi-objective programming and optimization via simulation
  publication-title: J. Prod. Oper. Manag.
– volume: 31
  start-page: 780
  year: 2018
  ident: ref_26
  article-title: Project scheduling with simultaneous optimization, time, net present value, and project flexibility for multimode activities with constrained renewable resources
  publication-title: Int. J. Eng.
– volume: 30
  start-page: 1578
  year: 2023
  ident: ref_30
  article-title: A multiproject scheduling and resource management model in projects construction
  publication-title: Eng. Constr. Archit. Manag.
  doi: 10.1108/ECAM-02-2021-0177
– volume: 20
  start-page: 990
  year: 1974
  ident: ref_33
  article-title: A horizon-varying, zero-one approach to project scheduling
  publication-title: Manag. Sci.
  doi: 10.1287/mnsc.20.6.990
– ident: ref_46
– volume: 30
  start-page: 264
  year: 2012
  ident: ref_34
  article-title: A practical approach to project scheduling: Considering the potential quality loss cost in the time–cost tradeoff problem
  publication-title: Int. J. Proj. Manag.
  doi: 10.1016/j.ijproman.2011.05.004
– volume: 45
  start-page: 143
  year: 2017
  ident: ref_37
  article-title: Gas and oil project time, cost, and quality tradeoff: Integrated stochastic and fuzzy multi-objective optimization applying a memetic, nondominated, sorting algorithm
  publication-title: J. Nat. Gas Sci. Eng.
  doi: 10.1016/j.jngse.2017.04.033
– ident: ref_15
  doi: 10.3390/sym12040594
– volume: 20
  start-page: 1057
  year: 2021
  ident: ref_23
  article-title: Perceived service quality of architectural consultancy firms and client satisfaction in building projects in Nigeria
  publication-title: J. Eng. Des. Technol.
– volume: 71
  start-page: 139
  year: 2019
  ident: ref_41
  article-title: A multi-objective decision-making model based on TLBO for the time–cost trade-off problems
  publication-title: Struct. Eng. Mech.
– ident: ref_11
  doi: 10.1108/JEDT-11-2020-0463
– volume: 181
  start-page: 1305
  year: 2006
  ident: ref_5
  article-title: On the discrete time, cost and quality trade-off problem
  publication-title: Appl. Math. Comput.
– volume: 22
  start-page: 252
  year: 2019
  ident: ref_14
  article-title: Criticality measurement in fuzzy project scheduling
  publication-title: Int. J. Constr. Manag.
– ident: ref_40
  doi: 10.3390/su10030680
– volume: 18
  start-page: 1
  year: 2018
  ident: ref_13
  article-title: An improved fuzzy critical chain approach in order to face uncertainty in project scheduling
  publication-title: Int. J. Constr. Manag.
– volume: 12
  start-page: 431
  year: 2020
  ident: ref_8
  article-title: A framework for preemptive multi-skilled project scheduling problem with time-of-use energy tariffs
  publication-title: Energy Syst.
  doi: 10.1007/s12667-019-00374-8
– volume: 11
  start-page: 1007
  year: 2000
  ident: ref_21
  article-title: Customer satisfaction measurement at post Denmark: Results of application of the European customer satisfaction index methodology
  publication-title: Total Qual. Manag.
  doi: 10.1080/09544120050135533
– volume: 131
  start-page: 477
  year: 2005
  ident: ref_3
  article-title: Time, cost, and quality trade-off analysis for highway construction
  publication-title: J. Constr. Eng. Manag.
  doi: 10.1061/(ASCE)0733-9364(2005)131:4(477)
– ident: ref_20
– volume: 42
  start-page: 3089
  year: 2015
  ident: ref_25
  article-title: A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects
  publication-title: Expert Syst. Appl.
  doi: 10.1016/j.eswa.2014.11.032
SSID ssj0000913849
Score 2.2702243
Snippet The aim of this study was to develop a multi-objective mathematical programming model for the trade-off of time, cost, and quality in the project-scheduling...
