Optimal logistics planning for modular construction using two-stage stochastic programming
The construction sector is currently undergoing a shift from stick-built construction to modular building systems that take advantage of modern prefabrication techniques. Long established in-situ construction practices are thus being replaced by processes imported from the manufacturing sector, wher...
Uloženo v:
| Vydáno v: | Automation in construction Ročník 94; s. 47 - 61 |
|---|---|
| Hlavní autoři: | , , |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
Amsterdam
Elsevier B.V
01.10.2018
Elsevier BV |
| Témata: | |
| ISSN: | 0926-5805, 1872-7891 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Abstract | The construction sector is currently undergoing a shift from stick-built construction to modular building systems that take advantage of modern prefabrication techniques. Long established in-situ construction practices are thus being replaced by processes imported from the manufacturing sector, where component fabrication takes place within a factory environment. As a result of this transformation, current construction supply chains, which have focused on the delivery of raw materials to sites, are no longer apt and need to make way to new, strengthened, and time-critical logistics systems. The aim of this study is to establish a mathematical model for the optimisation of logistics processes in modular construction covering three tiers of operation: manufacturing, storage and assembly. Previous studies have indicated that construction site delays constitute the largest cause of schedule deviations. Using the model outlined in this paper we seek to determine how factory manufacturing and inventory management should react to variations in the demand on construction sites. A two-stage stochastic programming model is developed to capture all possible demand variations on site. The model is evaluated using a case study from the residential construction sector. The application shows that the model is effective and can serve as decision support to optimise modular construction logistics.
•A strengthened logistics system is needed for the newly introduced design for manufacturing and assembly construction method.•A tailored logistic model has been developed to embody the unique features in modular construction•A two-stage stochastic programming model is developed to capture all possible demand variations on site.•The model outputs the optimal manufacturing, transportation and inventory scheme by considering all demand scenarios on site.•The model is tested on a residential project and results could serve as decision supports in modular construction logistics. |
|---|---|
| AbstractList | The construction sector is currently undergoing a shift from stick-built construction to modular building systems that take advantage of modern prefabrication techniques. Long established in-situ construction practices are thus being replaced by processes imported from the manufacturing sector, where component fabrication takes place within a factory environment. As a result of this transformation, current construction supply chains, which have focused on the delivery of raw materials to sites, are no longer apt and need to make way to new, strengthened, and time-critical logistics systems. The aim of this study is to establish a mathematical model for the optimisation of logistics processes in modular construction covering three tiers of operation: manufacturing, storage and assembly. Previous studies have indicated that construction site delays constitute the largest cause of schedule deviations. Using the model outlined in this paper we seek to determine how factory manufacturing and inventory management should react to variations in the demand on construction sites. A two-stage stochastic programming model is developed to capture all possible demand variations on site. The model is evaluated using a case study from the residential construction sector. The application shows that the model is effective and can serve as decision support to optimise modular construction logistics.
•A strengthened logistics system is needed for the newly introduced design for manufacturing and assembly construction method.•A tailored logistic model has been developed to embody the unique features in modular construction•A two-stage stochastic programming model is developed to capture all possible demand variations on site.•The model outputs the optimal manufacturing, transportation and inventory scheme by considering all demand scenarios on site.•The model is tested on a residential project and results could serve as decision supports in modular construction logistics. The construction sector is currently undergoing a shift from stick-built construction to modular building systems that take advantage of modern prefabrication techniques. Long established in-situ construction practices are thus being replaced by processes imported from the manufacturing sector, where component fabrication takes place within a factory environment. As a result of this transformation, current construction supply chains, which have focused on the delivery of raw materials to sites, are no longer apt and need to make way to new, strengthened, and time-critical logistics systems. The aim of this study is to establish a mathematical model for the optimisation of logistics processes in modular construction covering three tiers of operation: manufacturing, storage and assembly. Previous studies have indicated that construction site delays constitute the largest cause of schedule deviations. Using the model outlined in this paper we seek to determine how factory manufacturing and inventory management should react to variations in the demand on construction sites. A two-stage stochastic programming model is developed to capture all possible demand variations on site. The model is evaluated using a case study from the residential construction sector. The application shows that the model is effective and can serve as decision support to optimise modular construction logistics. |
| Author | Aurisicchio, Marco Angeloudis, Panagiotis Hsu, Pei-Yuan |
| Author_xml | – sequence: 1 givenname: Pei-Yuan surname: Hsu fullname: Hsu, Pei-Yuan email: p.hsu15@imperial.ac.uk organization: Dyson School of Design Engineering, Imperial College London, London SW7 2AZ, UK – sequence: 2 givenname: Panagiotis surname: Angeloudis fullname: Angeloudis, Panagiotis organization: Department of Civil & Environmental Engineering, Imperial College London, London SW7 2AZ, UK – sequence: 3 givenname: Marco surname: Aurisicchio fullname: Aurisicchio, Marco organization: Dyson School of Design Engineering, Imperial College London, London SW7 2AZ, UK |
