Coordination-based reactive resource-constrained project scheduling
Due to the increasing use of prefabricated building blocks in construction projects, on-site storages with limited space need to be utilized more efficiently to start the construction activities relating to the blocks on time. Especially when the construction schedule is disrupted by an unexpected e...
Gespeichert in:
| Veröffentlicht in: | Procedia CIRP Jg. 81; S. 51 - 56 |
|---|---|
| Hauptverfasser: | , , , |
| Format: | Journal Article |
| Sprache: | Englisch |
| Veröffentlicht: |
Elsevier B.V
2019
|
| Schlagworte: | |
| ISSN: | 2212-8271, 2212-8271 |
| Online-Zugang: | Volltext |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
| Abstract | Due to the increasing use of prefabricated building blocks in construction projects, on-site storages with limited space need to be utilized more efficiently to start the construction activities relating to the blocks on time. Especially when the construction schedule is disrupted by an unexpected event, it needs to be revised by coordinating the delivery times of prefabricated blocks from suppliers, subject to the limited storage space, for minimizing the impact on the project duration. In this paper, a coordination-based reactive scheduling procedure is proposed for a reactive multimode resource-constrained project scheduling problem with limited on-site storage space and its effectiveness is validated through computational experiments. The authors expect that the proposed procedure is also applicable to engineer-to-order (ETO) and make-to-order (MTO) manufacturing systems with limited on-site storage space for raw materials. |
|---|---|
| AbstractList | Due to the increasing use of prefabricated building blocks in construction projects, on-site storages with limited space need to be utilized more efficiently to start the construction activities relating to the blocks on time. Especially when the construction schedule is disrupted by an unexpected event, it needs to be revised by coordinating the delivery times of prefabricated blocks from suppliers, subject to the limited storage space, for minimizing the impact on the project duration. In this paper, a coordination-based reactive scheduling procedure is proposed for a reactive multimode resource-constrained project scheduling problem with limited on-site storage space and its effectiveness is validated through computational experiments. The authors expect that the proposed procedure is also applicable to engineer-to-order (ETO) and make-to-order (MTO) manufacturing systems with limited on-site storage space for raw materials. |
| Author | Cai, Tian Xiang Chua, Tay Jin Joo, Byung Jun Chua, Ping Chong |
| Author_xml | – sequence: 1 givenname: Byung Jun surname: Joo fullname: Joo, Byung Jun email: joobj@SIMTech.a-star.edu.sg – sequence: 2 givenname: Tay Jin surname: Chua fullname: Chua, Tay Jin – sequence: 3 givenname: Tian Xiang surname: Cai fullname: Cai, Tian Xiang – sequence: 4 givenname: Ping Chong surname: Chua fullname: Chua, Ping Chong |
| BookMark | eNqFkMFKAzEQhoNUsNa-gYe-wK6TZLNpPQiyaBUKXvQcssmsZqlJSbYF396s9SAedC4zMPz__POdk4kPHgm5pFBSoPVVX-5iMC6WDOiqBF4ChRMyZYyyYskknfyYz8g8pR5yyQo4ZVPSNCFE67weXPBFqxPaRURtBnfAPKSwjwYLE3waonY-b_O1Hs2wSOYN7X7r_OsFOe30NuH8u8_Iy_3dc_NQbJ7Wj83tpjAViKGwAgSzlnVMVzVK0XUrhiBs23FhRbu0Fc07KTTTtG65EJov84MatAQp64rPyPXR18SQUsROGTd8BR-zbRUFNRJRvToSUSMRBVxlIllc_RLvonvX8eM_2c1Rhvmxg8OoknHoDVoXMwVlg_vb4BMxbn_Y |
| CitedBy_id | crossref_primary_10_1108_ECAM_04_2024_0479 crossref_primary_10_1016_j_autcon_2024_105388 crossref_primary_10_1109_ACCESS_2021_3063766 |