SourceID doaj
proquest
gale
crossref
SourceType Open Website
Aggregation Database
Enrichment Source
Index Database
StartPage 211
SubjectTerms activity preemption
Algorithms
Cost analysis
Customer satisfaction
Heuristic methods
Integer programming
Linear programming
Mathematical models
Mathematical programming
Mechanical properties
multi-objective optimization model
Multiple objective analysis
NSGA-II
Optimization
Parameter sensitivity
Production planning
project planning
Research methodology
Scheduling
Sensitivity analysis
time, cost, and quality trade-off
Tradeoffs
SummonAdditionalLinks – databaseName: Engineering Database
  dbid: M7S
  link: http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV1NT9wwEB0V2gMc2lKo2JZWPoA4IItNYm_sU7VFRT20gLRQcbP8FdqK3YVd4G_0L3fGcRZ6oBeu8dhyNJM3Y2fmDcB20ffRiUpwFVXgogwNd77yvK4GqtQFuoRUPvbjW310pM7P9Um-cJvntMoOExNQh6mnO_J9nKhqRej66eqaU9co-ruaW2gswXNiSShS6t5occdCnJdK6DbfvcLT_T5GgT8LPO-jZyv-8USJsP8xWE6-5vDVU3f5Gl7mKJMNW7NYg2dx8gZWvy8oWufr8GfIUvEtP3a_W9Bj9-M496RN3Bqja2PUMO2SYXhLT0maj1DXgZLYL9gxgs44V3Oyrv8nDRzcYmA5jjM2elBBwX61Qh1tbbfifAPODr-cHnzluTsD9xgE3HAXm37UTgkni0Zj5BZKZxtRxIGIqbesls5HacvGYcxVKzSBvhPaySCdsogsb2F5Mp3ETWAqUiCKE4oaF6hqbXGKs06VFheS_R7sdZoyPlOXUweNS4NHGNKreajXHuwspK9ayo5H5D6T0hcyRLSdHkxnFyZ_t8bjToIPTqrghYzWBhFlVVfayhDVwPZgl0zGEBzglrzNVQ34YkSsZYZoDWgRGIb1YKszGZNxYm7u7eXd_4ffwwpuWrSXP1uwjFqKH-CFv0MFzj4ms_8L65cPoA
  priority: 102
  providerName: ProQuest
Title A Multi-Objective Mathematical Programming Model for Project-Scheduling Optimization Considering Customer Satisfaction in Construction Projects
URI https://www.proquest.com/docview/2918780006
https://doaj.org/article/cb64dcdb58dc45eaad4e53739a5de86a
Volume 12
WOSCitedRecordID wos001150828900001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVAON
  databaseName: DOAJ Directory of Open Access Journals
  customDbUrl:
  eissn: 2227-7390
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0000913849
  issn: 2227-7390
  databaseCode: DOA
  dateStart: 20130101
  isFulltext: true
  titleUrlDefault: https://www.doaj.org/
  providerName: Directory of Open Access Journals
– providerCode: PRVHPJ
  databaseName: ROAD: Directory of Open Access Scholarly Resources
  customDbUrl:
  eissn: 2227-7390
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0000913849
  issn: 2227-7390
  databaseCode: M~E
  dateStart: 20130101
  isFulltext: true
  titleUrlDefault: https://road.issn.org
  providerName: ISSN International Centre
– providerCode: PRVPQU
  databaseName: Computer Science Database
  customDbUrl:
  eissn: 2227-7390
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0000913849
  issn: 2227-7390
  databaseCode: K7-
  dateStart: 20130301
  isFulltext: true
  titleUrlDefault: http://search.proquest.com/compscijour
  providerName: ProQuest
– providerCode: PRVPQU
  databaseName: Engineering Database
  customDbUrl:
  eissn: 2227-7390
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0000913849
  issn: 2227-7390
  databaseCode: M7S
  dateStart: 20130301
  isFulltext: true
  titleUrlDefault: http://search.proquest.com
  providerName: ProQuest
– providerCode: PRVPQU
  databaseName: Proquest Central
  customDbUrl:
  eissn: 2227-7390
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0000913849
  issn: 2227-7390
  databaseCode: BENPR
  dateStart: 20130301
  isFulltext: true
  titleUrlDefault: https://www.proquest.com/central
  providerName: ProQuest
– providerCode: PRVPQU
  databaseName: Publicly Available Content Database
