APA (7th ed.) Citation

Jia, S., Yi, J., Yang, G., Du, B., & Zhu, J. (2013). A multi-objective optimisation algorithm for the hot rolling batch scheduling problem. International journal of production research, 51(3), 667-681. https://doi.org/10.1080/00207543.2011.654138

Chicago Style (17th ed.) Citation

Jia, S.J, J. Yi, G.K Yang, B. Du, and J. Zhu. "A Multi-objective Optimisation Algorithm for the Hot Rolling Batch Scheduling Problem." International Journal of Production Research 51, no. 3 (2013): 667-681. https://doi.org/10.1080/00207543.2011.654138.

MLA (9th ed.) Citation

Jia, S.J, et al. "A Multi-objective Optimisation Algorithm for the Hot Rolling Batch Scheduling Problem." International Journal of Production Research, vol. 51, no. 3, 2013, pp. 667-681, https://doi.org/10.1080/00207543.2011.654138.

Warning: These citations may not always be 100% accurate.