The Management of Railway Operations during the Planned Interruption of Railway Infrastructure

A planned interruption of railway infrastructure is a situation where the operation of the track line or the operation of railway transport is limited. If there is also a restriction on the railway infrastructure, it means there will be complications not only for passengers but, above all, for railw...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:Infrastructures (Basel) Ročník 9; číslo 7; s. 119
Hlavní autori: Bulková, Zdenka, Gašparík, Jozef, Zitrický, Vladislav
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: Basel MDPI AG 01.07.2024
Predmet:
ISSN:2412-3811, 2412-3811
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Abstract A planned interruption of railway infrastructure is a situation where the operation of the track line or the operation of railway transport is limited. If there is also a restriction on the railway infrastructure, it means there will be complications not only for passengers but, above all, for railway undertakings operating freight transport. However, because of the planned railway infrastructure interruption, the quality of services provided not only to passengers but also to freight transport is decreasing. The aim of this paper is to propose effective planned maintenance works based on the analysis and evaluation of the processes performed during the planned railway infrastructure interruption or restriction. The research describes the process of affected railway infrastructure from technical, cost, and safety points of view. A methodological procedure is proposed under the condition of the Czech infrastructure manager. The main method is the calculation of the costs for the railway infrastructure manager and railway operator during the infrastructure interruption. The application part is undertaken using two interrupted lines according to the established alternative timetable in the area of České Budějovice.
AbstractList A planned interruption of railway infrastructure is a situation where the operation of the track line or the operation of railway transport is limited. If there is also a restriction on the railway infrastructure, it means there will be complications not only for passengers but, above all, for railway undertakings operating freight transport. However, because of the planned railway infrastructure interruption, the quality of services provided not only to passengers but also to freight transport is decreasing. The aim of this paper is to propose effective planned maintenance works based on the analysis and evaluation of the processes performed during the planned railway infrastructure interruption or restriction. The research describes the process of affected railway infrastructure from technical, cost, and safety points of view. A methodological procedure is proposed under the condition of the Czech infrastructure manager. The main method is the calculation of the costs for the railway infrastructure manager and railway operator during the infrastructure interruption. The application part is undertaken using two interrupted lines according to the established alternative timetable in the area of České Budějovice.
Author Zitrický, Vladislav
Bulková, Zdenka
Gašparík, Jozef
Author_xml – sequence: 1
  givenname: Zdenka
  orcidid: 0000-0001-8860-0518
  surname: Bulková
  fullname: Bulková, Zdenka
– sequence: 2
  givenname: Jozef
  orcidid: 0000-0002-6565-0085
  surname: Gašparík
  fullname: Gašparík, Jozef
– sequence: 3
  givenname: Vladislav
  orcidid: 0000-0003-2430-2479
  surname: Zitrický
  fullname: Zitrický, Vladislav
BookMark eNqFkW9LHDEQxkNR6FX9CrLg69PJn90k4JtyaHugKKJvDdns5LrHXXJNspT79l09C6cIfTXDzPN7eJj5Rg5CDEjIKYVzzjVc9MEnm0saXBkSZg0SKNVfyIQJyqZcUXqw138lJzkvAYCBkkrRCXl-_IXVrQ12gWsMpYq-erD96o_dVncbTLb0MeSqG1IfFlUZtfcrGwJ21TwUTGnYvAj2qfm7QMfk0NtVxpO3ekSerq8eZz-nN3c_5rPvN1PHtSzTuq0bELqTnHWyc1S1yjctbT0XLQWroIO2YeNWAwfWeCaUbbl20HSN407wIzLf-XbRLs0m9Wubtiba3rwOYloYm0rvVmjqkZWNBGQcBNNeS4-AQvKa0RYljl5nO69Nir8HzMUs45DCGN9wUEJTUQs9qi53Kpdizgm9cX15PVdJ4ykMBfPyIPP5g0a8-YD_C_0f8C8xbp2w
CitedBy_id crossref_primary_10_3390_vehicles7020048
crossref_primary_10_3390_su17104476
Cites_doi 10.1016/j.ejor.2013.12.020
10.1007/978-3-030-96380-4_104
10.1016/j.trb.2016.12.019
10.4337/9781783473335.00006
10.1016/j.trpro.2021.02.021
10.2495/TDI-V1-N4-695-710
10.3390/su142114430
10.1016/j.commtr.2022.100064
10.3390/infrastructures9060090
10.1287/trsc.2015.0618
10.1016/j.sbspro.2012.09.759
10.1016/j.trpro.2019.07.153
10.1515/eng-2020-0026
10.5592/CO/CETRA.2022.1430
10.1109/TVT.2024.3404629
10.3390/infrastructures9040071
10.1016/j.trb.2021.02.006
10.3390/infrastructures7080106
10.1007/978-3-642-27963-8_6
10.1007/978-3-642-05465-5
10.1109/TTE.2023.3346379
10.1108/13552510710780276
10.1088/1757-899X/832/1/012038
10.7307/ptt.v31i6.3231
10.3390/infrastructures8120177
10.17818/NM/2018/4SI.9
10.1016/j.ejtl.2022.100081
10.1016/j.trb.2022.02.002
10.1016/j.ejor.2015.12.037
10.1109/TITS.2006.888605
10.1016/j.trpro.2015.09.011
10.3390/su13084443
10.1080/23248378.2017.1400156
10.3390/infrastructures9030053
10.1016/j.cor.2010.09.001
10.1007/978-3-319-00795-3_3
ContentType Journal Article
Copyright 2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.
