Fuzzy multi-objective procurement/production planning decision problems for recoverable manufacturing systems
•Fuzzy multi-objective linear programming model.•Procurement/production planning decision.•Recoverable manufacturing systems. In actual lot-sizing production-to-order problems for recoverable remanufacturing systems, input data or parameters are often imprecise or fuzzy. This study develops a novel...
Saved in:
| Published in: | Journal of manufacturing systems Vol. 37; pp. 396 - 408 |
|---|---|
| Main Authors: | , |
| Format: | Journal Article |
| Language: | English |
| Published: |
Elsevier Ltd
01.10.2015
|
| Subjects: | |
| ISSN: | 0278-6125, 1878-6642 |
| Online Access: | Get full text |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Abstract | •Fuzzy multi-objective linear programming model.•Procurement/production planning decision.•Recoverable manufacturing systems.
In actual lot-sizing production-to-order problems for recoverable remanufacturing systems, input data or parameters are often imprecise or fuzzy. This study develops a novel fuzzy multi-objective linear programming (FMOLP) model with a piecewise linear membership function to solve integrated, procurement/production, planning decision problems with fuzzy environments and deal with multi-component, multi-vendor, multi-source and multi-machines under recoverable remanufacturing systems. The initial FMOLP model developed in this study attempts to simultaneously minimize total costs and total lead times in relation to supplier capacity, lead time, lot release, machine yield and customer demand. The proposed FMOLP model provides a systematic framework that facilitates a fuzzy decision-making process, enabling a decision maker to interactively adjust search direction during the solution procedure to obtain the preferred satisfactory solution. To test the model's adequacy, an actual implementation of several scenarios was conducted using remanufacturing production systems. The analytical results presented in this study can help decision managers better understand systematic analysis and the potential for improving cost-effectiveness and lead time in terms of recoverable remanufacturing planning. |
|---|---|
| AbstractList | •Fuzzy multi-objective linear programming model.•Procurement/production planning decision.•Recoverable manufacturing systems.
In actual lot-sizing production-to-order problems for recoverable remanufacturing systems, input data or parameters are often imprecise or fuzzy. This study develops a novel fuzzy multi-objective linear programming (FMOLP) model with a piecewise linear membership function to solve integrated, procurement/production, planning decision problems with fuzzy environments and deal with multi-component, multi-vendor, multi-source and multi-machines under recoverable remanufacturing systems. The initial FMOLP model developed in this study attempts to simultaneously minimize total costs and total lead times in relation to supplier capacity, lead time, lot release, machine yield and customer demand. The proposed FMOLP model provides a systematic framework that facilitates a fuzzy decision-making process, enabling a decision maker to interactively adjust search direction during the solution procedure to obtain the preferred satisfactory solution. To test the model's adequacy, an actual implementation of several scenarios was conducted using remanufacturing production systems. The analytical results presented in this study can help decision managers better understand systematic analysis and the potential for improving cost-effectiveness and lead time in terms of recoverable remanufacturing planning. |
