APA (7th ed.) Citation

Sadfi, C., Penz, B., Rapine, C., Błażewicz, J., & Formanowicz, P. (2005). An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints. European journal of operational research, 161(1), 3-10. https://doi.org/10.1016/j.ejor.2003.08.026

Chicago Style (17th ed.) Citation

Sadfi, Cherif, Bernard Penz, Christophe Rapine, Jacek Błażewicz, and Piotr Formanowicz. "An Improved Approximation Algorithm for the Single Machine Total Completion Time Scheduling Problem with Availability Constraints." European Journal of Operational Research 161, no. 1 (2005): 3-10. https://doi.org/10.1016/j.ejor.2003.08.026.

MLA (9th ed.) Citation

Sadfi, Cherif, et al. "An Improved Approximation Algorithm for the Single Machine Total Completion Time Scheduling Problem with Availability Constraints." European Journal of Operational Research, vol. 161, no. 1, 2005, pp. 3-10, https://doi.org/10.1016/j.ejor.2003.08.026.

Warning: These citations may not always be 100% accurate.