Copyright_xml – notice: 2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.
DBID AAYXX
CITATION
8FE
8FG
ABUWG
AFKRA
ARAPS
AZQEC
BENPR
BGLVJ
CCPQU
DWQXO
HCIFZ
P5Z
P62
PHGZM
PHGZT
PIMPY
PKEHL
PQEST
PQGLB
PQQKQ
PQUKI
PRINS
DOA
DOI 10.3390/infrastructures9070119
DatabaseName CrossRef
ProQuest SciTech Collection
ProQuest Technology Collection
ProQuest Central (Alumni Edition)
ProQuest Central UK/Ireland
Advanced Technologies & Computer Science Collection
ProQuest Central Essentials
ProQuest Central
ProQuest Technology Collection (LUT)
ProQuest One Community College
ProQuest Central Korea
SciTech Premium Collection
Advanced Technologies & Aerospace Database
ProQuest Advanced Technologies & Aerospace Collection
ProQuest Central Premium
ProQuest One Academic (New)
Publicly Available Content Database
ProQuest One Academic Middle East (New)
ProQuest One Academic Eastern Edition (DO NOT USE)
ProQuest One Applied & Life Sciences
ProQuest One Academic (retired)
ProQuest One Academic UKI Edition
ProQuest Central China
DOAJ Directory of Open Access Journals
DatabaseTitle CrossRef
Publicly Available Content Database
Advanced Technologies & Aerospace Collection
Technology Collection
ProQuest One Academic Middle East (New)
ProQuest Advanced Technologies & Aerospace Collection
ProQuest Central Essentials
ProQuest One Academic Eastern Edition
ProQuest Central (Alumni Edition)
SciTech Premium Collection
ProQuest One Community College
ProQuest Technology Collection
ProQuest SciTech Collection
ProQuest Central China
ProQuest Central
Advanced Technologies & Aerospace Database
ProQuest One Applied & Life Sciences
ProQuest One Academic UKI Edition
ProQuest Central Korea
ProQuest Central (New)
ProQuest One Academic
ProQuest One Academic (New)
DatabaseTitleList CrossRef

Publicly Available Content Database
Database_xml – sequence: 1
  dbid: DOA
  name: DOAJ Directory of Open Access Journals
  url: https://www.doaj.org/
  sourceTypes: Open Website
– sequence: 2
  dbid: PIMPY
  name: Publicly Available Content Database
  url: http://search.proquest.com/publiccontent
  sourceTypes: Aggregation Database
DeliveryMethod fulltext_linktorsrc
Discipline Engineering
EISSN 2412-3811
ExternalDocumentID oai_doaj_org_article_548a7670e230429f97fe0e473521be7e
10_3390_infrastructures9070119
GeographicLocations Czech Republic
GeographicLocations_xml – name: Czech Republic
GroupedDBID 8FE
8FG
AADQD
AAFWJ
AAYXX
ADBBV
ADMLS
AFFHD
AFKRA
AFPKN
AFZYC
ALMA_UNASSIGNED_HOLDINGS
ARAPS
ARCSS
BCNDV
BENPR
BGLVJ
CCPQU
CITATION
GROUPED_DOAJ
HCIFZ
IAO
IGS
ITC
MODMG
M~E
OK1
P62
PHGZM
PHGZT
PIMPY
PQGLB
PROAC
ABUWG
AZQEC
DWQXO
PKEHL
PQEST
PQQKQ