| Author | Su, Tai-Sheng Lin, Yu-Fan |
| Author_xml | – sequence: 1 givenname: Tai-Sheng surname: Su fullname: Su, Tai-Sheng email: tyson@mail.npust.edu.tw, tysonsu0105@gmail.com – sequence: 2 givenname: Yu-Fan surname: Lin fullname: Lin, Yu-Fan |
| BookMark | eNp9kM9KAzEQh4NUsK2-gKd9gd3O_k_BixSrQsGLnkM2mZUsu0lJsoXt05u1njz0MjP8Ml9gvhVZaKORkMcUkhTSatMl3eCmJIO0SKBOAOobskxpTeOqKrIFWUI2z2lW3pGVcx1AmhWQLcmwH8_nKRrG3qvYNB0Kr04YHa0Ro8UBtd-EWY4hNjo69lxrpb8jiUK538SapsfBRa2xkUVhTmh5SKKB67Hlwo923neT82Hrnty2vHf48NfX5Gv_8rl7iw8fr--750Ms8hp8XBY5RWgaWpUl5pKWkla5bBrgUBWhbtuCbilwKbCuBZdtzsvw2hQoshrbPF8TevlXWOOcxZYJ5fl8grdc9SwFNmtjHZu1sVkbg5oFbQHN_qFHqwZup-vQ0wXCcNRJoWVOKNQCpQpOPJNGXcN_AH62jm8 |
| CitedBy_id | crossref_primary_10_1080_00207543_2023_2204958 crossref_primary_10_1080_00207543_2019_1566665 crossref_primary_10_1080_02522667_2018_1462033 crossref_primary_10_1016_j_jclepro_2019_03_009 crossref_primary_10_1016_j_autcon_2022_104256 crossref_primary_10_1016_j_jclepro_2025_144686 crossref_primary_10_1007_s40815_017_0341_y crossref_primary_10_1016_j_cie_2017_06_021 crossref_primary_10_1016_j_jclepro_2018_07_004 crossref_primary_10_1007_s00500_015_1839_6 crossref_primary_10_1016_j_eswa_2022_116663 crossref_primary_10_1155_2015_780830 crossref_primary_10_1049_cit2_12336 crossref_primary_10_1109_TASE_2021_3061757 crossref_primary_10_1016_j_cie_2020_106681 crossref_primary_10_1016_j_resconrec_2021_105572 crossref_primary_10_1016_j_jmsy_2020_11_002 crossref_primary_10_1007_s40032_024_01026_2 crossref_primary_10_1016_j_jmsy_2015_02_001 crossref_primary_10_1080_00207543_2017_1308575 crossref_primary_10_1080_02522667_2020_1714892 crossref_primary_10_1007_s40815_018_0542_z crossref_primary_10_1017_S0890060419000222 crossref_primary_10_1016_j_jclepro_2018_04_105 crossref_primary_10_1016_j_jclepro_2019_118591 crossref_primary_10_1515_math_2019_0048 crossref_primary_10_1016_j_jmsy_2017_06_002 crossref_primary_10_1016_j_cie_2021_107282 crossref_primary_10_1007_s40815_020_01002_9 |
| Cites_doi | 10.1016/j.ijpe.2010.01.007 10.1016/j.ejor.2011.12.028 10.1016/j.eswa.2012.05.051 10.1016/j.advengsoft.2010.07.002 10.1016/j.asoc.2009.10.010 10.1016/j.cie.2009.11.004 10.1080/00207543.2011.560907 10.1080/00207540310001632466 10.1016/j.agwat.2010.08.010 10.1016/j.jmsy.2013.11.002 10.1016/j.jfranklin.2007.12.003 10.1016/j.cie.2003.09.009 10.1016/j.ijpe.2010.04.018 10.1016/j.cie.2007.11.001 10.1016/j.eswa.2011.12.056 10.1016/j.apm.2013.03.006 10.1016/j.ijpe.2011.12.013 10.1016/j.jmsy.2010.05.001 10.1016/j.ejor.2009.07.018 10.1016/j.fss.2006.01.014 10.1016/0165-0114(81)90002-6 10.1016/j.eswa.2011.09.057 10.1016/j.eswa.2010.11.086 10.1016/j.ijpe.2006.12.034 10.1016/j.ejor.2006.08.048 10.1016/S0360-8352(99)00164-3 10.1016/j.ins.2010.10.019 10.1016/j.cie.2008.02.008 10.1016/S0019-9958(65)90241-X 10.1016/j.jmsy.2012.11.005 10.1287/mnsc.17.4.B141 10.1016/j.apm.2012.10.017 10.1016/S0278-6125(97)88465-8 10.1016/j.cie.2006.02.008 10.1016/j.jmsy.2012.10.003 10.1016/S0925-5273(02)00329-8 10.1080/00207540903175046 10.1016/j.camwa.2010.03.060 10.1016/0165-0114(95)00277-4 10.1080/00207543.2011.588267 10.1016/j.eswa.2008.01.002 10.1016/j.ejor.2009.01.026 10.1016/j.mcm.2009.04.017 10.1016/S0377-2217(98)00108-8 10.1016/j.ijpe.2009.09.002 10.1016/j.ijpe.2007.10.020 10.1111/j.1937-5956.2006.tb00255.x 10.1016/S0377-2217(96)00019-7 10.1016/j.asoc.2010.10.014 10.1016/j.ijpe.2009.08.033 10.1016/S0167-9236(02)00068-4 10.1007/s11135-011-9460-y 10.1016/j.ijpe.2004.11.017 10.1016/j.ijpe.2010.09.033 10.1080/00207540500250507 10.1016/S0360-8352(02)00062-1 10.1016/0165-0114(78)90031-3 10.1016/j.cor.2005.03.006 10.1016/j.ejor.2010.06.015 10.1016/0165-0114(95)00360-6 10.1287/inte.30.3.125.11656 10.1016/j.eswa.2010.05.026 10.1016/j.apm.2012.01.029 10.1016/j.ijpe.2007.11.010 10.1016/S0278-6125(00)80003-5 10.1080/00207720601159381 10.1109/TSMCC.2012.2198056 |