| BookMark | eNqFkD1PwzAQhi0EEm3hHzBEYk44O3XsMCChii-pUhdYWCzXdoqr1C62A-Lf46hMDDDdcO_znu6ZomPnnUHoAkOFATdX20oOSXlXEcC8AloBaY_QBHNGSsZbfIwm0JKmpBzoKZrGuAUABk07Qa-rfbI72Re939iYrIrFvpfOWbcpOh-KnddDL0OR22MKg0rWu2KI4zp9-jImuTFFTF69yZEu9sFvgtztcuAMnXSyj-b8Z87Qy_3d8-KxXK4enha3y1LVHFKp11RjIxlVWuGuxUxzvW5qwrAC3WoMXEuiOt5KLoHpdl5rVtekhoYwLmlXz9DloTfffh9MTGLrh-DySUEwxoyShtCcmh9SKvgYg-nEPuTHw5fAIEaLYisOFsVoUQAV2WLGrn9hyiY5WkhB2v4_-OYAm_z-hzVBRGWNU0bbYFQS2tu_C74B6e2UyQ |
| CitedBy_id | crossref_primary_10_1016_j_autcon_2022_104170 crossref_primary_10_1007_s10479_024_06442_2 crossref_primary_10_1108_ECAM_03_2023_0232 crossref_primary_10_3390_app12094308 crossref_primary_10_1108_ECAM_07_2021_0668 crossref_primary_10_1016_j_jobe_2024_110099 crossref_primary_10_1108_JEDT_03_2023_0099 crossref_primary_10_1016_j_autcon_2023_105028 crossref_primary_10_1016_j_autcon_2024_105945 crossref_primary_10_1108_CI_04_2023_0075 crossref_primary_10_1016_j_jclepro_2021_127503 crossref_primary_10_1016_j_autcon_2022_104612 crossref_primary_10_1016_j_dibe_2025_100744 crossref_primary_10_1016_j_autcon_2022_104336 crossref_primary_10_1016_j_autcon_2024_105388 crossref_primary_10_1016_j_autcon_2019_102898 crossref_primary_10_1016_j_autcon_2022_104455 crossref_primary_10_1016_j_autcon_2023_105147 crossref_primary_10_1016_j_autcon_2022_104726 crossref_primary_10_1016_j_sftr_2025_100805 crossref_primary_10_1080_17452007_2024_2381497 crossref_primary_10_1016_j_autcon_2024_105815 crossref_primary_10_3390_ijerph182111493 crossref_primary_10_1061__ASCE_AE_1943_5568_0000558 crossref_primary_10_3390_su151511730 crossref_primary_10_1108_JEDT_12_2020_0498 crossref_primary_10_3390_buildings12020119 crossref_primary_10_1108_JEDT_04_2018_0076 crossref_primary_10_1080_09613218_2019_1669009 crossref_primary_10_1061_JCEMD4_COENG_16158 crossref_primary_10_3846_jcem_2022_16234 crossref_primary_10_1111_mice_12518 crossref_primary_10_1061_JCEMD4_COENG_14939 crossref_primary_10_1051_e3sconf_202125302041 crossref_primary_10_1016_j_jobe_2024_108830 crossref_primary_10_3390_buildings15162889 crossref_primary_10_3390_su12218905 crossref_primary_10_1016_j_autcon_2022_104155 crossref_primary_10_1016_j_autcon_2022_104397 crossref_primary_10_1061_JCEMD4_COENG_14150 crossref_primary_10_1080_01446193_2020_1831037 crossref_primary_10_1016_j_autcon_2023_104906 crossref_primary_10_1038_s41598_024_82689_w crossref_primary_10_1016_j_jclepro_2023_138699 crossref_primary_10_1093_jcde_qwac055 crossref_primary_10_3390_app11125531 crossref_primary_10_3390_buildings10100170 crossref_primary_10_3390_infrastructures8090129 crossref_primary_10_1016_j_autcon_2020_103271 crossref_primary_10_1016_j_autcon_2022_104201 crossref_primary_10_1111_mice_12504 crossref_primary_10_1016_j_jclepro_2020_121595 crossref_primary_10_1016_j_jclepro_2020_125674 crossref_primary_10_3390_su13168800 crossref_primary_10_1016_j_enbuild_2025_115784 crossref_primary_10_1016_j_jobe_2021_103720 crossref_primary_10_1061__ASCE_CO_1943_7862_0002410 crossref_primary_10_1016_j_cie_2025_111219 crossref_primary_10_1108_JSTPM_03_2020_0034 crossref_primary_10_1016_j_jclepro_2020_124716 crossref_primary_10_1108_JM2_05_2024_0156 crossref_primary_10_1016_j_autcon_2022_104496 crossref_primary_10_12677_mse_2024_133065 crossref_primary_10_1016_j_jobe_2025_111940 crossref_primary_10_1111_mice_70039 crossref_primary_10_3390_su13168911 crossref_primary_10_1016_j_jclepro_2022_130950 crossref_primary_10_1016_j_jobe_2021_102265 crossref_primary_10_1061__ASCE_ME_1943_5479_0001086 crossref_primary_10_1061_JCEMD4_COENG_14444 crossref_primary_10_1016_j_ssci_2022_105817 crossref_primary_10_3390_s24154900 crossref_primary_10_1007_s42524_019_0059_7 crossref_primary_10_3846_jcem_2022_16681 crossref_primary_10_1080_15623599_2020_1763049 crossref_primary_10_1080_15623599_2019_1613212 crossref_primary_10_1016_j_jclepro_2020_124044 crossref_primary_10_1088_1757_899X_603_3_032046 crossref_primary_10_1088_1755_1315_1101_4_042014 crossref_primary_10_1007_s12351_024_00856_3 crossref_primary_10_3390_buildings15173017 crossref_primary_10_3390_buildings15101622 crossref_primary_10_1016_j_jclepro_2022_130963 crossref_primary_10_1111_mice_12835 crossref_primary_10_1155_2020_1596428 crossref_primary_10_1061__ASCE_CO_1943_7862_0002273 crossref_primary_10_1016_j_jclepro_2019_119347 crossref_primary_10_1061_JCEMD4_COENG_14738 crossref_primary_10_1080_15623599_2019_1668633 crossref_primary_10_1016_j_autcon_2023_104952 crossref_primary_10_1016_j_ssci_2025_106897 crossref_primary_10_3390_su12051878 crossref_primary_10_1016_j_autcon_2024_105802 crossref_primary_10_1016_j_aei_2024_102658 crossref_primary_10_1108_ECAM_09_2018_0386 crossref_primary_10_1016_j_autcon_2020_103466 crossref_primary_10_1061_JMENEA_MEENG_5455 crossref_primary_10_3390_logistics4030019 crossref_primary_10_1061__ASCE_CO_1943_7862_0002280 crossref_primary_10_1061_JCEMD4_COENG_16804 crossref_primary_10_1016_j_cie_2025_111027 crossref_primary_10_1080_00207543_2023_2251602 crossref_primary_10_1016_j_clscn_2021_100005 crossref_primary_10_1371_journal_pone_0272448 crossref_primary_10_3390_buildings14061667 crossref_primary_10_1016_j_trpro_2020_03_187 crossref_primary_10_1155_2021_9953732 crossref_primary_10_3390_buildings15071045 crossref_primary_10_1016_j_aei_2023_101951 crossref_primary_10_1080_15623599_2023_2299557 crossref_primary_10_3390_buildings13112711 crossref_primary_10_1139_cjce_2020_0346 crossref_primary_10_20525_ijrbs_v10i1_1028 crossref_primary_10_1080_15623599_2020_1728487 crossref_primary_10_1016_j_autcon_2020_103506 crossref_primary_10_1016_j_scs_2024_105356 crossref_primary_10_1016_j_autcon_2023_105190 crossref_primary_10_3390_buildings13010163 crossref_primary_10_1016_j_jobe_2021_102316 |
| Cites_doi | 10.1021/ie950263f 10.1016/j.trb.2016.12.018 10.1016/j.ijproman.2007.09.009 10.1016/j.habitatint.2014.04.001 10.1175/1520-0434(2002)017<0783:COMFPQ>2.0.CO;2 10.1057/palgrave.jors.2601988 10.1016/j.ejor.2008.11.040 10.1016/j.enconman.2010.06.015 10.1016/j.ijproman.2006.11.007 10.1061/(ASCE)0733-9364(2004)130:1(25) 10.1108/01443579910260883 10.1016/j.proeng.2013.04.034 10.1108/ECAM-02-2015-0024 10.1016/j.proeng.2014.11.803 10.1139/cjce-2013-0013 10.1287/trsc.2014.0581 10.1016/j.trc.2012.02.008 10.1016/j.autcon.2011.06.007 10.1021/ie5004174 10.1016/j.ejor.2004.01.046 10.1016/j.ijpe.2011.10.028 10.1016/j.ijproman.2007.03.001 10.1016/j.ejor.2013.03.033 10.1175/1520-0450(1984)023<1173:ROWSFE>2.0.CO;2 10.1023/A:1018560922013 10.1061/(ASCE)0887-3801(2000)14:2(117) 10.1016/j.ijpe.2009.11.004 10.1016/j.ejor.2012.09.007 10.1002/9781444320916.part2 10.1016/0377-2217(94)90419-7 10.1061/(ASCE)CP.1943-5487.0000262 10.1016/j.cie.2015.06.010 10.1016/j.ijproman.2005.11.010 10.1016/j.ijproman.2007.07.004 10.1061/(ASCE)0733-9364(2005)131:3(310) 10.1016/j.procs.2017.11.095 10.1016/j.cor.2014.01.013 10.1061/(ASCE)CO.1943-7862.0001109 10.1201/9781420047462.sec1 10.1016/S0167-8191(99)00118-0 10.1016/S0098-1354(03)00048-6 10.1016/S0969-7012(00)00013-7 10.1021/ie0100030 10.1016/S0263-7863(00)00037-5 10.1201/b16607-2 |