PQUKI
PRINS
ID FETCH-LOGICAL-c397t-5b56049d732d7dc18b8f6b1bf34b10a80d0b62732903026f248ab39c06d6c3c43
IEDL.DBID P5Z
ISICitedReferencesCount 3
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=001277001400001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 2412-3811
IngestDate Fri Oct 03 12:43:39 EDT 2025
Sat Jul 26 03:00:50 EDT 2025
Sat Nov 29 07:10:49 EST 2025
Tue Nov 18 22:26:28 EST 2025
IsDoiOpenAccess true
IsOpenAccess true
IsPeerReviewed true
IsScholarly true
Issue 7
Language English
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c397t-5b56049d732d7dc18b8f6b1bf34b10a80d0b62732903026f248ab39c06d6c3c43
Notes ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ORCID 0000-0001-8860-0518
0000-0002-6565-0085
0000-0003-2430-2479
OpenAccessLink https://www.proquest.com/docview/3084914549?pq-origsite=%requestingapplication%
PQID 3084914549
PQPubID 2055405
ParticipantIDs doaj_primary_oai_doaj_org_article_548a7670e230429f97fe0e473521be7e
proquest_journals_3084914549
crossref_citationtrail_10_3390_infrastructures9070119
crossref_primary_10_3390_infrastructures9070119
PublicationCentury 2000
PublicationDate 2024-07-01
PublicationDateYYYYMMDD 2024-07-01
PublicationDate_xml – month: 07
  year: 2024
  text: 2024-07-01
  day: 01
PublicationDecade 2020
PublicationPlace Basel
PublicationPlace_xml – name: Basel
PublicationTitle Infrastructures (Basel)
PublicationYear 2024
Publisher MDPI AG
Publisher_xml – name: MDPI AG
References ref_50
(ref_51) 2019; 40
Louwerse (ref_28) 2014; 235
Zhang (ref_55) 2022; 158
ref_14
ref_12
ref_11
ref_10
(ref_19) 2015; 10
ref_53
ref_52
Pranzo (ref_31) 2007; 8
Schlechte (ref_58) 2012; 148
ref_17
ref_16
Forsgren (ref_26) 2013; 3
Veelenturf (ref_29) 2015; 50
ref_61
ref_60
Caimi (ref_54) 2016; 6
Lindner (ref_59) 2022; 11
ref_24
ref_68
ref_67
ref_22
ref_21
ref_65
ref_20
ref_64
Parida (ref_3) 2007; 13
Canca (ref_32) 2012; 54
Blaho (ref_66) 2018; 65
Gallo (ref_33) 2012; 128
ref_36
ref_35
ref_34
Placido (ref_25) 2017; 1
ref_39
ref_38
Albrecht (ref_23) 2013; 40
ref_37
Bruni (ref_13) 2018; 6
Tischer (ref_15) 2020; 10
Goverde (ref_18) 2017; 98
Ezaki (ref_63) 2022; 2
Vansteenwegen (ref_27) 2016; 252
(ref_8) 2005; 19
Polinder (ref_57) 2021; 146
Albrecht (ref_30) 2006; 88
ref_47
Blaho (ref_62) 2021; 53
ref_46
ref_45
ref_44
Weiland (ref_7) 2019; 31
ref_43
ref_42
ref_41
ref_40
ref_1
ref_2
ref_49
ref_48
ref_9
Nachtigall (ref_56) 2021; 33
ref_5
ref_4
ref_6
References_xml – ident: ref_9
– volume: 235
  start-page: 583
  year: 2014
  ident: ref_28
  article-title: Adjusting a railway timetable in case of partial or complete blockades
  publication-title: Eur. J. Oper. Res.