| Cites_doi | 10.1007/s12159-016-0136-9 10.1016/j.habitatint.2014.04.001 10.1007/s10845-015-1085-x 10.1186/s40327-015-0020-8 10.1016/j.asoc.2016.07.030 10.1061/(ASCE)0733-9364(2001)127:6(494) 10.1109/IEEM.2017.8290294 10.1016/j.autcon.2012.12.010 10.1016/j.autcon.2009.02.002 10.1016/j.autcon.2014.03.017 |
| ContentType | Journal Article |
| Copyright | 2019 The Author(s) |
| Copyright_xml | – notice: 2019 The Author(s) |
| DBID | 6I. AAFTH AAYXX CITATION |
| DOI | 10.1016/j.procir.2019.03.010 |
| DatabaseName | ScienceDirect Open Access Titles Elsevier:ScienceDirect:Open Access CrossRef |
| DatabaseTitle | CrossRef |
| DatabaseTitleList | |
| DeliveryMethod | fulltext_linktorsrc |
| Discipline | Engineering |
| EISSN | 2212-8271 |
| EndPage | 56 |
| ExternalDocumentID | 10_1016_j_procir_2019_03_010 S2212827119303154 |
| GroupedDBID | 0R~ 0SF 4.4 457 6I. AACTN AAEDT AAEDW AAFTH AAIKJ AALRI AAXUO ABMAC ACGFS ADBBV ADEZE AEXQZ AFTJW AGHFR AITUG ALMA_UNASSIGNED_HOLDINGS AMRAJ EBS EJD FDB HZ~ IXB KQ8 M41 M~E NCXOZ O-L O9- OK1 RIG ROL SSZ AAYWO AAYXX ACVFH ADCNI ADVLN AEUPX AFPUW AIGII AKBMS AKRWK AKYEP CITATION |
| ID | FETCH-LOGICAL-c405t-d5052dd2f2a46e75ff92e05dbf35d5b8d412f275a2a16b355a38016a0a7077643 |
| ISICitedReferencesCount | 4 |
| ISICitedReferencesURI | http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000566264700010&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| ISSN | 2212-8271 |
| IngestDate | Tue Nov 18 22:35:07 EST 2025 Wed Nov 05 20:34:21 EST 2025 Wed May 17 02:11:24 EDT 2023 |
| IsDoiOpenAccess | true |
| IsOpenAccess | true |
| IsPeerReviewed | true |
| IsScholarly | true |
| Keywords | prefabrication penalty negotiation Project scheduling reward contract reactive scheduling coordination |
| Language | English |
| License | This is an open access article under the CC BY-NC-ND license. |
| LinkModel | OpenURL |
| MergedId | FETCHMERGED-LOGICAL-c405t-d5052dd2f2a46e75ff92e05dbf35d5b8d412f275a2a16b355a38016a0a7077643 |
| OpenAccessLink | https://dx.doi.org/10.1016/j.procir.2019.03.010 |
| PageCount | 6 |
| ParticipantIDs | crossref_citationtrail_10_1016_j_procir_2019_03_010 crossref_primary_10_1016_j_procir_2019_03_010 elsevier_sciencedirect_doi_10_1016_j_procir_2019_03_010 |
| PublicationCentury | 2000 |
| PublicationDate | 2019 2019-00-00 |
| PublicationDateYYYYMMDD | 2019-01-01 |
| PublicationDate_xml | – year: 2019 text: 2019 |
| PublicationDecade | 2010 |
| PublicationTitle | Procedia CIRP |
| PublicationYear | 2019 |
| Publisher | Elsevier B.V |
| Publisher_xml | – name: Elsevier B.V |
| References | Building and Construction Authority. Annual Report 2017/18. Pheng, Chuan (bib0004) 2001; 127 Said, El-Rayes (bib0008) 2013; 31 Aktas, Ulengin (bib0005) 2016; 9 Building and Construction Authority. Construction Industry Transformation Map, 2017 Joo BJ, Chua PC. Multimode resource-constrained multi-project scheduling with ad hoc activity splitting, Proceedings of the 2017 IEEE International Conference on Industrial Engineering and Engineering Management 2017;2261-2265. Yahia, Ayadi, Masmoudi (bib0006) 2017; 28 Hsu, Kao, Ho, Li, Lai (bib0007) 2016; 48 Said, El-Rayes (bib0009) 2014; 43 Liu, Shih (bib00010) 2009; 18 Szczesny, König (bib00011) 2015; 3 Li, Shen, Xue (bib0001) 2014; 43 Pheng (10.1016/j.procir.2019.03.010_bib0004) 2001; 127 Hsu (10.1016/j.procir.2019.03.010_bib0007) 2016; 48 Said (10.1016/j.procir.2019.03.010_bib0008) 2013; 31 Said (10.1016/j.procir.2019.03.010_bib0009) 2014; 43 Li (10.1016/j.procir.2019.03.010_bib0001) 2014; 43 10.1016/j.procir.2019.03.010_bib0002 Szczesny (10.1016/j.procir.2019.03.010_bib00011) 2015; 3 Liu (10.1016/j.procir.2019.03.010_bib00010) 2009; 18 Aktas (10.1016/j.procir.2019.03.010_bib0005) 2016; 9 Yahia (10.1016/j.procir.2019.03.010_bib0006) 2017; 28 10.1016/j.procir.2019.03.010_bib00012 10.1016/j.procir.2019.03.010_bib0003 |
