APA-Zitierstil (7. Ausg.)

Zoraghi, N., Shahsavar, A., Abbasi, B., & Van Peteghem, V. (2017). Multi-mode resource-constrained project scheduling problem with material ordering under bonus–penalty policies. TOP, 25(1), 49-79. https://doi.org/10.1007/s11750-016-0415-2

Chicago-Zitierstil (17. Ausg.)

Zoraghi, Nima, Aria Shahsavar, Babak Abbasi, und Vincent Van Peteghem. "Multi-mode Resource-constrained Project Scheduling Problem with Material Ordering Under Bonus–penalty Policies." TOP 25, no. 1 (2017): 49-79. https://doi.org/10.1007/s11750-016-0415-2.

MLA-Zitierstil (9. Ausg.)

Zoraghi, Nima, et al. "Multi-mode Resource-constrained Project Scheduling Problem with Material Ordering Under Bonus–penalty Policies." TOP, vol. 25, no. 1, 2017, pp. 49-79, https://doi.org/10.1007/s11750-016-0415-2.

Achtung: Diese Zitate sind unter Umständen nicht zu 100% korrekt.