| ContentType | Journal Article |
| Copyright | 2018 The Authors Copyright Elsevier BV Oct 2018 |
| Copyright_xml | – notice: 2018 The Authors – notice: Copyright Elsevier BV Oct 2018 |
| DBID | 6I. AAFTH AAYXX CITATION 7SC 7SP 8FD FR3 JQ2 KR7 L7M L~C L~D |
| DOI | 10.1016/j.autcon.2018.05.029 |
| DatabaseName | ScienceDirect Open Access Titles Elsevier:ScienceDirect:Open Access CrossRef Computer and Information Systems Abstracts Electronics & Communications Abstracts Technology Research Database Engineering Research Database ProQuest Computer Science Collection Civil Engineering Abstracts Advanced Technologies Database with Aerospace Computer and Information Systems Abstracts Academic Computer and Information Systems Abstracts Professional |
| DatabaseTitle | CrossRef Civil Engineering Abstracts Technology Research Database Computer and Information Systems Abstracts – Academic Electronics & Communications Abstracts ProQuest Computer Science Collection Computer and Information Systems Abstracts Engineering Research Database Advanced Technologies Database with Aerospace Computer and Information Systems Abstracts Professional |
| DatabaseTitleList | Civil Engineering Abstracts |
| DeliveryMethod | fulltext_linktorsrc |
| Discipline | Economics Engineering |
| EISSN | 1872-7891 |
| EndPage | 61 |
| ExternalDocumentID | 10_1016_j_autcon_2018_05_029 S0926580517308580 |
| GroupedDBID | --K --M .~1 0R~ 1B1 1~. 1~5 23N 4.4 457 4G. 5GY 5VS 6I. 7-5 71M 8P~ 9JN AACTN AAEDT AAEDW AAFTH AAIAV AAIKJ AAKOC AALRI AAOAW AAQFI AAQXK AARIN AAXUO ABFNM ABMAC ABXDB ABYKQ ACDAQ ACGFS ACIWK ACNNM ACRLP ADBBV ADEZE ADMUD ADTZH AEBSH AECPX AEKER AENEX AFKWA AFTJW AGHFR AGUBO AGYEJ AHHHB AHJVU AIEXJ AIKHN AITUG AJBFU AJOXV ALMA_UNASSIGNED_HOLDINGS AMFUW AMRAJ APLSM ASPBG AVWKF AXJTR AZFZN BJAXD BKOJK BLXMC CS3 EBS EFJIC EFLBG EJD EO8 EO9 EP2 EP3 FDB FEDTE FGOYB FIRID FNPLU FYGXN G-2 G-Q GBLVA HVGLF HZ~ IHE J1W JJJVA KOM LY7 M41 MO0 N9A NEJ O-L O9- OAUVE OZT P-8 P-9 P2P PC. PQQKQ Q38 R2- RIG RNS ROL RPZ SDF SDG SDP SES SET SEW SPC SPCBC SSB SSD SST SSZ T5K WUQ ZMT ~G- 9DU AATTM AAXKI AAYWO AAYXX ABJNI ABWVN ACLOT ACRPL ACVFH ADCNI ADNMO AEIPS AEUPX AFJKZ AFPUW AGQPQ AIGII AIIUN AKBMS AKRWK AKYEP ANKPU APXCP CITATION EFKBS ~HD 7SC 7SP 8FD FR3 JQ2 KR7 L7M L~C L~D |
| ID | FETCH-LOGICAL-c380t-db5d1ea75cdc1f917d8db63271c0d9d108da2cf89a8a07d943d7332306278a5f3 |
| ISICitedReferencesCount | 137 |
| ISICitedReferencesURI | http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000443663900005&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| ISSN | 0926-5805 |
| IngestDate | Sun Nov 09 06:07:51 EST 2025 Tue Nov 18 22:38:56 EST 2025 Sat Nov 29 07:16:13 EST 2025 Fri Feb 23 02:47:14 EST 2024 |
| IsDoiOpenAccess | true |
| IsOpenAccess | true |
| IsPeerReviewed | true |
| IsScholarly | true |
| Keywords | Supply chain Modular construction Inventory Two-stage stochastic programming Logistics |
| Language | English |
| License | This is an open access article under the CC BY license. |
| LinkModel | OpenURL |
| MergedId | FETCHMERGED-LOGICAL-c380t-db5d1ea75cdc1f917d8db63271c0d9d108da2cf89a8a07d943d7332306278a5f3 |
| Notes | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
| OpenAccessLink | https://dx.doi.org/10.1016/j.autcon.2018.05.029 |
| PQID | 2111752625 |
| PQPubID | 2045277 |
| PageCount | 15 |
| ParticipantIDs | proquest_journals_2111752625 crossref_primary_10_1016_j_autcon_2018_05_029 crossref_citationtrail_10_1016_j_autcon_2018_05_029 elsevier_sciencedirect_doi_10_1016_j_autcon_2018_05_029 |
| PublicationCentury | 2000 |
| PublicationDate | October 2018 2018-10-00 20181001 |
| PublicationDateYYYYMMDD | 2018-10-01 |
| PublicationDate_xml | – month: 10 year: 2018 text: October 2018 |
| PublicationDecade | 2010 |
| PublicationPlace | Amsterdam |
| PublicationPlace_xml | – name: Amsterdam |
| PublicationTitle | Automation in construction |
| PublicationYear | 2018 |
| Publisher | Elsevier B.V Elsevier BV |
| Publisher_xml | – name: Elsevier B.V – name: Elsevier BV |
| References | Ierapetritou, Pistikopoulos (bb0140) 1996; 35 Klibi, Martel (bb0175) 2012; 135 Adulyasak, Jaillet (bb0075) 2015; 50 Assaf, Al-Hejji (bb0100) 2006; 24 Kumar, Gaddada (bb0275) 2015; 2 Kleywegt, Shapiro, Homem de Mello (bb0180) 2001; 12 Mohsen, Knytl, Abdulaal, Olearczyk, Al-Hussein (bb0290) 2008 Ballesteros-Pérez, Campo-Hitschfeld, González-Naranjo, González-Cruz (bb0220) 2015; 22 Azambuja, O'Brien (bb0015) 2008 Felfel, Ayadi, Masmoudi (bb0125) 2015 Hsu, Aurisicchio, Angeloudis (bb0310) 2017; 121 Tsiakis, Shah, Pantelides (bb0145) 2001; 40 Schütz, Tomasgard (bb0170) 2011; 134 Applequist, Gahrs, Pfeffer, Niu (bb0255) 2002; 17 Lawson, Ogden, Goodier (bb0025) 2014 Sambasivan, Soon (bb0035) 2007; 25 Odeh, Battaineh (bb0195) 2002; 20 Conradsen, Nielsen, Prahm (bb0265) 1984; 23 De La Torre (bb0030) 1994 Coyle, Langley, Novack, Gibson (bb0230) 2010 Garcia-Herreros, Wassick, Grossmann (bb0130) 2014; 53 Gupta, Maranas (bb0155) 2003; 27 Díaz-Madroñero, Peidro, Mula (bb0095) 2015; 88 Abu Hammad, Ali, Sweis, Sweis (bb0240) 2010; 26 Lei, Liu, Ruszczynski, Park (bb0080) 2006; 38 Li, Al-Hussein, Lei, Ajweh (bb0205) 2013; 40 Feng, Liu, Burns (bb0110) 2000; 2 Bu Hamdan, Barkokebas, Manrique, Al-Hussein (bb0285) 2015 Elimam, Dodin (bb0090) 2013; 224 Hsu, Aurisicchio, Angeloudis (bb0280) 2017 Pryke (bb0005) 2009 Gundecha (bb0245) 2012 Mirhassani, Lucas, Mitra, Messina, Poojari (bb0150) 2000; 26 Rogers, Bottaci (bb0020) 1997; 8 Li, Shen, Xue (bb0055) 2014; 43 Wilks (bb0250) 1995 Dytczak, Ginda, Szklennik, Wojtkiewicz (bb0210) 2013; 57 Vrijhoef, Koskela (bb0010) 2000; 6 Leung, Wu, Lai (bb0160) 2006; 57 Jung, Park, Lee, Kim (bb0215) 2016; 142 Lee (bb0120) 2005; 3 Mirzapour Al-e-hashem, Baboli, Sazvar (bb0165) 2013; 230 Azad, Rasul, Alam, Ameer Uddin, Mondal (bb0270) 2014; 90 Fosgerau, Fukuda (bb0235) 2012; 24 Hsu, Aurisicchio, Angeloudis (bb0305) 2017 Azhar, Lukkad, Ahmad (bb0050) 2013; 9 Shutz, Tomasgard, Ahmed (bb0190) 2009; 199 Poirier (bb0085) 