  customDbUrl:
  eissn: 2227-7390
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0000913849
  issn: 2227-7390
  databaseCode: PIMPY
  dateStart: 20130301
  isFulltext: true
  titleUrlDefault: http://search.proquest.com/publiccontent
  providerName: ProQuest
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrR3LbhMx0EKlBzhUtIAItJEPRRyQ1X3YsX1Mq1Qg2nRFAJWT5de2RU2KGuDIL_DLzNi7IRwqLlx88Iwt2zM7j9U8CNkvCx8drzlTUQXGq9Ay52vPZD1SlS5BJaT0sU8ncjpV5-e6WWv1hTFhuTxwfrgD70Y8-OCECp6LaG3gUdSy1laEqEbJNCqkXnOmkgzWZa24zpHuNfj1B2D_XZbg6YNOK__SQalU_10COWmZ40dkqzMP6Tgfa5vci4sd8vB0VVt1-Zj8GtOUNcvO3JcsregfOKxtcsTVHHQSxU5n1xTsUpxFbDYDIgWMPr-gZyAt5l0aJu0bdyLg6DtYhPN4S2drqQ_0KiP19Wb7HZdPyMfjyYejN6xrq8A8aO9vzMW2iNop7kTZajC5QuVsy8s44jE1hdXC-Shs1cLTc6mAdoXj2okgnLIgEp6SjcXNIj4jVEW0IGFBKWGDWmoLS5x1qrKwkSgG5HX_0MZ3Ncex9cW1Ad8DyWLWyTIgL1fYX3OtjTvwDpFmKxyskJ0mgG9MxzfmX3wzIK-Q4ga_YziSt106AlwMK2KZsVSFkuB_VAOy2zOF6T7wpQE-Bigq--f_4zQvyAO4Gs__dnbJBtAy7pFN_wPIfDsk9w8n0-b9MPE4jO8kG2KQ6gzHnxOAN29Pm8-_ASzNCdM
linkProvider Directory of Open Access Journals
linkToHtml http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMw1V1LT1QxFD5BNBEWvomjqF1IXJiG-2jntgtjRpRAZhhIQMOu9nUBw8zAjI_4K_wn_kbPuY8BF7hj4bY9bXrbr-d87e05B-BlmvjoRC64iipwkYWSO597XuRdlekUTULlPvZpUAyH6vBQ7y3A79YXhp5VtjqxUtRh4umOfB0bqkKRdn17ds4paxT9XW1TaNSw6MefP_DINnuz_R7Xdy3LNj8cbGzxJqsA92i8vnIXyyRqp4STaamRcYTM2VKksStilRNVS-ejtFnpkCsUCoeeOKGdDNIpizsC-70BN0WuCtpX_YLP73QoxqYSun5fn-c6WUfWeZxmSMmyNP3L8lUJAq4yA5Vt27z7v83KPbjTsGjWq2F_Hxbi-AEs78xD0M4ewq8eq5yL-a77Uit1dlGPbffqh2kjNN2MEsKdMqTvVErSfB-xHOiR_hHbRaU6arxVWZvflCo2viFxHsUp27_kIcJOaqE2LG_b4-wRfLyWGVmBxfFkHB8DU5GINjZIC-wgL7TFJs46lVnsSCYdeN0iw_gmNDtlCDk1eEQjHJnLOOrA2lz6rA5JcoXcOwLZXIYCiVcFk-mRafSS8TiS4IOTKngho7VBRJkXubYyRNW1HXhFEDWk7nBI3jZeG_hhFDjM9BB9iECkmR1YbSFqGj04Mxf4fPLv6hdwe-tgZ2AG28P-U1jCDxD1RdcqLOKKxWdwy3_HxZw-r7Ycg8_XjeY_3a1tIQ
linkToPdf http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMw1V1LbxMxEB6VFCE48EYECvhAxQFZ2fXaWfuAUGiJiNqmKxVQezJ-bVvUJCXhIX4F_4dfx3gfaTmUWw9c12PLa3-e-dY7D4DnaeKC5RmnMkhPOfMltS5zNM_6kqkUTUIVPvZxOx-P5f6-KlbgdxsLE90qW51YKWo_c_GOvIcdZS6jdu2VjVtEsTl8ffqFxgpS8U9rW06jhshW-PkDP98Wr0abuNfrjA3fvt94R5sKA9ShIftKbSiToKzkVqSlQvbhmTUlT0Ofh6o-qhLWBWFYaZE35BJfI7FcWeGFlQZPB457BVaRknPWgdVitFMcLG94YsZNyVXtbZ9lKukhBz1KGRI0lqZ_2cGqXMBFRqGydMNb__Ma3YabDb8mg_pA3IGVML0LN3aWyWkX9-DXgFRhx3TXfq7VPTlrx75F7bI2QaNOYqm4E4LEPj6N0nQPUe6j-_4h2UV1O2niWElb-TQ2bHxDSj0Jc7J3LnaEHNdCbcLedsTFffhwKSvyADrT2TQ8BCJDpODYIc1xgCxXBrtYYyUzOJBIuvCyRYl2TdL2WDvkROPHW8SUPo-pLqwvpU_rZCUXyL2JgFvKxBTj1YPZ_FA3Gks7nIl33grpHRfBGM-DyPJMGeGD7JsuvIhw1VER4pScaeI58MViSjE9QCQiGpGAdmGthatuNORCn2H10b-bn8E1BLHeHo23HsN1nD-vb8DWoIMbFp7AVfcd93L-tDl_BD5dNpz_ACfEd6I
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=A+Multi-Objective+Mathematical+Programming+Model+for+Project-Scheduling+Optimization+Considering+Customer+Satisfaction+in+Construction+Projects&rft.jtitle=Mathematics+%28Basel%29&rft.au=Mehrnoosh+Zohrehvandi&rft.au=Shakib+Zohrehvandi&rft.au=Mohammad+Khalilzadeh&rft.au=Maghsoud+Amiri&rft.date=2024-01-01&rft.pub=MDPI+AG&rft.eissn=2227-7390&rft.volume=12&rft.issue=2&rft.spage=211&rft_id=info:doi/10.3390%2Fmath12020211&rft.externalDBID=DOA&rft.externalDocID=oai_doaj_org_article_cb64dcdb58dc45eaad4e53739a5de86a
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=2227-7390&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=2227-7390&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=2227-7390&client=summon