Single machine scheduling to maximize the number of on-time jobs with generalized due-dates
In scheduling problems with generalized due dates (gdd), the due dates are specified according to their position in the sequence, and the j -th due date is assigned to the job in the j -th position. We study a single-machine problem with generalized due dates, where the objective is maximizing the n...