1999 Han, Al-Hussein, Al-Jibouri, Yu (bb0295) 2012; 21 Morgan, Lackner, Vogel, Baise (bb0260) 2011; 52 Coelho, Laporte (bb0070) 2014; 47 Zou, Zhang, Wang (bb0105) 2007; 25 El-Sayegh (bb0200) 2008; 26 Sweis, Sweis, Hammad, Shboul (bb0040) 2008; 26 Barraza, Back, Mata (bb0115) 2004; 25 Chandra, Fisher (bb0065) 1994; 72 Laporte, Ortega, Pozo, Puerto (bb0225) 2017; 98 Gündüz, Nielsen, Özdemir (bb0045) 2013; 29 Taghaddos, Hermann, AbouRizk, Mohamed (bb0300) 2012; 28 Badri, Ghomi, Hejazi (bb0135) 2016; 23 Santoso, Ahmed, Goetschalckx, Shapiro (bb0185) 2005; 167 Akkermanns, Bogerd, Vos (bb0060) 1999; 19 Feng (10.1016/j.autcon.2018.05.029_bb0110) 2000; 2 Santoso (10.1016/j.autcon.2018.05.029_bb0185) 2005; 167 Han (10.1016/j.autcon.2018.05.029_bb0295) 2012; 21 Klibi (10.1016/j.autcon.2018.05.029_bb0175) 2012; 135 Vrijhoef (10.1016/j.autcon.2018.05.029_bb0010) 2000; 6 Coyle (10.1016/j.autcon.2018.05.029_bb0230) 2010 Ballesteros-Pérez (10.1016/j.autcon.2018.05.029_bb0220) 2015; 22 Applequist (10.1016/j.autcon.2018.05.029_bb0255) 2002; 17 Gupta (10.1016/j.autcon.2018.05.029_bb0155) 2003; 27 Odeh (10.1016/j.autcon.2018.05.029_bb0195) 2002; 20 Tsiakis (10.1016/j.autcon.2018.05.029_bb0145) 2001; 40 Assaf (10.1016/j.autcon.2018.05.029_bb0100) 2006; 24 Abu Hammad (10.1016/j.autcon.2018.05.029_bb0240) 2010; 26 Ierapetritou (10.1016/j.autcon.2018.05.029_bb0140) 1996; 35 Lei (10.1016/j.autcon.2018.05.029_bb0080) 2006; 38 Kumar (10.1016/j.autcon.2018.05.029_bb0275) 2015; 2 El-Sayegh (10.1016/j.autcon.2018.05.029_bb0200) 2008; 26 Taghaddos (10.1016/j.autcon.2018.05.029_bb0300) 2012; 28 Gündüz (10.1016/j.autcon.2018.05.029_bb0045) 2013; 29 Lawson (10.1016/j.autcon.2018.05.029_bb0025) 2014 Garcia-Herreros (10.1016/j.autcon.2018.05.029_bb0130) 2014; 53 Li (10.1016/j.autcon.2018.05.029_bb0205) 2013; 40 Fosgerau (10.1016/j.autcon.2018.05.029_bb0235) 2012; 24 Conradsen (10.1016/j.autcon.2018.05.029_bb0265) 1984; 23 Rogers (10.1016/j.autcon.2018.05.029_bb0020) 1997; 8 Zou (10.1016/j.autcon.2018.05.029_bb0105) 2007; 25 Lee (10.1016/j.autcon.2018.05.029_bb0120) 2005; 3 Akkermanns (10.1016/j.autcon.2018.05.029_bb0060) 1999; 19 Chandra (10.1016/j.autcon.2018.05.029_bb0065) 1994; 72 Gundecha (10.1016/j.autcon.2018.05.029_bb0245) 2012 Morgan (10.1016/j.autcon.2018.05.029_bb0260) 2011; 52 De La Torre (10.1016/j.autcon.2018.05.029_bb0030) 1994 Barraza (10.1016/j.autcon.2018.05.029_bb0115) 2004; 25 Díaz-Madroñero (10.1016/j.autcon.2018.05.029_bb0095) 2015; 88 Kleywegt (10.1016/j.autcon.2018.05.029_bb0180) 2001; 12 Leung (10.1016/j.autcon.2018.05.029_bb0160) 2006; 57 Hsu (10.1016/j.autcon.2018.05.029_bb0305) 2017 Bu Hamdan (10.1016/j.autcon.2018.05.029_bb0285) 2015 Jung (10.1016/j.autcon.2018.05.029_bb0215) 2016; 142 Azhar (10.1016/j.autcon.2018.05.029_bb0050) 2013; 9 Shutz (10.1016/j.autcon.2018.05.029_bb0190) 2009; 199 Hsu (10.1016/j.autcon.2018.05.029_bb0310) 2017; 121 Li (10.1016/j.autcon.2018.05.029_bb0055) 2014; 43 Mohsen (10.1016/j.autcon.2018.05.029_bb0290) 2008 Wilks (10.1016/j.autcon.2018.05.029_bb0250) 1995 Sweis (10.1016/j.autcon.2018.05.029_bb0040) 2008; 26 Mirhassani (10.1016/j.autcon.2018.05.029_bb0150) 2000; 26 Dytczak (10.1016/j.autcon.2018.05.029_bb0210) 2013; 57 Laporte (10.1016/j.autcon.2018.05.029_bb0225) 2017; 98 Sambasivan (10.1016/j.autcon.2018.05.029_bb0035) 2007; 25 Azambuja (10.1016/j.autcon.2018.05.029_bb0015) 2008 Azad (10.1016/j.autcon.2018.05.029_bb0270) 2014; 90 Felfel (10.1016/j.autcon.2018.05.029_bb0125) 2015 Mirzapour Al-e-hashem (10.1016/j.autcon.2018.05.029_bb0165) 2013; 230 Badri (10.1016/j.autcon.2018.05.029_bb0135) 2016; 23 Poirier (10.1016/j.autcon.2018.05.029_bb0085) 1999 Coelho (10.1016/j.autcon.2018.05.029_bb0070) 2014; 47 Pryke (10.1016/j.autcon.2018.05.029_bb0005) 2009 Elimam (10.1016/j.autcon.2018.05.029_bb0090) 2013; 224 Schütz (10.1016/j.autcon.2018.05.029_bb0170) 2011; 134 Hsu (10.1016/j.autcon.2018.05.029_bb0280) 2017 Adulyasak (10.1016/j.autcon.2018.05.029_bb0075) 2015; 50 |
| References_xml | – year: 1994 ident: bb0030 article-title: A review and Analysis of Modular Construction Practice – volume: 17 start-page: 783 year: 2002 end-page: 799 ident: bb0255 article-title: Comparison of methodologies for probabilistic quantitative precipitation forecasting publication-title: Weather Forecast. – volume: 19 start-page: 565 year: 1999 end-page: 581 ident: bb0060 article-title: Virtuous and vicious cycles on the road towards international supply chain management publication-title: Int. J. Oper. Prod. Manag. – volume: 199 start-page: 409 year: 2009 end-page: 419 ident: bb0190 article-title: Supply chain design under uncertainty using sample average approximation and dual decomposition publication-title: Eur. J. Oper. Res. – year: 2008 ident: bb0015 article-title: Construction supply chain modelling: Issues and perspectives publication-title: Construction Supply Chain Management Handbook – volume: 29 start-page: 133 year: 2013 end-page: 139 ident: bb0045 article-title: Quantification of delay factors using the relative importance index method for construction projects in Turkey publication-title: J. Manag. Eng. – volume: 27 start-page: 1219 year: 2003 end-page: 1227 ident: bb0155 article-title: Managing demand uncertainty in supply chain planning publication-title: Comput. Chem. Eng. – volume: 26 start-page: 665 year: 2008 end-page: 674 ident: bb0040 article-title: Delays in construction projects: the case of Jordan publication-title: Int. J. Proj. Manag. – volume: 135 start-page: 882 year: 2012 end-page: 898 ident: bb0175 article-title: Modeling approaches for the design of resilient supply chain networks under disruptions publication-title: Int. J. Prod. Econ. – volume: 40 start-page: 1184 year: 2013 end-page: 1195 ident: bb0205 article-title: Risk identification and assessment of modular construction utilizing fuzzy analytic hierarchy process (AHP) and simulation publication-title: Can. J. Civ. Eng. – volume: 24 start-page: 349 year: 2006 ident: bb0100 article-title: Causes of delay in large construction projects publication-title: Int. J. Proj. Manag. – volume: 26 start-page: 511 year: 2000 end-page: 538 ident: bb0150 article-title: Computational solution of capacity planning models under uncertainty publication-title: Parallel Comput. – volume: 47 start-page: 42 year: 2014 end-page: 52 ident: bb0070 article-title: Optimal joint replenishment, delivery and inventory management policies for perishable products publication-title: Comput. Oper. Res. – volume: 25 start-page: 517 year: 2007 end-page: 526 ident: bb0035 article-title: Causes and effects of delays in Malaysian