  doi: 10.1016/j.ejor.2013.12.020
– ident: ref_49
– ident: ref_43
  doi: 10.1007/978-3-030-96380-4_104
– volume: 98
  start-page: 224
  year: 2017
  ident: ref_18
  article-title: Designing alternative railway timetables under infrastructure maintenance possessions
  publication-title: Transp. Res. Part B
  doi: 10.1016/j.trb.2016.12.019
– ident: ref_68
– ident: ref_5
  doi: 10.4337/9781783473335.00006
– volume: 53
  start-page: 159
  year: 2021
  ident: ref_62
  article-title: Capacity of corridor lines after modernization
  publication-title: Transp. Res. Procedia
  doi: 10.1016/j.trpro.2021.02.021
– ident: ref_65
– volume: 19
  start-page: 1
  year: 2005
  ident: ref_8
  article-title: Support of railway operation interruption
  publication-title: Sci. Tech. Proc. České Dráhy
– ident: ref_39
– volume: 1
  start-page: 695
  year: 2017
  ident: ref_25
  article-title: Managing disruptions and disturbances on railway services: A real-scale case study
  publication-title: Int. J. Transp. Dev. Integr.
  doi: 10.2495/TDI-V1-N4-695-710
– ident: ref_61
  doi: 10.3390/su142114430
– volume: 2
  start-page: 100064
  year: 2022
  ident: ref_63
  article-title: Towards understanding network topology and robustness of logistics systems
  publication-title: Commun. Transp. Res.
  doi: 10.1016/j.commtr.2022.100064
– ident: ref_11
  doi: 10.3390/infrastructures9060090
– ident: ref_35
– volume: 50
  start-page: 841
  year: 2015
  ident: ref_29
  article-title: A Railway Timetable Rescheduling Approach for Handling Large-Scale Disruptions
  publication-title: Transp. Sci.
  doi: 10.1287/trsc.2015.0618
– volume: 54
  start-page: 402
  year: 2012
  ident: ref_32
  article-title: Optimal train reallocation strategies under service disruptions
  publication-title: Procedia Soc. Behav. Sci.
  doi: 10.1016/j.sbspro.2012.09.759
– volume: 40
  start-page: 1096
  year: 2019
  ident: ref_51
  article-title: Identifying the derived utility function of transport services: Case study of rail and sea container transport
  publication-title: Transp. Res. Procedia
  doi: 10.1016/j.trpro.2019.07.153
– volume: 10
  start-page: 224
  year: 2020
  ident: ref_15
  article-title: The use of simulation modelling for determining the capacity of railway lines in the Czech conditions
  publication-title: Open Eng.
  doi: 10.1515/eng-2020-0026
– volume: 6
  start-page: 285
  year: 2016
  ident: ref_54
  article-title: Models for railway timetable optimization: Applicability and applications in practice
  publication-title: J. Rail Transp. Plan. Manag.
– ident: ref_2
  doi: 10.5592/CO/CETRA.2022.1430
– ident: ref_52
– ident: ref_12
  doi: 10.1109/TVT.2024.3404629
– ident: ref_48
– ident: ref_10
– ident: ref_1
  doi: 10.3390/infrastructures9040071
– volume: 146
  start-page: 111
  year: 2021
  ident: ref_57
  article-title: Timetabling for strategic passenger railway planning
  publication-title: Transp. Res. Part B Methodol.
  doi: 10.1016/j.trb.2021.02.006
– ident: ref_34
  doi: 10.3390/infrastructures7080106
– volume: 148
  start-page: 53
  year: 2012
  ident: ref_58
  article-title: Railway Track Allocation—Simulation, Aggregation, and Optimization
  publication-title: Lect. Notes Electr. Eng.
  doi: 10.1007/978-3-642-27963-8_6
– ident: ref_24
  doi: 10.1007/978-3-642-05465-5
– ident: ref_41
– ident: ref_38
– ident: ref_17
– ident: ref_45
– ident: ref_20
– ident: ref_14
  doi: 10.1109/TTE.2023.3346379
– volume: 13
  start-page: 241
  year: 2007
  ident: ref_3
  article-title: Development of a multi-criteria hierarchical framework for maintenance performance measurement (MPM)
  publication-title: J. Qual. Maint. Eng.
  doi: 10.1108/13552510710780276
– ident: ref_53
– ident: ref_42
  doi: 10.1088/1757-899X/832/1/012038
– volume: 31
  start-page: 669
  year: 2019
  ident: ref_7
  article-title: Impact of railway investment on regional development—Case study of Pomeranian metropolitan railway
  publication-title: Promet-Traffic Transp.
