Scheduling algorithms for two-stage reentrant hybrid flow shops: minimizing makespan under the maximum allowable due dates
We consider the scheduling problem in hybrid flow shops that consist of two stages in series, each of which has multiple identical parallel machines. Each job has reentrant flow, i.e., the job visits each production stage several times. The problem is to determine the allocation of jobs to machines...
Saved in:
| Published in: | International journal of advanced manufacturing technology Vol. 42; no. 9-10; pp. 963 - 973 |
|---|---|
| Main Authors: | , , , , , |
| Format: | Journal Article |
| Language: | English |
| Published: |
London
Springer-Verlag
01.06.2009
Springer Nature B.V |
| Subjects: | |
| ISSN: | 0268-3768, 1433-3015 |
| Online Access: | Get full text |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!