construction industry publication-title: Int. J. Proj. Manag. – volume: 57 start-page: 244 year: 2013 end-page: 253 ident: bb0210 article-title: Weather influence-aware robust construction project structure publication-title: Proc. Eng. – volume: 26 start-page: 431 year: 2008 end-page: 438 ident: bb0200 article-title: Risk assessment and allocation in the UAE construction industry publication-title: Int. J. Proj. Manag. – volume: 90 start-page: 725 year: 2014 end-page: 732 ident: bb0270 article-title: Analysis of wind energy conversion system using Weibull distribution publication-title: Proc. Eng. – year: 1999 ident: bb0085 article-title: Success on progressive level publication-title: Advanced Supply Chain Management: How to Build a Sustained Competitive Advantage – volume: 40 start-page: 3585 year: 2001 end-page: 3604 ident: bb0145 article-title: Design of multi-echelon supply chain networks under demand uncertainty publication-title: Ind. Eng. Chem. Res. – volume: 167 start-page: 96 year: 2005 end-page: 115 ident: bb0185 article-title: A stochastic programming approach for supply chain network design under uncertainty publication-title: Eur. J. Oper. Res. – volume: 23 start-page: 1173 year: 1984 end-page: 1183 ident: bb0265 article-title: Review of Weibull statistics for estimation of wind distribution publication-title: J. Clim. Appl. Meteorol. – year: 1995 ident: bb0250 article-title: Parametric probability distributions publication-title: Statistical Methods in Atmospheric Sciences – volume: 142 year: 2016 ident: bb0215 article-title: Weather-delay simulation model based on vertical weather profile for high-rise building construction publication-title: J. Constr. Eng. Manag. – volume: 20 start-page: 67 year: 2002 end-page: 73 ident: bb0195 article-title: Causes of construction delay: traditional contracts publication-title: Int. J. Proj. Manag. – volume: 50 start-page: 608 year: 2015 end-page: 626 ident: bb0075 article-title: Models and algorithms for stochastic and robust vehicle routing with deadlines publication-title: Transp. Sci. – year: 2009 ident: bb0005 article-title: Introduction publication-title: Construction Supply Chain Management: Concepts and Case Studies – volume: 98 start-page: 94 year: 2017 end-page: 112 ident: bb0225 article-title: Multi-objective integration of timetables, vehicle schedules and user routings in a transit network publication-title: Transp. Res. B Methodol. – volume: 9 start-page: 203 year: 2013 end-page: 225 ident: bb0050 article-title: An investigation of critical factors and constraints for selecting modular construction over conventional stick-built technique publication-title: Int. J. Constr. Educ. Res. – volume: 57 start-page: 123 year: 2006 end-page: 132 ident: bb0160 article-title: A stochastic programming approach for multi-site aggregate production planning publication-title: J. Oper. Res. Soc. – volume: 121 start-page: 732 year: 2017 end-page: 739 ident: bb0310 article-title: Investigating schedule deviation in construction projects through root cause analysis publication-title: Proc. Comput. Sci. – volume: 38 start-page: 955 year: 2006 end-page: 970 ident: bb0080 article-title: On the integrated production, inventory, and distribution routing problem publication-title: Inst. Ind. Eng. Trans. – volume: 2 year: 2015 ident: bb0275 article-title: Statistical scrutiny of Weibull parameters for wind energy potential appraisal in the area of northern Ethiopia publication-title: Renew. Wind Water Solar – volume: 26 year: 2010 ident: bb0240 article-title: Statistical analysis on the cost and duration of public building projects publication-title: J. Manag. Eng. – start-page: 289 year: 2015 end-page: 298 ident: bb0125 article-title: A multi-site supply chain planning using multi-stage stochastic programming publication-title: Multiphysics Modelling and Simulation for Systems Design and Monitoring – year: 2010 ident: bb0230 article-title: Transportation risk management publication-title: Supply Chain Management: A Logistics Perspective – volume: 230 start-page: 26 year: 2013 end-page: 41 ident: bb0165 article-title: A stochastic aggregate production planning model in a green supply chain: considering flexible lead times, nonlinear purchase and shortage cost functions publication-title: Eur. J. Oper. Res. – volume: 23 start-page: 348 year: 2016 ident: bb0135 article-title: A two-stage stochastic programming model for value-based supply chain network design publication-title: Sci. Iran. Int. J. Sci. Technol. – volume: 8 start-page: 147 year: 1997 end-page: 156 ident: bb0020 article-title: Modular production systems: A new manufacturing paradigm publication-title: J. Intell. Manuf. – year: 2015 ident: bb0285 article-title: A BIM-based simulation model for inventory management in panelized construction publication-title: Proceedings, International Symposium on Automation and Robotics in Construction and Mining 2015, Oulu, Finland, January 7–10 – year: 2017 ident: bb0305 article-title: Establishing outsourcing and supply chain plans for prefabricated construction projects under uncertain productivity publication-title: International Conference on Computational Logistics 2017, Southampton, UK, October 18-20 – volume: 3 start-page: 310 year: 2005 end-page: 318 ident: bb0120 article-title: Probability of project completion using stochastic project scheduling simulation publication-title: J. Constr. Eng. Manag. – volume: 24 start-page: 83 year: 2012 end-page: 101 ident: bb0235 article-title: Valuing travel time variability: characteristics of the travel time distribution on an urban road publication-title: Transp. Res. C – volume: 22 start-page: 596 year: 2015 end-page: 621 ident: bb0220 article-title: Climate and construction delays: case study in Chile publication-title: Eng. Constr. Archit. Manag. – volume: 224 start-page: 530 year: 2013 end-page: 541 ident: bb0090 article-title: Project scheduling in optimizing integrated supply chain operations publication-title: Eur. J. Oper. Res. – volume: 35 start-page: 772 year: 1996 end-page: 787 ident: bb0140 article-title: Batch plant design and operations under uncertainty publication-title: Ind. Eng. Chem. Res. – volume: 43 start-page: 240 year: 2014 end-page: 249 ident: bb0055 article-title: Critical review of the research on the management of prefabricated construction publication-title: Habitat Int. – volume: 72 start-page: 503 year: 1994 end-page: 517 ident: bb0065 article-title: Coordination of production and distribution planning publication-title: Eur. J. Oper. Res. – year: 2012 ident: bb0245 article-title: Study of factors affecting labor productivity at a building construction project in the USA: Web survey – volume: 53 start-page: 17240 year: 2014 end-page: 17251 ident: bb0130 article-title: Design of resilient supply chains with risk of facility disruptions publication-title: Ind. Eng. Chem. Res. – volume: 52 start-page: 15 year: 2011 end-page: 26 ident: bb0260 article-title: Probability distributions for offshore wind speeds publication-title: Energy Convers. Manag. – volume: 12 start-page: 479 year: 2001 end-page: 502 ident: bb0180 article-title: The sample average approximation method for stochastic discrete optimization publication-title: Soc. Ind. Appl. Math. J. Optim. – volume: 25 start-page: 25 year: 2004 end-page: 32 ident: bb0115 article-title: Probabilistic forecasting of project performance using stochastic S curves publication-title: J. Constr. Eng. Manag. – volume: 28 start-page: 263 year: 2012 end-page: 274 ident: bb0300 article-title: Simulation-based multi-agent approach for scheduling modular construction publication-title: J. Comput. Civ. Eng. – volume: 21 start-page: 229 year: 2012 end-page: 236 ident: bb0295 article-title: Automated post-simulation visualization of modular building production assembly line publication-title: Autom. Constr. – volume: 134 start-page: 300 year: 2011 end-page: 311 ident: bb0170 article-title: The impact of flexibility on operational supply chain planning publication-title: Int. J. Prod. Econ. – volume: 2 start-page: 117 year: 2000 end-page: 126 ident: bb0110 article-title: Stochastic construction time-cost trade-off analysis publication-title: J. Comput. Civ. Eng. – volume: 88 start-page: 518 year: 2015 end-page: 535 ident: bb0095 article-title: A review of tactical optimization models for integrated production and transport routing planning decisions publication-title: Comput. Ind. Eng. – volume: 25 start-page: 601 year: 2007 end-page: 614 ident: bb0105 article-title: Understanding the key risks in construction projects in China publication-title: Int. J. Proj. Manag. – volume: 6 start-page: 169 year: 2000 end-page: 178 ident: bb0010 article-title: The four roles of supply chain management in construction publication-title: Eur. J. Purch. Supply Manag. – start-page: 805 year: 2017 end-page: 812 ident: bb0280 article-title: Supply chain design for modular construction projects publication-title: LC3 2017 Volume II – Proceedings of the 25th Annual Conference of the International Group for Lean Construction (IGLC) – year: 2014 ident: bb0025 article-title: Introduction to planning of modular buildings publication-title: Design in Modular Construction – start-page: 2471 year: 2008 end-page: 2478 ident: bb0290 article-title: Simulation of modular building construction publication-title: Winter Simulation Conference 2008, Miami, USA, December 7–10 – volume: 35 start-page: 772 issue: 3 year: 1996 ident: 10.1016/j.autcon.2018.05.029_bb0140 article-title: Batch plant design and operations under uncertainty publication-title: Ind. Eng. Chem. Res. doi: 10.1021/ie950263f – volume: 98 start-page: 94 year: 2017 ident: 10.1016/j.autcon.2018.05.029_bb0225 article-title: Multi-objective integration of timetables, vehicle schedules and user routings in a transit network publication-title: Transp. Res. B Methodol. doi: 10.1016/j.trb.2016.12.018 – volume: 26 start-page: 665 issue: 6 year: 2008 ident: 10.1016/j.autcon.2018.05.029_bb0040 article-title: Delays in construction projects: the case of Jordan publication-title: Int. J. Proj. Manag. doi: 10.1016/j.ijproman.2007.09.009 – volume: 43 start-page: 240 year: 2014 ident: 10.1016/j.autcon.2018.05.029_bb0055 article-title: Critical review of the research on the management of prefabricated construction publication-title: Habitat Int. doi: 10.1016/j.habitatint.2014.04.001 – volume: 17 start-page: 783 issue: 4 year: 2002 ident: 10.1016/j.autcon.2018.05.029_bb0255 article-title: Comparison of methodologies for probabilistic quantitative precipitation forecasting publication-title: Weather Forecast. doi: 10.1175/1520-0434(2002)017<0783:COMFPQ>2.0.CO;2 – volume: 57 start-page: 123 year: 2006 ident: 10.1016/j.autcon.2018.05.029_bb0160 article-title: A stochastic programming approach for multi-site aggregate production planning publication-title: J. Oper. Res. Soc. doi: 10.1057/palgrave.jors.2601988 – volume: 199 start-page: 409 year: 2009 ident: 10.1016/j.autcon.2018.05.029_bb0190 article-title: Supply chain design under uncertainty using sample average approximation and dual decomposition publication-title: Eur. J. Oper. Res. doi: 10.1016/j.ejor.2008.11.040 – volume: 52 start-page: 15 year: 2011 ident: 10.1016/j.autcon.2018.05.029_bb0260 article-title: Probability distributions for offshore wind speeds publication-title: Energy Convers. Manag. doi: 10.1016/j.enconman.2010.06.015 – volume: 25 start-page: 517 issue: 5 year: 2007 ident: 10.1016/j.autcon.2018.05.029_bb0035 article-title: Causes and effects of delays in Malaysian construction industry publication-title: Int. J. Proj. Manag. doi: 10.1016/j.ijproman.2006.11.007 – volume: 25 start-page: 25 year: 2004 ident: 10.1016/j.autcon.2018.05.029_bb0115 article-title: Probabilistic forecasting of project performance using stochastic S curves publication-title: J. Constr. Eng. Manag. doi: 10.1061/(ASCE)0733-9364(2004)130:1(25) – volume: 19 start-page: 565 issue: 5/6 year: 1999 ident: 10.1016/j.autcon.2018.05.029_bb0060 article-title: Virtuous and vicious cycles on the road towards international supply chain management publication-title: Int. J. Oper. Prod. Manag. doi: 10.1108/01443579910260883 – volume: 23 start-page: 348 issue: 1 year: 2016 ident: 10.1016/j.autcon.2018.05.029_bb0135 article-title: A two-stage stochastic programming model for value-based supply chain network design publication-title: Sci. Iran. Int. J. Sci. Technol. – volume: 57 start-page: 244 year: 2013 ident: 10.1016/j.autcon.2018.05.029_bb0210 article-title: Weather influence-aware robust construction project structure publication-title: Proc. Eng. doi: 10.1016/j.proeng.2013.04.034 – volume: 22 start-page: 596 issue: 6 year: 2015 ident: 10.1016/j.autcon.2018.05.029_bb0220 article-title: Climate and construction delays: case study in Chile publication-title: Eng. Constr. Archit. Manag. doi: 10.1108/ECAM-02-2015-0024 – volume: 90 start-page: 725 year: 2014 ident: 10.1016/j.autcon.2018.05.029_bb0270 article-title: Analysis of wind energy conversion system using Weibull distribution publication-title: Proc. Eng. doi: 10.1016/j.proeng.2014.11.803 – volume: 2 issue: 14 