Citace podle APA (7th ed.)

Wu, J., & Liu, Y. (2025). A modified multi-agent proximal policy optimization algorithm for multi-objective dynamic partial-re-entrant hybrid flow shop scheduling problem. Engineering applications of artificial intelligence, 140, 109688. https://doi.org/10.1016/j.engappai.2024.109688

Citace podle Chicago (17th ed.)

Wu, Jiawei, a Yong Liu. "A Modified Multi-agent Proximal Policy Optimization Algorithm for Multi-objective Dynamic Partial-re-entrant Hybrid Flow Shop Scheduling Problem." Engineering Applications of Artificial Intelligence 140 (2025): 109688. https://doi.org/10.1016/j.engappai.2024.109688.

Citace podle MLA (9th ed.)

Wu, Jiawei, a Yong Liu. "A Modified Multi-agent Proximal Policy Optimization Algorithm for Multi-objective Dynamic Partial-re-entrant Hybrid Flow Shop Scheduling Problem." Engineering Applications of Artificial Intelligence, vol. 140, 2025, p. 109688, https://doi.org/10.1016/j.engappai.2024.109688.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..