Scheduling algorithms for two-stage reentrant hybrid flow shops: minimizing makespan under the maximum allowable due dates

We consider the scheduling problem in hybrid flow shops that consist of two stages in series, each of which has multiple identical parallel machines. Each job has reentrant flow, i.e., the job visits each production stage several times. The problem is to determine the allocation of jobs to machines...

Full description

Saved in:
Bibliographic Details
Published in:International journal of advanced manufacturing technology Vol. 42; no. 9-10; pp. 963 - 973
Main Authors: Choi, Hyun-Seon, Kim, Hyung-Won, Lee, Dong-Ho, Yoon, Junggee, Yun, Chang Yeon, Chae, Kevin B.
Format: Journal Article
Language:English
Published: London Springer-Verlag 01.06.2009
Springer Nature B.V
Subjects:
ISSN:0268-3768, 1433-3015
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first