  doi: 10.7307/ptt.v31i6.3231
– ident: ref_44
  doi: 10.3390/infrastructures8120177
– ident: ref_47
– volume: 65
  start-page: 213
  year: 2018
  ident: ref_66
  article-title: Capacity of main railway lines—Analysis of methodologies for its calculation
  publication-title: Naše More
  doi: 10.17818/NM/2018/4SI.9
– volume: 11
  start-page: 100081
  year: 2022
  ident: ref_59
  article-title: Timetable merging for the Periodic Event Scheduling Problem
  publication-title: EURO J. Transp. Logist.
  doi: 10.1016/j.ejtl.2022.100081
– volume: 158
  start-page: 210
  year: 2022
  ident: ref_55
  article-title: A heuristic approach to integrate train timetabling, platforming, and railway network maintenance scheduling decisions
  publication-title: Transp. Res. Part B Methodol.
  doi: 10.1016/j.trb.2022.02.002
– ident: ref_40
– ident: ref_67
– ident: ref_37
– volume: 128
  start-page: 197
  year: 2012
  ident: ref_33
  article-title: Analysis of the interaction between travel demand and rail capacity constraints
  publication-title: WIT Trans. Built Environ.
– volume: 252
  start-page: 39
  year: 2016
  ident: ref_27
  article-title: An iterative approach for reducing the impact of infrastructure maintenance on the performance of railway systems
  publication-title: Eur. J. Oper. Res.
  doi: 10.1016/j.ejor.2015.12.037
– ident: ref_21
– volume: 8
  start-page: 208
  year: 2007
  ident: ref_31
  article-title: Conflict resolution and train speed coordination for solving real-time timetable perturbations
  publication-title: IEEE Trans. Intell. Transp. Syst.
  doi: 10.1109/TITS.2006.888605
– volume: 88
  start-page: 531
  year: 2006
  ident: ref_30
  article-title: Running time re-optimization during real-time timetable perturbations
  publication-title: WIT Trans. Built Environ.
– ident: ref_6
– volume: 10
  start-page: 574
  year: 2015
  ident: ref_19
  article-title: Railway Infrastructure Maintenance—A Survey of Planning Problems and Conducted Research
  publication-title: Transp. Res. Procedia
  doi: 10.1016/j.trpro.2015.09.011
– ident: ref_50
– ident: ref_4
  doi: 10.3390/su13084443
– ident: ref_46
– volume: 6
  start-page: 57
  year: 2018
  ident: ref_13
  article-title: Pantograph–catenary interaction: Recent achievements and future research challenges
  publication-title: Int. J. Rail Transp.
  doi: 10.1080/23248378.2017.1400156
– ident: ref_16
  doi: 10.3390/infrastructures9030053
– volume: 40
  start-page: 703
  year: 2013
  ident: ref_23
  article-title: Rescheduling rail networks with maintenance disruptions using Problem Space Search
  publication-title: Comput. Oper. Res.
  doi: 10.1016/j.cor.2010.09.001
– ident: ref_64
– ident: ref_60
  doi: 10.1007/978-3-319-00795-3_3
– ident: ref_36
– ident: ref_22
– volume: 3
  start-page: 111
  year: 2013
  ident: ref_26
  article-title: Maintaining tracks and traffic flow at the same time
  publication-title: J. Rail Transp. Plan. Manag.
– volume: 33
  start-page: 91
  year: 2021
  ident: ref_56
  article-title: Calculation model of railway capacity price in the Czech Republic
  publication-title: Promet Traffic Transp.
SSID ssj0002087881
Score 2.2816963
Snippet A planned interruption of railway infrastructure is a situation where the operation of the track line or the operation of railway transport is limited. If...
