Computation of a multi-objective production planning model with probabilistic constraints
In this paper, a multi-objective production planning model has been presented for a captive plant. The model includes multi-products, multi-plants, and multi-objective with some probabilistic constraints. The probabilistic constraints have been transformed into deterministic constraints assuming the...
Uloženo v:
| Vydáno v: | International journal of computer mathematics Ročník 86; číslo 1; s. 185 - 198 |
|---|---|
| Hlavní autoři: | , |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
Abingdon
Taylor & Francis
01.01.2009
Taylor & Francis Ltd |
| Témata: | |
| ISSN: | 0020-7160, 1029-0265 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | In this paper, a multi-objective production planning model has been presented for a captive plant. The model includes multi-products, multi-plants, and multi-objective with some probabilistic constraints. The probabilistic constraints have been transformed into deterministic constraints assuming the parameters as independent normal random variables. The deterministic problem has been computed with two different methods, namely weighting method and fuzzy programming method. Finally, the integral solution obtained by these two methods have been compared. |
|---|---|
| Bibliografie: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 ObjectType-Article-2 ObjectType-Feature-1 content type line 23 |
| ISSN: | 0020-7160 1029-0265 |
| DOI: | 10.1080/00207160701734207 |