Computation of a multi-objective production planning model with probabilistic constraints

In this paper, a multi-objective production planning model has been presented for a captive plant. The model includes multi-products, multi-plants, and multi-objective with some probabilistic constraints. The probabilistic constraints have been transformed into deterministic constraints assuming the...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:International journal of computer mathematics Ročník 86; číslo 1; s. 185 - 198
Hlavní autoři: Sahoo, N. P., Biswal, M. P.
Médium: Journal Article
Jazyk:angličtina
Vydáno: Abingdon Taylor & Francis 01.01.2009
Taylor & Francis Ltd
Témata:
ISSN:0020-7160, 1029-0265
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Popis
Shrnutí:In this paper, a multi-objective production planning model has been presented for a captive plant. The model includes multi-products, multi-plants, and multi-objective with some probabilistic constraints. The probabilistic constraints have been transformed into deterministic constraints assuming the parameters as independent normal random variables. The deterministic problem has been computed with two different methods, namely weighting method and fuzzy programming method. Finally, the integral solution obtained by these two methods have been compared.
Bibliografie:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ObjectType-Article-2
ObjectType-Feature-1
content type line 23
ISSN:0020-7160
1029-0265
DOI:10.1080/00207160701734207