| ContentType | Journal Article |
| Copyright | 2014 The Society of Manufacturing Engineers |
| Copyright_xml | – notice: 2014 The Society of Manufacturing Engineers |
| DBID | AAYXX CITATION |
| DOI | 10.1016/j.jmsy.2014.07.007 |
| DatabaseName | CrossRef |
| DatabaseTitle | CrossRef |
| DatabaseTitleList | |
| DeliveryMethod | fulltext_linktorsrc |
| Discipline | Engineering |
| EISSN | 1878-6642 |
| EndPage | 408 |
| ExternalDocumentID | 10_1016_j_jmsy_2014_07_007 S0278612514000879 |
| GroupedDBID | --K --M -~X .DC .~1 0R~ 1B1 1~. 1~5 29K 3EH 3V. 4.4 457 4G. 5GY 5VS 7-5 71M 7WY 883 88I 8AO 8FE 8FG 8FL 8FW 8G5 8P~ 8R4 8R5 9JN 9M8 AACTN AAEDT AAEDW AAIAV AAIKC AAIKJ AAKOC AALRI AAMNW AAOAW AAQFI AAQXK AAXUO ABFNM ABJCF ABJNI ABMAC ABUWG ABXDB ABYKQ ACDAQ ACGFO ACGFS ACGOD ACIWK ACNNM ACRLP ADBBV ADEZE ADMUD ADTZH AEBSH AECPX AEKER AENEX AFFNX AFKRA AFKWA AFTJW AGHFR AGUBO AGYEJ AHHHB AHJVU AIEXJ AIKHN AITUG AJBFU AJOXV ALMA_UNASSIGNED_HOLDINGS AMFUW AMRAJ ARAPS ASPBG AVWKF AXJTR AZFZN AZQEC BENPR BEZIV BGLVJ BJAXD BKOJK BKOMP BLXMC BPHCQ C1A CCPQU CS3 D-I DU5 DWQXO E3Z EBS EFJIC EFLBG EJD EP2 EP3 FDB FEDTE FGOYB FIRID FNPLU FRNLG FYGXN G-2 GBLVA GNUQQ GROUPED_ABI_INFORM_COMPLETE GROUPED_ABI_INFORM_RESEARCH GUQSH HCIFZ HVGLF HZ~ H~9 IHE J1W JJJVA K60 K6V K6~ K7- KOM L6V LY7 M0C M0F M0N M2O M2P M41 M7S MO0 MS~ N9A O-L O9- OAUVE OZT P-8 P-9 P2P P62 PC. PQBIZ PQQKQ PRG PROAC PTHSS Q2X Q38 R2- RIG ROL RPZ RWL S0X SDF SES SET SPC SPCBC SST SSZ T5K TAE TN5 U5U WH7 WUQ ZHY ~G- 9DU AATTM AAXKI AAYWO AAYXX ABWVN ACLOT ACRPL ACVFH ADCNI ADNMO AEIPS AEUPX AFFHD AFJKZ AFPUW AGQPQ AIGII AIIUN AKBMS AKRWK AKYEP ANKPU APXCP CITATION EFKBS PHGZM PHGZT PQBZA PQGLB ~HD |
| ID | FETCH-LOGICAL-c370t-5438e0bb8655e3d85d863dbb0a064b0a9f48980adce77cadf3a5bb0b4ec27ef33 |
| ISICitedReferencesCount | 34 |
| ISICitedReferencesURI | http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000367698100031&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| ISSN | 0278-6125 |
| IngestDate | Sat Nov 29 02:07:50 EST 2025 Tue Nov 18 21:10:19 EST 2025 Fri Feb 23 02:15:42 EST 2024 |
| IsPeerReviewed | true |
| IsScholarly | true |
| Keywords | Procurement/production planning Lot-sizing Recoverable remanufacturing systems Fuzzy multi-objective linear programming |
| Language | English |
| LinkModel | OpenURL |
| MergedId | FETCHMERGED-LOGICAL-c370t-5438e0bb8655e3d85d863dbb0a064b0a9f48980adce77cadf3a5bb0b4ec27ef33 |
| PageCount | 13 |
| ParticipantIDs | crossref_citationtrail_10_1016_j_jmsy_2014_07_007 crossref_primary_10_1016_j_jmsy_2014_07_007 elsevier_sciencedirect_doi_10_1016_j_jmsy_2014_07_007 |
| PublicationCentury | 2000 |
| PublicationDate | 2015-10-01 |
| PublicationDateYYYYMMDD | 2015-10-01 |
| PublicationDate_xml | – month: 10 year: 2015 text: 2015-10-01 day: 01 |
| PublicationDecade | 2010 |
| PublicationTitle | Journal of manufacturing systems |
| PublicationYear | 2015 |
| Publisher | Elsevier Ltd |
| Publisher_xml | – name: Elsevier Ltd |
