A branch-and-bound algorithm for the two-machine total completion time flowshop problem subject to release dates
We consider the problem of minimizing the sum of completion times in a two-machine permutation flowshop problem subject to release dates. We derive several lower bounds as well as a branch-and-bound algorithm for the problem under consideration. Computational experiments, on a large set of randomly...
Uloženo v:
| Vydáno v: | Operational research Ročník 20; číslo 1; s. 21 - 35 |
|---|---|
| Hlavní autoři: | , , , |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
Berlin/Heidelberg
Springer Berlin Heidelberg
01.03.2020
Springer Nature B.V |
| Témata: | |
| ISSN: | 1109-2858, 1866-1505 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | We consider the problem of minimizing the sum of completion times in a two-machine permutation flowshop problem subject to release dates. We derive several lower bounds as well as a branch-and-bound algorithm for the problem under consideration. Computational experiments, on a large set of randomly generated instances, provide evidence that the proposed procedure performs consistently well. |
|---|---|
| Bibliografie: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
| ISSN: | 1109-2858 1866-1505 |
| DOI: | 10.1007/s12351-017-0308-7 |