Multi-mode resource availability cost problem with recruitment and release dates for resources
This paper investigates the multi-mode resource availability cost problem with recruitment and release dates for resources. This problem is a more realistic model and extended case of the resource availability cost problem. The project contains activities interrelated by finish–start precedence rela...
Uloženo v:
| Vydáno v: | Applied mathematical modelling Ročník 38; číslo 21-22; s. 5347 - 5355 |
|---|---|
| Hlavní autor: | |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
Elsevier Inc
01.11.2014
|
| Témata: | |
| ISSN: | 0307-904X |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | This paper investigates the multi-mode resource availability cost problem with recruitment and release dates for resources. This problem is a more realistic model and extended case of the resource availability cost problem. The project contains activities interrelated by finish–start precedence relations with zero time lags, which require a set of renewable resources. First, a mixed integer programming formulation is proposed for the problem. Then, simulated annealing (SA) algorithm is proposed to obtain a satisfying solution for this NP-hard problem. The effectiveness of the proposed algorithm is demonstrated through comprehensive experimentation based on 300 test problems. The results are analyzed and discussed. |
|---|---|
| Bibliografie: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 23 |
| ISSN: | 0307-904X |
| DOI: | 10.1016/j.apm.2014.04.009 |