SourceID doaj
proquest
crossref
SourceType Open Website
Aggregation Database
Enrichment Source
Index Database
StartPage 119
SubjectTerms Cost analysis
Freight transportation
Infrastructure
infrastructure manager costs
Linear programming
Modernization
operator costs
Passengers
planned railway interruption
Rail transportation
railway infrastructure
Railway networks
railway operation
railway transport
Safety management
Trains
SummonAdditionalLinks – databaseName: DOAJ Directory of Open Access Journals
  dbid: DOA
  link: http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV1LSwMxEA5SPOhBfGK1Sg5el2Y3u3kcVSwKUkUUenLJa6FS2tKH4r93kmxrRaEXb8uyYbMzk8n3ZZNvELpIuZKVVSrRmS4SGIk0gWmYJ8ZzDavhWoWDwve82xW9nnxcKfXl94RFeeBouDYgasUZJ86vXmaykrxyxPmCuVmqHXc--wLqWSFTb-H3mvA66fFIMAVe3wZ_TVTUZJ0DkQVO6NXOfsxGQbT_V04OE01nF-3UCBFfxp7toQ033EfbK7qBB-gVnIu_N67gUYWfVH_woT7xw9hFn05xPIGIAeHhUJrIWRzW_ybzkCZWW9396PYheuncPF_fJnWhhMSAXWdJoQG35NJymlluTSq0qJhOdUVznRIliCWaAU7JJAzpjFUZ2FRTaQizzFCT0yPUGI6G7hhhqrmijBvlhMhVYTVhQuWFNFJQSIuqiYqFwUpTq4j7YhaDEtiEN3T5t6GbqL1sN446GmtbXHl_LJ_2OtjhBkRHWUdHuS46mqi18GZZD85pSYnIZZoDMz75j3ecoq0MkE7cw9tCDfgQd4Y2zfusP52ch7j8AhYp6oo
  priority: 102
  providerName: Directory of Open Access Journals
Title The Management of Railway Operations during the Planned Interruption of Railway Infrastructure
URI https://www.proquest.com/docview/3084914549
https://doaj.org/article/548a7670e230429f97fe0e473521be7e
Volume 9
WOSCitedRecordID wos001277001400001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVAON
  databaseName: DOAJ Directory of Open Access Journals
  customDbUrl:
  eissn: 2412-3811
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0002087881
  issn: 2412-3811
  databaseCode: DOA
  dateStart: 20160101
  isFulltext: true
  titleUrlDefault: https://www.doaj.org/
  providerName: Directory of Open Access Journals
– providerCode: PRVHPJ
  databaseName: ROAD: Directory of Open Access Scholarly Resources
  customDbUrl:
  eissn: 2412-3811
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0002087881
  issn: 2412-3811
  databaseCode: M~E
  dateStart: 20160101
  isFulltext: true
  titleUrlDefault: https://road.issn.org
  providerName: ISSN International Centre
– providerCode: PRVPQU
  databaseName: Advanced Technologies & Aerospace Database
  customDbUrl:
  eissn: 2412-3811
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0002087881
  issn: 2412-3811
  databaseCode: P5Z
  dateStart: 20161201
  isFulltext: true
  titleUrlDefault: https://search.proquest.com/hightechjournals
  providerName: ProQuest
– providerCode: PRVPQU
  databaseName: ProQuest Central
  customDbUrl:
  eissn: 2412-3811
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0002087881
  issn: 2412-3811
  databaseCode: BENPR
  dateStart: 20161201
  isFulltext: true
  titleUrlDefault: https://www.proquest.com/central
  providerName: ProQuest
– providerCode: PRVPQU
  databaseName: Publicly Available Content Database
  customDbUrl:
  eissn: 2412-3811
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0002087881