| References | Jorjani, Leu, Scott (bib0160) 2004; 42 Koh, Hwang, Shon, Ko (bib0175) 2002; 43 Zimmermann (bib0355) 1978; 1 Cárdenas-Barrón, Treviño-Garza (bib0085) 2014; 38 Hannan (bib0145) 1981; 6 Kim, Song, Kim, Jeong (bib0170) 2006; 51 Zhang, Kuo, Lu (bib0345) 1997; 16 Teunter, Douwe, Flapper (bib0275) 2011; 210 Wu, Zhang, Wu, Olson (bib0305) 2010; 200 Pishvaee, Jolai, Razmi (bib0255) 2009; 28 Guide, Jayaraman, Srivastava (bib0135) 1999; 36 Wu, Guu (bib0310) 2001; 18 Behret, Korugan (bib0040) 2009; 56 Liang (bib0210) 2010; 37 Arikan (bib0020) 2013; 40 Torabi, Moghaddam (bib0280) 2012; 50 Cárdenas-Barrón, Treviño-Garza, Wee (bib0080) 2012; 39 Peidro, Mula, Alemany, Larío (bib0240) 2012; 50 Yu, Goh, Lin (bib0320) 2012; 219 Baykasoglu, Gocken (bib0035) 2010; 41 Zeng, Kang, Li, Zhang, Guo (bib0340) 2010; 98 Choi, Hwang, Koh (bib0105) 2007; 182 Liang, Huang, Yang (bib0205) 2012; 46 Bao, Tang, Ji (bib0030) 2008; 113 Lieckens, Vandaele (bib0235) 2007; 34 Cárdenas-Barrón, Teng, Treviño-Garza, Wee, Lou (bib0075) 2012; 136 Konstantaras, Skouri, Jaber (bib0180) 2010; 58 Bellman, Zadeh (bib0045) 1970; l7 Cárdenas-Barrón, Sarkar, Treviño-Garza (bib0070) 2013; 18 Chen, Chou (bib0095) 1996; 82 Guu, Wu (bib0140) 1997; 85 Feng, Viswanathan (bib0125) 2011; 133 Zadeh (bib0335) 1965; 8 Chang, Wen, Chen (bib0090) 1997; 99 Chung, Wee (bib0115) 2011; 129 Arikan, Güngö (bib0025) 2009; 50 Konstantaras, Skouri (bib0185) 2010; 203 Kiesmüller (bib0165) 2003; 81–82 Liang (bib0215) 2011; 181 Borges, Antunes (bib0055) 2002; 34 Laan, Salomon, Dekker (bib0190) 1999; 115 Piñeyro, Viera (bib0250) 2010; 124 Bhattacharya, Guide, Wassenhove (bib0050) 2006; 15 Rickli, Camelio (bib0260) 2013; 32 Li, Chen, Cai (bib0195) 2007; 105 Wang, Su, Chang (bib0295) 2013; 32 Cárdenas-Barrón, Sarkar, Treviño-Garza (bib0065) 2013; 37 Javadi, Saidi-Mehrabad, Haji, Mahdavi (bib0150) 2008; 345 Liang (bib0225) 2006; 157 Yu, Jin, Zhang (bib0325) 2000; 19 Yücel, Güneri (bib0330) 2011; 38 Liang (bib0230) 2008; 55 Ahiska, King (bib0005) 2010; 124 Cárdenas-Barrón, Porter (bib0060) 2013; 37 Díaz-Mdroñero, Peidro, Vansant (bib0120) 2010; 60 Tang, Grubbström, Zanoni (bib0265) 2007; 108 Chung, Wee (bib0110) 2008; 113 Peidro, Vasant (bib0245) 2011; 11 Guide, Jayaraman, Srivastava, Benton (bib0130) 2000; 30 Wang, Chen, Wang, Su (bib0290) 2010; 48 Liang, Cheng (bib0200) 2009; 36 Chen (bib0100) 2014; 33 Jayaraman (bib0155) 2006; 44 Tavakkoli-Moghaddam, Javadi, Jolai, Ghodratnama (bib0270) 2010; 10 Wang, Liang (bib0300) 2004; 46 Zhou, Wang (bib0350) 2008; 8 Ahiska, King (bib0010) 2010; 124 Yaghin, Torabi, Ghomi (bib0315) 2012; 36 Liang (bib0220) 2007; 38 Amin, Zhang (bib0015) 2012; 39 Tyagi, Yang, Tyagi, Verma (bib0285) 2012; 42 Peidro (10.1016/j.jmsy.2014.07.007_bib0245) 2011; 11 Bellman (10.1016/j.jmsy.2014.07.007_bib0045) 1970; l7 Yaghin (10.1016/j.jmsy.2014.07.007_bib0315) 2012; 36 Lieckens (10.1016/j.jmsy.2014.07.007_bib0235) 2007; 34 Ahiska (10.1016/j.jmsy.2014.07.007_bib0010) 2010; 124 Chen (10.1016/j.jmsy.2014.07.007_bib0100) 2014; 33 Cárdenas-Barrón (10.1016/j.jmsy.2014.07.007_bib0085) 2014; 38 Yu (10.1016/j.jmsy.2014.07.007_bib0325) 2000; 19 Guide (10.1016/j.jmsy.2014.07.007_bib0130) 2000; 30 Konstantaras (10.1016/j.jmsy.2014.07.007_bib0185) 2010; 203 Javadi (10.1016/j.jmsy.2014.07.007_bib0150) 2008; 345 Hannan (10.1016/j.jmsy.2014.07.007_bib0145) 1981; 6 Jayaraman (10.1016/j.jmsy.2014.07.007_bib0155) 2006; 44 Liang (10.1016/j.jmsy.2014.07.007_bib0230) 2008; 55 Rickli (10.1016/j.jmsy.2014.07.007_bib0260) 2013; 32 Wang (10.1016/j.jmsy.2014.07.007_bib0295) 2013; 32 Zeng (10.1016/j.jmsy.2014.07.007_bib0340) 2010; 98 Chen (10.1016/j.jmsy.2014.07.007_bib0095) 1996; 82 Zhang (10.1016/j.jmsy.2014.07.007_bib0345) 1997; 16 Chung (10.1016/j.jmsy.2014.07.007_bib0110) 2008; 113 Wu (10.1016/j.jmsy.2014.07.007_bib0305) 2010; 200 Cárdenas-Barrón (10.1016/j.jmsy.2014.07.007_bib0075) 2012; 136 Arikan (10.1016/j.jmsy.2014.07.007_bib0020) 2013; 40 Bhattacharya (10.1016/j.jmsy.2014.07.007_bib0050) 2006; 15 Tavakkoli-Moghaddam (10.1016/j.jmsy.2014.07.007_bib0270) 2010; 10 Choi (10.1016/j.jmsy.2014.07.007_bib0105) 2007; 182 Tyagi (10.1016/j.jmsy.2014.07.007_bib0285) 2012; 42 Liang (10.1016/j.jmsy.2014.07.007_bib0215) 2011; 181 Yücel (10.1016/j.jmsy.2014.07.007_bib0330) 2011; 38 Liang (10.1016/j.jmsy.2014.07.007_bib0220) 2007; 38 Baykasoglu (10.1016/j.jmsy.2014.07.007_bib0035) 2010; 41 Koh (10.1016/j.jmsy.2014.07.007_bib0175) 2002; 43 Teunter (10.1016/j.jmsy.2014.07.007_bib0275) 2011; 210 Borges (10.1016/j.jmsy.2014.07.007_bib0055) 2002; 34 Konstantaras (10.1016/j.jmsy.2014.07.007_bib0180) 2010; 58 Cárdenas-Barrón (10.1016/j.jmsy.2014.07.007_bib0065) 2013; 37 Piñeyro (10.1016/j.jmsy.2014.07.007_bib0250) 2010; 124 Guu (10.1016/j.jmsy.2014.07.007_bib0140) 1997; 85 Wu (10.1016/j.jmsy.2014.07.007_bib0310) 2001; 18 Bao (10.1016/j.jmsy.2014.07.007_bib0030) 2008; 113 Liang (10.1016/j.jmsy.2014.07.007_bib0200) 2009; 36 Li (10.1016/j.jmsy.2014.07.007_bib0195) 2007; 105 Kim (10.1016/j.jmsy.2014.07.007_bib0170) 2006; 51 Feng (10.1016/j.jmsy.2014.07.007_bib0125) 2011; 133 Chang (10.1016/j.jmsy.2014.07.007_bib0090) 1997; 99 Pishvaee (10.1016/j.jmsy.2014.07.007_bib0255) 2009; 28 Zhou (10.1016/j.jmsy.2014.07.007_bib0350) 2008; 8 Arikan (10.1016/j.jmsy.2014.07.007_bib0025) 2009; 50 Amin (10.1016/j.jmsy.2014.07.007_bib0015) 2012; 39 Cárdenas-Barrón (10.1016/j.jmsy.2014.07.007_bib0070) 2013; 18 Cárdenas-Barrón (10.1016/j.jmsy.2014.07.007_bib0080) 2012; 39 Torabi (10.1016/j.jmsy.2014.07.007_bib0280) 2012; 50 Liang (10.1016/j.jmsy.2014.07.007_bib0210) 2010; 37 Jorjani (10.1016/j.jmsy.2014.07.007_bib0160) 2004; 42 Ahiska (10.1016/j.jmsy.2014.07.007_bib0005) 2010; 124 Peidro (10.1016/j.jmsy.2014.07.007_bib0240) 2012; 50 Cárdenas-Barrón (10.1016/j.jmsy.2014.07.007_bib0060) 2013; 37 Kiesmüller (10.1016/j.jmsy.2014.07.007_bib0165) 2003; 81–82 Yu (10.1016/j.jmsy.2014.07.007_bib0320) 2012; 219 Wang (10.1016/j.jmsy.2014.07.007_bib0300) 2004; 46 Laan (10.1016/j.jmsy.2014.07.007_bib0190) 1999; 115 Guide (10.1016/j.jmsy.2014.07.007_bib0135) 1999; 36 Wang (10.1016/j.jmsy.2014.07.007_bib0290) 2010; 48 Chung (10.1016/j.jmsy.2014.07.007_bib0115) 2011; 129 Zadeh (10.1016/j.jmsy.2014.07.007_bib0335) 1965; 8 Zimmermann (10.1016/j.jmsy.2014.07.007_bib0355) 1978; 1 Liang (10.1016/j.jmsy.2014.07.007_bib0205) 2012; 46 Liang (10.1016/j.jmsy.2014.07.007_bib0225) 2006; 157 Tang (10.1016/j.jmsy.2014.07.007_bib0265) 2007; 108 Behret (10.1016/j.jmsy.2014.07.007_bib0040) 2009; 56 Díaz-Mdroñero (10.1016/j.jmsy.2014.07.007_bib0120) 2010; 60 |
| References_xml | – volume: 81–82 start-page: 333 year: 2003 end-page: 340 ident: bib0165 article-title: Optimal control of a one product recovery system with lead times publication-title: Int J Prod Econ – volume: 39 start-page: 3888 year: 2012 end-page: 3895 ident: bib0080 article-title: A simple and better algorithm to solve the vendor managed inventory control system of multi-product multi-constraint economic order quantity model publication-title: Exp Syst Appl – volume: 19 start-page: 94 year: 2000 end-page: 107 ident: bib0325 article-title: A decision-making model for materials management of end-of-life electronic products publication-title: J Manuf Syst – volume: 58 start-page: 452 year: 