Li, Z., Kwong, C. K., & Wong, W. (2013). An Integrated Model of Material Supplier Selection and Order Allocation Using Fuzzy Extended AHP and Multiobjective Programming. Mathematical problems in engineering, 2013(2013), 1-14. https://doi.org/10.1155/2013/363718
Citace podle Chicago (17th ed.)Li, Zhi, C. K. Kwong, a WaiKeung Wong. "An Integrated Model of Material Supplier Selection and Order Allocation Using Fuzzy Extended AHP and Multiobjective Programming." Mathematical Problems in Engineering 2013, no. 2013 (2013): 1-14. https://doi.org/10.1155/2013/363718.
Citace podle MLA (9th ed.)Li, Zhi, et al. "An Integrated Model of Material Supplier Selection and Order Allocation Using Fuzzy Extended AHP and Multiobjective Programming." Mathematical Problems in Engineering, vol. 2013, no. 2013, 2013, pp. 1-14, https://doi.org/10.1155/2013/363718.