  issn: 2412-3811
  databaseCode: PIMPY
  dateStart: 20161201
  isFulltext: true
  titleUrlDefault: http://search.proquest.com/publiccontent
  providerName: ProQuest
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV1LT9wwEB6VxwEOUB4VS-nKB67ROnYS26eqVCCQ2m2EQAIORH4FrYR2t7s81H_fsZNdQFRw6C1yYsnJPDzfxPMNwH4qtKqd1olhJk_QEnmC27BIbMAazuC1joXCP0S_Ly8uVNkm3KbtscqZT4yO2o1syJH3OJWZSjOEM1_Hv5PQNSr8XW1baCzAUmBJCIZZ5lfzHAujMrClN4XBHNF9D6U20Q0z6z3CWUSGgfPsxZ4Uqftfeea43Ryt_-9CP8JaG2iSb41mbMAHP9yE1Wf0g1twjTpCns6_kFFNTvXg9lH_Ib_GvlGNKWkKGQkGiiR2OPKOxDTi5D56m-ezTl689zacHx2efT9O2n4LiUXx3CW5wfAnU05w5oSzqTSyLkxqap6ZlGpJHTUFhjtMoWdgRc0yqQ1XlhausNxm_BMsDkdDvwOEG6F5Iaz2UmY6d4YWUme5skpy9K66A_nsi1e2JSMPPTFuKwQlQVLVvyXVgd583rih43h3xkEQ6PzpQKcdB0aTm6q1zgphmxaFoD6kyJmqlag99aErM0uNF74DezNZV62NT6snQe--ffszrDAMhZpDvnuwiEv0X2DZPtwNppMuLB0c9svTbswGdKMC41h58rO8_Avxaf33
linkProvider ProQuest
linkToHtml http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMw1V1Lb9QwEB6VFgk4tDzFlgI-wDFax3Zi-4AQbam66rJUqEgVB4JfQZWq3WW3peqf6m9k7CTbViA49cAtSuLIsb-Z8Tf2zAC8yqXRtTcms8wWGUoiz9AMy8xFruEtXpsUKDyUo5E6PNT7S3DRxcLEY5WdTkyK2k9c9JH3OVVC5wLpzNvpjyxWjYq7q10JjQYWe-H8DCnb_M1gG-f3NWM77w-2drO2qkDmsBMnWWHRyAvtJWdeepcrq-rS5rbmwubUKOqpLdGoM434Z2XNhDKWa0dLXzruBMfv3oIVIZAsofzsF18WPh1GVczO3gQic65pH1EyM00m2FOkz8hEY461azYwlQr4zRIk87az9r8NzH1YbRfS5F2D_AewFMYP4d6V9IqP4CvKALk830MmNflkjo7PzDn5OA0N9OekCdQkuBAmqYJT8CS5SWenSZtebTW4Ns6P4fON_OATWB5PxuEpEG6l4aV0JiglTOEtLZURhXZacbQepgdFN8OVa5Otx5ofxxWSroiM6s_I6EF_0W7apBv5Z4vNCKDF2zFdeLoxmX2vWu1TIS01spQ0xC0Apmst60BDrDrNchtk6MFGh62q1WHz6hJY639__BLu7B58GFbDwWjvGdxluOxrDjRvwDJ2NzyH2-7nydF89iKJC4FvNw3DX6mpVII
linkToPdf http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMw1V1LT9wwEB4BrVB76JOq21LqQzlG69hJbB-qqi1ddQXarhCVEAdSv4JWQrvbXSjir_XXdewkC4gKThy4RUkcOfY3M_7seQB8SIVWldM6MczkCUoiT9AMi8QGruEMXusYKLwjBgO5v6-GS_C3jYUJbpWtToyK2k1s2CPvciozlWZIZ7pV4xYx3Op9mv5OQgWpcNLaltOoIbLtz8-Qvs0_9rdwrjcZ633b-_o9aSoMJBY7dJLkBg1-ppzgzAlnU2lkVZjUVDwzKdWSOmoKNPBMoSywomKZ1IYrSwtXWG4zjt9dhgcCOWYgfsP8YLG_w6gMmdrroGTOFe0iYma6zgp7ilQaWWnIt3bFHsayAdesQjR1vaf3eZCewZNmgU0-1xLxHJb8-AU8vpR28SUcomyQC78fMqnIrh4dn-lz8mPqa5GYkzqAk-ACmcTKTt6RuH06O41a9nKr_pUxX4Ofd_KDr2BlPBn710C4EZoXwmovZaZzZ2ghdZYrqyRHq6I7kLezXdomCXuoBXJcIhkLKCn_j5IOdBftpnUakltbfAlgWrwd0ojHG5PZUdlopRLpqhaFoD4cDTBVKVF56kM1apYaL3wH1luclY1um5cXIHtz8-P3sIroK3f6g-238IjharD2c16HFeytfwcP7Z-T0Xy2ESWHwK-7RuE_93ZdVg
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=The+Management+of+Railway+Operations+during+the+Planned+Interruption+of+Railway+Infrastructure&rft.jtitle=Infrastructures+%28Basel%29&rft.au=Bulkov%C3%A1%2C+Zdenka&rft.au=Ga%C5%A1par%C3%ADk%2C+Jozef&rft.au=Zitrick%C3%BD%2C+Vladislav&rft.date=2024-07-01&rft.pub=MDPI+AG&rft.eissn=2412-3811&rft.volume=9&rft.issue=7&rft.spage=119&rft_id=info:doi/10.3390%2Finfrastructures9070119&rft.externalDBID=HAS_PDF_LINK
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=2412-3811&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=2412-3811&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=2412-3811&client=summon