2010 end-page: 462 ident: bib0180 article-title: Lot sizing for a recoverable product with inspection and sorting publication-title: Comput Ind Eng – volume: 113 start-page: 528 year: 2008 end-page: 545 ident: bib0110 article-title: Green-component life-cycle value on design and reverse manufacturing in semi-closed chain publication-title: Int J Prod Econ – volume: 28 start-page: 107 year: 2009 end-page: 114 ident: bib0255 article-title: A stochastic optimization model for integrated forward/reverse logistics network design publication-title: J Manuf Syst – volume: 210 start-page: 241 year: 2011 end-page: 248 ident: bib0275 article-title: Optimal core acquisition and remanufacturing policies under uncertain core quality fractions publication-title: Eur J Oper Res – volume: 50 start-page: 1726 year: 2012 end-page: 1748 ident: bib0280 article-title: Applying a mathematical programming approach for a green product mix decision publication-title: Int J Prod Res – volume: 32 start-page: 206 year: 2013 end-page: 219 ident: bib0295 article-title: Comparative study of the applicability of fuzzy multi-objective linear programming models through cost-effective analysis for mold manufacturing publication-title: J Manuf Syst – volume: 124 start-page: 11 year: 2010 end-page: 19 ident: bib0005 article-title: Inventory optimization in a one product recoverable manufacturing system publication-title: Int J Prod Econ – volume: 99 start-page: 289 year: 1997 end-page: 302 ident: bib0090 article-title: A fuzzy multi-objective programming approach for optimal management of the reservoir watershed publication-title: Eur J Oper Res – volume: 157 start-page: 1303 year: 2006 end-page: 1316 ident: bib0225 article-title: Distribution planning decisions using interactive fuzzy Multi-objective linear programming publication-title: Fuzzy Sets Syst – volume: 6 start-page: 235 year: 1981 end-page: 248 ident: bib0145 article-title: Linear programming with multiple fuzzy goals publication-title: Fuzzy Sets Syst – volume: 30 start-page: 125 year: 2000 end-page: 142 ident: bib0130 article-title: Supply-chain management for recoverable manufacturing systems publication-title: Interfaces – volume: 8 start-page: 38 year: 1965 end-page: 53 ident: bib0335 article-title: Fuzzy set publication-title: Inform Control – volume: 48 start-page: 501 year: 2010 end-page: 523 ident: bib0290 article-title: Analysis of outsourcing cost-effectiveness using a linear programming model with fuzzy multiple goals publication-title: Int J Prod Res – volume: 345 start-page: 452 year: 2008 end-page: 467 ident: bib0150 article-title: No-wait flow shop scheduling using fuzzy multi-objective linear programming publication-title: J Franklin Inst – volume: 46 start-page: 1451 year: 2012 end-page: 1470 ident: bib0205 article-title: Application of fuzzy mathematical programming to imprecise project management decisions publication-title: Qual Quant – volume: 43 start-page: 59 year: 2002 end-page: 73 ident: bib0175 article-title: An optimal ordering and recovery policy for reusable items publication-title: Comput Ind Eng – volume: 105 start-page: 301 year: 2007 end-page: 317 ident: bib0195 article-title: Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing publication-title: Int J Prod Econ – volume: 16 start-page: 352 year: 1997 end-page: 371 ident: bib0345 article-title: Environmentally conscious design and manufacturing: a state-of-the-art survey publication-title: J Manuf Syst – volume: 36 start-page: 759 year: 1999 end-page: 779 ident: bib0135 