| References_xml | – volume: 28 start-page: 1987 year: 2017 end-page: 2006 ident: bib0006 article-title: A fuzzy-based negotiation approach for collaborative planning in manufacturing supply chains publication-title: J Intell Manuf – volume: 31 start-page: 292 year: 2013 end-page: 306 ident: bib0008 article-title: Optimal utilization of interior building spaces for material procurement and storage in congested construction sites publication-title: Automat Constr – reference: Building and Construction Authority. Annual Report 2017/18. – reference: Joo BJ, Chua PC. Multimode resource-constrained multi-project scheduling with ad hoc activity splitting, Proceedings of the 2017 IEEE International Conference on Industrial Engineering and Engineering Management 2017;2261-2265. – volume: 43 start-page: 240 year: 2014 end-page: 249 ident: bib0001 article-title: Critical review of the research on the management of prefabricated consturction publication-title: Habitat Int – reference: Building and Construction Authority. Construction Industry Transformation Map, 2017; – volume: 3 start-page: 10 year: 2015 ident: bib00011 article-title: Reactive scheduling based on actual logistics data by applying simulation-based optimization publication-title: Vis Eng – volume: 127 start-page: 494 year: 2001 end-page: 501 ident: bib0004 article-title: Just-in-time management of precast concrete components publication-title: J Contr Eng M ASCE – volume: 48 start-page: 703 year: 2016 end-page: 715 ident: bib0007 article-title: An agent-based fuzzy constraint-directed negotiation model for solving supply chain planning and scheduling problems publication-title: Appl Soft Comput – volume: 43 start-page: 110 year: 2014 end-page: 122 ident: bib0009 article-title: Automated multi-objective construction logistics optimization system publication-title: Automat Constr – volume: 9 start-page: 8 year: 2016 ident: bib0005 article-title: Penalty and reward contracts between a manufacturer and its logistics service provider publication-title: Logist Res – volume: 18 start-page: 715 year: 2009 end-page: 723 ident: bib00010 article-title: Construction rescheduling based on a manufacturing rescheduling framework publication-title: Automat Constr – volume: 9 start-page: 8 issue: 1 year: 2016 ident: 10.1016/j.procir.2019.03.010_bib0005 article-title: Penalty and reward contracts between a manufacturer and its logistics service provider publication-title: Logist Res doi: 10.1007/s12159-016-0136-9 – volume: 43 start-page: 240 year: 2014 ident: 10.1016/j.procir.2019.03.010_bib0001 article-title: Critical review of the research on the management of prefabricated consturction publication-title: Habitat Int doi: 10.1016/j.habitatint.2014.04.001 – volume: 28 start-page: 1987 issue: 8 year: 2017 ident: 10.1016/j.procir.2019.03.010_bib0006 article-title: A fuzzy-based negotiation approach for collaborative planning in manufacturing supply chains publication-title: J Intell Manuf doi: 10.1007/s10845-015-1085-x – volume: 3 start-page: 10 year: 2015 ident: 10.1016/j.procir.2019.03.010_bib00011 article-title: Reactive scheduling based on actual logistics data by applying simulation-based optimization publication-title: Vis Eng doi: 10.1186/s40327-015-0020-8 – ident: 10.1016/j.procir.2019.03.010_bib0002 – ident: 10.1016/j.procir.2019.03.010_bib0003 – volume: 48 start-page: 703 year: 2016 ident: 10.1016/j.procir.2019.03.010_bib0007 article-title: An agent-based fuzzy constraint-directed negotiation model for solving supply chain planning and scheduling problems publication-title: Appl Soft Comput doi: 10.1016/j.asoc.2016.07.030 – volume: 127 start-page: 494 issue: 6 year: 2001 