Citace podle APA (7th ed.)

Atsmony, M., & Mosheiov, G. (2023). Scheduling to maximize the weighted number of on-time jobs on parallel machines with bounded job-rejection. Journal of scheduling, 26(2), 193-207. https://doi.org/10.1007/s10951-022-00745-7

Citace podle Chicago (17th ed.)

Atsmony, Matan, a Gur Mosheiov. "Scheduling to Maximize the Weighted Number of On-time Jobs on Parallel Machines with Bounded Job-rejection." Journal of Scheduling 26, no. 2 (2023): 193-207. https://doi.org/10.1007/s10951-022-00745-7.

Citace podle MLA (9th ed.)

Atsmony, Matan, a Gur Mosheiov. "Scheduling to Maximize the Weighted Number of On-time Jobs on Parallel Machines with Bounded Job-rejection." Journal of Scheduling, vol. 26, no. 2, 2023, pp. 193-207, https://doi.org/10.1007/s10951-022-00745-7.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..