year: 2015 ident: 10.1016/j.autcon.2018.05.029_bb0275 article-title: Statistical scrutiny of Weibull parameters for wind energy potential appraisal in the area of northern Ethiopia publication-title: Renew. Wind Water Solar – volume: 40 start-page: 1184 issue: 12 year: 2013 ident: 10.1016/j.autcon.2018.05.029_bb0205 article-title: Risk identification and assessment of modular construction utilizing fuzzy analytic hierarchy process (AHP) and simulation publication-title: Can. J. Civ. Eng. doi: 10.1139/cjce-2013-0013 – volume: 50 start-page: 608 issue: 2 year: 2015 ident: 10.1016/j.autcon.2018.05.029_bb0075 article-title: Models and algorithms for stochastic and robust vehicle routing with deadlines publication-title: Transp. Sci. doi: 10.1287/trsc.2014.0581 – volume: 24 start-page: 83 year: 2012 ident: 10.1016/j.autcon.2018.05.029_bb0235 article-title: Valuing travel time variability: characteristics of the travel time distribution on an urban road publication-title: Transp. Res. C doi: 10.1016/j.trc.2012.02.008 – volume: 21 start-page: 229 year: 2012 ident: 10.1016/j.autcon.2018.05.029_bb0295 article-title: Automated post-simulation visualization of modular building production assembly line publication-title: Autom. Constr. doi: 10.1016/j.autcon.2011.06.007 – volume: 53 start-page: 17240 issue: 44 year: 2014 ident: 10.1016/j.autcon.2018.05.029_bb0130 article-title: Design of resilient supply chains with risk of facility disruptions publication-title: Ind. Eng. Chem. Res. doi: 10.1021/ie5004174 – volume: 167 start-page: 96 year: 2005 ident: 10.1016/j.autcon.2018.05.029_bb0185 article-title: A stochastic programming approach for supply chain network design under uncertainty publication-title: Eur. J. Oper. Res. doi: 10.1016/j.ejor.2004.01.046 – year: 1995 ident: 10.1016/j.autcon.2018.05.029_bb0250 article-title: Parametric probability distributions – volume: 135 start-page: 882 year: 2012 ident: 10.1016/j.autcon.2018.05.029_bb0175 article-title: Modeling approaches for the design of resilient supply chain networks under disruptions publication-title: Int. J. Prod. Econ. doi: 10.1016/j.ijpe.2011.10.028 – volume: 29 start-page: 133 issue: 2 year: 2013 ident: 10.1016/j.autcon.2018.05.029_bb0045 article-title: Quantification of delay factors using the relative importance index method for construction projects in Turkey publication-title: J. Manag. Eng. – year: 2012 ident: 10.1016/j.autcon.2018.05.029_bb0245 – volume: 25 start-page: 601 issue: 6 year: 2007 ident: 10.1016/j.autcon.2018.05.029_bb0105 article-title: Understanding the key risks in construction projects in China publication-title: Int. J. Proj. Manag. doi: 10.1016/j.ijproman.2007.03.001 – volume: 230 start-page: 26 year: 2013 ident: 10.1016/j.autcon.2018.05.029_bb0165 article-title: A stochastic aggregate production planning model in a green supply chain: considering flexible lead times, nonlinear purchase and shortage cost functions publication-title: Eur. J. Oper. Res. doi: 10.1016/j.ejor.2013.03.033 – year: 2010 ident: 10.1016/j.autcon.2018.05.029_bb0230 article-title: Transportation risk management – volume: 23 start-page: 1173 year: 1984 ident: 10.1016/j.autcon.2018.05.029_bb0265 article-title: Review of Weibull statistics for estimation of wind distribution publication-title: J. Clim. Appl. Meteorol. doi: 10.1175/1520-0450(1984)023<1173:ROWSFE>2.0.CO;2 – volume: 8 start-page: 147 issue: 2 year: 1997 ident: 10.1016/j.autcon.2018.05.029_bb0020 article-title: Modular production systems: A new manufacturing paradigm publication-title: J. Intell. Manuf. doi: 10.1023/A:1018560922013 – volume: 2 start-page: 117 issue: 117 year: 2000 ident: 10.1016/j.autcon.2018.05.029_bb0110 article-title: Stochastic construction time-cost trade-off analysis publication-title: J. Comput. Civ. Eng. doi: 10.1061/(ASCE)0887-3801(2000)14:2(117) – volume: 134 start-page: 300 year: 2011 ident: 10.1016/j.autcon.2018.05.029_bb0170 article-title: The impact of flexibility on operational supply chain planning publication-title: Int. J. Prod. Econ. doi: 10.1016/j.ijpe.2009.11.004 – volume: 224 start-page: 530 issue: 3 year: 2013 ident: 10.1016/j.autcon.2018.05.029_bb0090 article-title: Project scheduling in optimizing integrated supply chain operations publication-title: Eur. J. Oper. Res. doi: 10.1016/j.ejor.2012.09.007 – year: 2009 ident: 10.1016/j.autcon.2018.05.029_bb0005 article-title: Introduction doi: 10.1002/9781444320916.part2 – year: 1994 ident: 10.1016/j.autcon.2018.05.029_bb0030 – volume: 72 start-page: 503 issue: 3 year: 1994 ident: 10.1016/j.autcon.2018.05.029_bb0065 article-title: Coordination of production and distribution planning publication-title: Eur. J. Oper. Res. doi: 10.1016/0377-2217(94)90419-7 – volume: 28 start-page: 263 issue: 2 year: 2012 ident: 10.1016/j.autcon.2018.05.029_bb0300 article-title: Simulation-based multi-agent approach for scheduling modular construction publication-title: J. Comput. Civ. Eng. doi: 10.1061/(ASCE)CP.1943-5487.0000262 – volume: 88 start-page: 518 year: 2015 ident: 10.1016/j.autcon.2018.05.029_bb0095 article-title: A review of tactical optimization models for integrated production and transport routing planning decisions publication-title: Comput. Ind. Eng. doi: 10.1016/j.cie.2015.06.010 – volume: 24 start-page: 349 issue: 4 year: 2006 ident: 10.1016/j.autcon.2018.05.029_bb0100 article-title: Causes of delay in large construction projects publication-title: Int. J. Proj. Manag. doi: 10.1016/j.ijproman.2005.11.010 – volume: 26 start-page: 431 issue: 4 year: 2008 ident: 10.1016/j.autcon.2018.05.029_bb0200 article-title: Risk assessment and allocation in the UAE construction industry publication-title: Int. J. Proj. Manag. doi: 10.1016/j.ijproman.2007.07.004 – volume: 3 start-page: 310 issue: 310 year: 2005 ident: 10.1016/j.autcon.2018.05.029_bb0120 article-title: Probability of project completion using stochastic project scheduling simulation publication-title: J. Constr. Eng. Manag. doi: 10.1061/(ASCE)0733-9364(2005)131:3(310) – volume: 121 start-page: 732 year: 2017 ident: 10.1016/j.autcon.2018.05.029_bb0310 article-title: Investigating schedule deviation in construction projects through root cause analysis publication-title: Proc. Comput. Sci. doi: 10.1016/j.procs.2017.11.095 – volume: 38 start-page: 955 issue: 11 year: 2006 ident: 10.1016/j.autcon.2018.05.029_bb0080 article-title: On the integrated production, inventory, and distribution routing problem publication-title: Inst. Ind. Eng. Trans. – start-page: 289 year: 2015 ident: 10.1016/j.autcon.2018.05.029_bb0125 article-title: A multi-site