Citace podle APA (7th ed.)

Gerstl, E., & Mosheiov, G. (2020). Single machine scheduling to maximize the number of on-time jobs with generalized due-dates. Journal of scheduling, 23(3), 289-299. https://doi.org/10.1007/s10951-020-00638-7

Citace podle Chicago (17th ed.)

Gerstl, Enrique, a Gur Mosheiov. "Single Machine Scheduling to Maximize the Number of On-time Jobs with Generalized Due-dates." Journal of Scheduling 23, no. 3 (2020): 289-299. https://doi.org/10.1007/s10951-020-00638-7.

Citace podle MLA (9th ed.)

Gerstl, Enrique, a Gur Mosheiov. "Single Machine Scheduling to Maximize the Number of On-time Jobs with Generalized Due-dates." Journal of Scheduling, vol. 23, no. 3, 2020, pp. 289-299, https://doi.org/10.1007/s10951-020-00638-7.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..