APA (7th ed.) Citation

Mai, N. L., Topal, E., Erten, O., & Sommerville, B. (2019). A new risk-based optimisation method for the iron ore production scheduling using stochastic integer programming. Resources policy, 62, 571-579. https://doi.org/10.1016/j.resourpol.2018.11.004

Chicago Style (17th ed.) Citation

Mai, Ngoc Luan, Erkan Topal, Oktay Erten, and Bruce Sommerville. "A New Risk-based Optimisation Method for the Iron Ore Production Scheduling Using Stochastic Integer Programming." Resources Policy 62 (2019): 571-579. https://doi.org/10.1016/j.resourpol.2018.11.004.

MLA (9th ed.) Citation

Mai, Ngoc Luan, et al. "A New Risk-based Optimisation Method for the Iron Ore Production Scheduling Using Stochastic Integer Programming." Resources Policy, vol. 62, 2019, pp. 571-579, https://doi.org/10.1016/j.resourpol.2018.11.004.

Warning: These citations may not always be 100% accurate.