Box-Based Temporal Decomposition of Multi-Period Economic Dispatch for Two-Stage Robust Unit Commitment

To ensure the feasibility of a unit commitment (UC) schedule under uncertainty, most existing two-stage robust UC methods formulate their second-stage problems as a multi-period economic dispatch (ED) problem with dynamic constraints, which does not properly model real-time ED where dynamic constrai...

Full description

Saved in:
Bibliographic Details
Published in:IEEE transactions on power systems Vol. 34; no. 4; pp. 3109 - 3118
Main Authors: Cho, Youngchae, Ishizaki, Takayuki, Ramdani, Nacim, Imura, Jun-ichi
Format: Journal Article
Language:English
Published: New York IEEE 01.07.2019
The Institute of Electrical and Electronics Engineers, Inc. (IEEE)
Institute of Electrical and Electronics Engineers
Subjects:
ISSN:0885-8950, 1558-0679
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first