Hwang, F. J., & Lin, B. M. T. (2016). Two-stage flexible flow shop scheduling subject to fixed job sequences. The Journal of the Operational Research Society, 67(3), 506-515. https://doi.org/10.1057/jors.2015.61
Citace podle Chicago (17th ed.)Hwang, F J., a Bertrand M T. Lin. "Two-stage Flexible Flow Shop Scheduling Subject to Fixed Job Sequences." The Journal of the Operational Research Society 67, no. 3 (2016): 506-515. https://doi.org/10.1057/jors.2015.61.
Citace podle MLA (9th ed.)Hwang, F J., a Bertrand M T. Lin. "Two-stage Flexible Flow Shop Scheduling Subject to Fixed Job Sequences." The Journal of the Operational Research Society, vol. 67, no. 3, 2016, pp. 506-515, https://doi.org/10.1057/jors.2015.61.
Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..