Multi-mode resource-constrained project scheduling problem with material ordering under bonus–penalty policies
This study emphasizes that project scheduling and material ordering (time and quantity of an order) must be considered simultaneously to minimize the total cost, as setting the material ordering decisions after the project scheduling phase leads to non-optimal solutions. Hence, this paper mathematic...