ident: 10.1016/j.procir.2019.03.010_bib0004 article-title: Just-in-time management of precast concrete components publication-title: J Contr Eng M ASCE doi: 10.1061/(ASCE)0733-9364(2001)127:6(494) – ident: 10.1016/j.procir.2019.03.010_bib00012 doi: 10.1109/IEEM.2017.8290294 – volume: 31 start-page: 292 year: 2013 ident: 10.1016/j.procir.2019.03.010_bib0008 article-title: Optimal utilization of interior building spaces for material procurement and storage in congested construction sites publication-title: Automat Constr doi: 10.1016/j.autcon.2012.12.010 – volume: 18 start-page: 715 issue: 6 year: 2009 ident: 10.1016/j.procir.2019.03.010_bib00010 article-title: Construction rescheduling based on a manufacturing rescheduling framework publication-title: Automat Constr doi: 10.1016/j.autcon.2009.02.002 – volume: 43 start-page: 110 year: 2014 ident: 10.1016/j.procir.2019.03.010_bib0009 article-title: Automated multi-objective construction logistics optimization system publication-title: Automat Constr doi: 10.1016/j.autcon.2014.03.017 |
| SSID | ssj0000740312 |
| Score | 2.081632 |
| Snippet | Due to the increasing use of prefabricated building blocks in construction projects, on-site storages with limited space need to be utilized more efficiently... |
| SourceID | crossref elsevier |
| SourceType | Enrichment Source Index Database Publisher |
| StartPage | 51 |
| SubjectTerms | coordination negotiation penalty prefabrication Project scheduling reactive scheduling reward contract |
| Title | Coordination-based reactive resource-constrained project scheduling |
| URI | https://dx.doi.org/10.1016/j.procir.2019.03.010 |
| Volume | 81 |
| WOSCitedRecordID | wos000566264700010&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| hasFullText | 1 |
| inHoldings | 1 |
| isFullTextHit | |
| isPrint | |
| journalDatabaseRights | – providerCode: PRVHPJ databaseName: ROAD: Directory of Open Access Scholarly Resources customDbUrl: eissn: 2212-8271 dateEnd: 99991231 omitProxy: false ssIdentifier: ssj0000740312 issn: 2212-8271 databaseCode: M~E dateStart: 20120101 isFulltext: true titleUrlDefault: https://road.issn.org providerName: ISSN International Centre |
| link | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1LT-MwELagcGAPK54CFlAO3CqjxM6rx91oEVQCIShSb5ETO9AKpQjaFb3w23fGdtJCK14SFyu14zjyTGe-mXhmCDlUmFSMcwFmSayoLxWnwgslFa7khe8JUFJCF5uIzs_jbrd1YV3Zj7qcQFSW8dNT6_5bSQ19QGwMnf0EueuHQgdcA9GhBbJD-yHCJwOwJ3vGyUdRSWF8itBiDS6Ms57mCAuxOoTCNAHaGdMEOxf0zl2lyyxi1ZEEwETN5PSyjgVrD7SH9c8YREWzPaoZLLkdaTDaEeNmuzfpNjWvOyhMutDcvL7_Qp8-uB3YEeuFmJJys4ExKLsYaEQaM1Nd5UjN6bPC19RrsdLTpp41etjkG5-R8MbZ0Ef9kvcwoatnstTaw7Evc2df4Zq4JMBULGfhL5IlFgUtrPFx9jxxxgGOgmH84lS_ZBVmqc8Czi42H8ZMQZPOKvlpbQrnt-GFNbKgynXyYyrT5AZJZrnCqbjCmccVjuUKZ8IVm-T6-G8nOaG2fgbNAYYPqcQihVKyggk_VFFQFC2m3EBmBQ9kkMXS92AsCgSDv2cGwFNwwCuhcEWESZ58vkUa5aBU28SRseQxVwwNUB-eK3gYsryQblxkQnjZDuHVdqS5TS6P73uXVqcI-6nZxBQ3MXV5Cpu4Q2g9694kV3nn_qja6dQCRAP8UuCON2fufnnmL7KCv4zXbY80hg8jtU-W83_D3uPDgWaj_4ZXjC8 |
| linkProvider | ISSN International Centre |
| openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Coordination-based+reactive+resource-constrained+project+scheduling&rft.jtitle=Procedia+CIRP&rft.au=Joo%2C+Byung+Jun&rft.au=Chua%2C+Tay+Jin&rft.au=Cai%2C+Tian+Xiang&rft.au=Chua%2C+Ping+Chong&rft.date=2019&rft.pub=Elsevier+B.V&rft.issn=2212-8271&rft.eissn=2212-8271&rft.volume=81&rft.spage=51&rft.epage=56&rft_id=info:doi/10.1016%2Fj.procir.2019.03.010&rft.externalDocID=S2212827119303154 |
| thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=2212-8271&client=summon |
| thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=2212-8271&client=summon |
| thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=2212-8271&client=summon |