A Multi-Objective Demand/Generation Scheduling Model-Based Microgrid Energy Management System

In recent years, microgrids (MGs) have been developed to improve the overall management of the power network. This paper examines how a smart MG’s generation and demand sides are managed to improve the MG’s performance in order to minimize operating costs and emissions. A binary orientation search a...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:Sustainability Ročník 14; číslo 16; s. 10158
Hlavní autoři: Jasim, Ali M., Jasim, Basil H., Kraiem, Habib, Flah, Aymen
Médium: Journal Article
Jazyk:angličtina
Vydáno: Basel MDPI AG 01.08.2022
Témata:
ISSN:2071-1050, 2071-1050
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Popis
Shrnutí:In recent years, microgrids (MGs) have been developed to improve the overall management of the power network. This paper examines how a smart MG’s generation and demand sides are managed to improve the MG’s performance in order to minimize operating costs and emissions. A binary orientation search algorithm (BOSA)-based optimal demand side management (DSM) program using the load-shifting technique has been proposed, resulting in significant electricity cost savings. The proposed optimal DSM-based energy management strategy considers the MG’s economic and environmental indices to be the key objective functions. Single-objective particle swarm optimization (SOPSO) and multi-objective particle swarm optimization (MOPSO) were adopted in order to optimize MG performance in the presence of renewable energy resources (RERs) with a randomized natural behavior. A PSO algorithm was adopted due to the nonlinearity and complexity of the proposed problem. In addition, fuzzy-based mechanisms and a nonlinear sorting system were used to discover the optimal compromise given the collection of Pareto-front space solutions. To test the proposed method in a more realistic setting, the stochastic behavior of renewable units was also factored in. The simulation findings indicate that the proposed BOSA algorithm-based DSM had the lowest peak demand (88.4 kWh) compared to unscheduled demand (105 kWh); additionally, the operating costs were reduced by 23%, from 660 USD to 508 USD, and the emissions decreased from 840 kg to 725 kg, saving 13.7%.
Bibliografie:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:2071-1050
2071-1050
DOI:10.3390/su141610158