Citace podle APA (7th ed.)

Choi, H., Kim, H., Lee, D., Yoon, J., Yun, C. Y., & Chae, K. B. (2009). Scheduling algorithms for two-stage reentrant hybrid flow shops: Minimizing makespan under the maximum allowable due dates. International journal of advanced manufacturing technology, 42(9-10), 963-973. https://doi.org/10.1007/s00170-008-1656-5

Citace podle Chicago (17th ed.)

Choi, Hyun-Seon, Hyung-Won Kim, Dong-Ho Lee, Junggee Yoon, Chang Yeon Yun, a Kevin B. Chae. "Scheduling Algorithms for Two-stage Reentrant Hybrid Flow Shops: Minimizing Makespan Under the Maximum Allowable Due Dates." International Journal of Advanced Manufacturing Technology 42, no. 9-10 (2009): 963-973. https://doi.org/10.1007/s00170-008-1656-5.

Citace podle MLA (9th ed.)

Choi, Hyun-Seon, et al. "Scheduling Algorithms for Two-stage Reentrant Hybrid Flow Shops: Minimizing Makespan Under the Maximum Allowable Due Dates." International Journal of Advanced Manufacturing Technology, vol. 42, no. 9-10, 2009, pp. 963-973, https://doi.org/10.1007/s00170-008-1656-5.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..