Hydro-electric unit commitment subject to uncertain demand
We consider the problem of scheduling daily hydro-electricity generation in a river valley. Each generating station in this river valley has a number of turbines which incur fixed charges on startup and have a generation efficiency which varies nonlinearly with flow. With appropriate approximations...
Gespeichert in:
| Veröffentlicht in: | European journal of operational research Jg. 125; H. 2; S. 410 - 424 |
|---|---|
| Hauptverfasser: | , , |
| Format: | Journal Article |
| Sprache: | Englisch |
| Veröffentlicht: |
Amsterdam
Elsevier B.V
01.09.2000
Elsevier Elsevier Sequoia S.A |
| Schriftenreihe: | European Journal of Operational Research |
| Schlagworte: | |
| ISSN: | 0377-2217, 1872-6860 |
| Online-Zugang: | Volltext |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
| Zusammenfassung: | We consider the problem of scheduling daily hydro-electricity generation in a river valley. Each generating station in this river valley has a number of turbines which incur fixed charges on startup and have a generation efficiency which varies nonlinearly with flow. With appropriate approximations the problem of determining what turbine units to commit in each half hour of the day can be formulated as a large mixed-integer linear programming problem. In practice the generation required from this group of stations in each half hour is often different from that forecast. We investigate the impact of this uncertainty on the unit commitment by using an optimization-based heuristic to give an approximate solution to the stochastic problem. |
|---|---|
| Bibliographie: | SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 |
| ISSN: | 0377-2217 1872-6860 |
| DOI: | 10.1016/S0377-2217(99)00172-1 |