supply chain planning using multi-stage stochastic programming – start-page: 805 year: 2017 ident: 10.1016/j.autcon.2018.05.029_bb0280 article-title: Supply chain design for modular construction projects – year: 2017 ident: 10.1016/j.autcon.2018.05.029_bb0305 article-title: Establishing outsourcing and supply chain plans for prefabricated construction projects under uncertain productivity – year: 2015 ident: 10.1016/j.autcon.2018.05.029_bb0285 article-title: A BIM-based simulation model for inventory management in panelized construction – volume: 12 start-page: 479 year: 2001 ident: 10.1016/j.autcon.2018.05.029_bb0180 article-title: The sample average approximation method for stochastic discrete optimization publication-title: Soc. Ind. Appl. Math. J. Optim. – volume: 47 start-page: 42 year: 2014 ident: 10.1016/j.autcon.2018.05.029_bb0070 article-title: Optimal joint replenishment, delivery and inventory management policies for perishable products publication-title: Comput. Oper. Res. doi: 10.1016/j.cor.2014.01.013 – volume: 142 issue: 6 year: 2016 ident: 10.1016/j.autcon.2018.05.029_bb0215 article-title: Weather-delay simulation model based on vertical weather profile for high-rise building construction publication-title: J. Constr. Eng. Manag. doi: 10.1061/(ASCE)CO.1943-7862.0001109 – volume: 9 start-page: 203 issue: 3 year: 2013 ident: 10.1016/j.autcon.2018.05.029_bb0050 article-title: An investigation of critical factors and constraints for selecting modular construction over conventional stick-built technique publication-title: Int. J. Constr. Educ. Res. – year: 2008 ident: 10.1016/j.autcon.2018.05.029_bb0015 article-title: Construction supply chain modelling: Issues and perspectives doi: 10.1201/9781420047462.sec1 – volume: 26 issue: 2 year: 2010 ident: 10.1016/j.autcon.2018.05.029_bb0240 article-title: Statistical analysis on the cost and duration of public building projects publication-title: J. Manag. Eng. – year: 1999 ident: 10.1016/j.autcon.2018.05.029_bb0085 article-title: Success on progressive level – volume: 26 start-page: 511 issue: 5 year: 2000 ident: 10.1016/j.autcon.2018.05.029_bb0150 article-title: Computational solution of capacity planning models under uncertainty publication-title: Parallel Comput. doi: 10.1016/S0167-8191(99)00118-0 – volume: 27 start-page: 1219 issue: 8–9 year: 2003 ident: 10.1016/j.autcon.2018.05.029_bb0155 article-title: Managing demand uncertainty in supply chain planning publication-title: Comput. Chem. Eng. doi: 10.1016/S0098-1354(03)00048-6 – volume: 6 start-page: 169 issue: 3 year: 2000 ident: 10.1016/j.autcon.2018.05.029_bb0010 article-title: The four roles of supply chain management in construction publication-title: Eur. J. Purch. Supply Manag. doi: 10.1016/S0969-7012(00)00013-7 – volume: 40 start-page: 3585 issue: 16 year: 2001 ident: 10.1016/j.autcon.2018.05.029_bb0145 article-title: Design of multi-echelon supply chain networks under demand uncertainty publication-title: Ind. Eng. Chem. Res. doi: 10.1021/ie0100030 – volume: 20 start-page: 67 issue: 1 year: 2002 ident: 10.1016/j.autcon.2018.05.029_bb0195 article-title: Causes of construction delay: traditional contracts publication-title: Int. J. Proj. Manag. doi: 10.1016/S0263-7863(00)00037-5 – start-page: 2471 year: 2008 ident: 10.1016/j.autcon.2018.05.029_bb0290 article-title: Simulation of modular building construction – year: 2014 ident: 10.1016/j.autcon.2018.05.029_bb0025 article-title: Introduction to planning of modular buildings doi: 10.1201/b16607-2 |
| SSID | ssj0007069 |
| Score | 2.5765505 |
| Snippet | The construction sector is currently undergoing a shift from stick-built construction to modular building systems that take advantage of modern prefabrication... |
| SourceID | proquest crossref elsevier |
| SourceType | Aggregation Database Enrichment Source Index Database Publisher |
| StartPage | 47 |
| SubjectTerms | Construction industry Construction planning Construction sites Delivery scheduling Inventory Inventory management Logistics Modular construction Modular systems Optimization Prefabricated buildings Prefabrication Raw materials Residential buildings Stochastic models Stochastic programming Supply chain Supply chains Two-stage stochastic programming |
| Title | Optimal logistics planning for modular construction using two-stage stochastic programming |
| URI | https://dx.doi.org/10.1016/j.autcon.2018.05.029 https://www.proquest.com/docview/2111752625 |
| Volume | 94 |
| WOSCitedRecordID | wos000443663900005&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| hasFullText | 1 |
| inHoldings | 1 |
| isFullTextHit | |
| isPrint | |
| journalDatabaseRights | – providerCode: PRVESC databaseName: Elsevier SD Freedom Collection Journals 2021 customDbUrl: eissn: 1872-7891 dateEnd: 99991231 omitProxy: false ssIdentifier: ssj0007069 issn: 0926-5805 databaseCode: AIEXJ dateStart: 19950101 isFulltext: true titleUrlDefault: https://www.sciencedirect.com providerName: Elsevier |
| link | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV3Pb9MwFLZKhwQcEAwmBgP5gLhMlhw7qZ1jhToBmjoOHSpcrMROWKY1KbQZu_Kf459JYILBgUsUpXEavff5-fnlve8B8JLgpEiLnKMkpxLFEctRRguOZD7BZRpbznLbbILN53y5TN-PRt9DLczlBatrfnWVrv-rqvU1rWxTOvsP6u4eqi_oc610fdRq18e_UvyJNgIrLXhX22NImNe-MZFNKVw1ymaeyqbnjj1sbcRg-61B2ln8bEhnG3mWmdEhgWsVlrjAWNtuG1f1eGgz2fuHdUDZtC4BuEIf2x6DU5NF27Sq8h0CTJukZlt1rv3UsBpWUp5Vja8lks0wNBHxLsnNx8u6mpkPw7gjmaCEY_cpu3BWlzPt5nPXtiuY5TQe2FXHynnN3LvIw7lJ9jHRA_MOlofVB1F-Yteen4ij0-NjsZgtF6_WX5BpPGY-0PsuLLfADmFJysdgZ_p2tnzXLecMTxxho3_vUH9pkwSv__Hv_JtfVnrrviwegPt-3wGnDi8Pwaiod8GdUJa-2QX3BsyUj8AnjyLYoQgGFEGNIuhRBIeKhxZFsEMR7FEEByh6DE6PZovXb5Bvw4Ek5XiLVJ6oqMhYIpWMSr29V1zlE0pYJLFKVYS5yogseZrxDDOVxlQxSs3WljCeJSXdA-O6qYsnAEapHpKxKM4YiUsbXUjyOMJUFSUlWO4DGoQnpOeoN61SLkRIRjwXTuTCiFzgRGiR7wPUjVo7jpYb7mdBL8L7mc5_FBpXN4w8CGoUfspvBIkM3S2ZkOTpn39-Bu72s-QAjLV6iufgtrzUk-zrC4-7H8s-rQM |
| linkProvider | Elsevier |
| openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Optimal+logistics+planning+for+modular+construction+using+two-stage+stochastic+programming&rft.jtitle=Automation+in+construction&rft.au=Hsu%2C+Pei-Yuan&rft.au=Angeloudis%2C+Panagiotis&rft.au=Aurisicchio%2C+Marco&rft.date=2018-10-01&rft.pub=Elsevier+BV&rft.issn=0926-5805&rft.eissn=1872-7891&rft.volume=94&rft.spage=47&rft_id=info:doi/10.1016%2Fj.autcon.2018.05.029&rft.externalDBID=NO_FULL_TEXT |
| thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0926-5805&client=summon |
| thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0926-5805&client=summon |
| thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0926-5805&client=summon |