article-title: The effect of lead time variation on the performance of disassembly release mechanisms publication-title: Comput Ind Eng – volume: 41 start-page: 1124 year: 2010 end-page: 1131 ident: bib0035 article-title: Multi-objective aggregate production planning with fuzzy parameters publication-title: Adv Eng Softw – volume: 113 start-page: 969 year: 2008 end-page: 979 ident: bib0030 article-title: Applying the minimum relative entropy method for bimodal distribution in a remanufacturing system publication-title: Int J Prod Econ – volume: 46 start-page: 17 year: 2004 end-page: 41 ident: bib0300 article-title: Application of fuzzy multi-objective linear programming to aggregate production planning publication-title: Comput Ind Eng – volume: 18 start-page: 132 year: 2013 end-page: 138 ident: bib0070 article-title: Easy and improved algorithms to joint determination of the replenishment lot size and number of shipments for an EPQ model with rework publication-title: Math Comput Appl – volume: 40 start-page: 947 year: 2013 end-page: 952 ident: bib0020 article-title: A fuzzy solution approach for multi objective supplier selection publication-title: Exp Syst Appl – volume: 8 start-page: 71 year: 2008 end-page: 78 ident: bib0350 article-title: Generic model of reverse logistics network design publication-title: J Transp Syst Eng Inform Technol – volume: 129 start-page: 195 year: 2011 end-page: 203 ident: bib0115 article-title: Short life-cycle deteriorating product remanufacturing in a green supply chain inventory control system publication-title: Int J Prod Econ – volume: 37 start-page: 7883 year: 2013 end-page: 7887 ident: bib0060 article-title: Supply chain models for an assembly system with preprocessing of raw materials: a simple and better algorithm publication-title: Appl Math Model – volume: 182 start-page: 764 year: 2007 end-page: 774 ident: bib0105 article-title: A generalized ordering and recovery policy for reusable items publication-title: Eur J Oper Res – volume: 200 start-page: 774 year: 2010 end-page: 787 ident: bib0305 article-title: Fuzzy multi-objective programming for supplier selection and risk modeling: a possibility approach publication-title: Eur J Oper Res – volume: 36 start-page: 3367 year: 2009 end-page: 3377 ident: bib0200 article-title: Application of fuzzy sets to manufacturing/distribution planning decisions with multi-product and multi-time period in supply chains publication-title: Exp Syst Appl – volume: 82 start-page: 35 year: 1996 end-page: 38 ident: bib0095 article-title: Solving multiobjective linear programming problems – a generic approach publication-title: Fuzzy Sets Syst – volume: 37 start-page: 8499 year: 2010 end-page: 8507 ident: bib0210 article-title: Application of fuzzy goal to project management decisions with multiple goals in uncertain environments publication-title: Exp Syst Appl – volume: 38 start-page: 293 year: 2007 end-page: 304 ident: bib0220 article-title: Applying fuzzy goal programming to production/transportation planning decisions in a supply chain publication-title: Int J Syst Sci – volume: 36 start-page: 6011 year: 2012 end-page: 6030 ident: bib0315 article-title: Integrated markdown pricing and aggregate production planning in a two echelon supply chain: a hybrid fuzzy multiple objective approach publication-title: Appl Math Model – volume: 98 start-page: 134 year: 2010 end-page: 142 ident: bib0340 article-title: Fuzzy multi-objective linear programming applying to crop area planning publication-title: Agric Water Manag – volume: 10 start-page: 919 year: 2010 end-page: 925 ident: bib0270 article-title: The use of a fuzzy multi objective linear programming for solving a multi-objective single-machine scheduling problem publication-title: Appl Soft Comput – volume: 38 start-page: 6281 year: 2011 end-page: 6286 ident: bib0330 article-title: A weighted additive fuzzy programming approach for multi-criteria supplier selection publication-title: Exp Syst Appl – volume: 85 start-page: 45 year: 1997 end-page: 48 ident: bib0140 article-title: Weighted coefficients in two-phase approach for solving the multiple objective programming problems publication-title: Fuzzy Sets Syst – volume: 34 start-page: 395 year: 2007 end-page: 416 ident: bib0235 article-title: Reverse logistics network design with stochastic lead times publication-title: Comput Oper Res – volume: 42 start-page: 1131 year: 2004 end-page: 1145 ident: bib0160 article-title: Model for the allocation of electronics components to reuse options publication-title: Int J Prod Res – volume: 136 start-page: 384 year: 2012 end-page: 388 ident: bib0075 article-title: An improved algorithm and solution on an integrated production-inventory model in a three-layer supply chain publication-title: Int J Prod Econ – volume: 203 start-page: 326 year: 2010 end-page: 335 ident: bib0185 article-title: Lot sizing for a single product with variable setup numbers publication-title: Eur J Oper Res – volume: 15 start-page: 421 year: 2006 end-page: 431 ident: bib0050 article-title: Optimal order quantities with remanufacturing across new product generations publication-title: Prod Oper Manag – volume: 33 start-page: 166 year: 2014 end-page: 176 ident: bib0100 article-title: Dynamic co-opetitive approach of a closed loop system with remanufacturing for deteriorating items in e-markets publication-title: J Manuf Syst – volume: 50 start-page: 407 year: 2009 end-page: 420 ident: bib0025 article-title: Modeling of a manufacturing cell design problem with fuzzy multi-objective parametric programming publication-title: Math Comput Model – volume: 38 start-page: 1918 year: 2014 end-page: 1991 ident: bib0085 article-title: An optimal solution to a three echelon supply chain network with multi-product and multi-period publication-title: Appl Math Model – volume: 44 start-page: 981 year: 2006 end-page: 998 ident: bib0155 article-title: Production planning for closed-loop supply chains with product recovery and reuse: an analytical approach publication-title: Int J Prod Res – volume: 11 start-page: 2656 year: 2011 end-page: 2663 ident: bib0245 article-title: Transportation planning with modified S-curve membership functions using an interactive fuzzy multi-objective approach publication-title: Appl Soft Comput – volume: 108 start-page: 426 year: 2007 end-page: 435 ident: bib0265 article-title: Planned lead time determination in a make-to-order remanufacturing system publication-title: Int J Prod Econ – volume: 124 start-page: 51 year: 2010 end-page: 61 ident: bib0010 article-title: Life cycle inventory policy characterizations for a single-product recoverable system publication-title: Int J Prod Econ – volume: 34 start-page: 427 year: 2002 end-page: 443 ident: bib0055 article-title: A weight space-based approach to fuzzy multiple-objective linear programming publication-title: Decis Support Syst – volume: l7 start-page: 141 year: 1970 end-page: 164 ident: bib0045 article-title: Decision-making in a fuzzy environment publication-title: Manage Sci – volume: 124 start-page: 482 year: 2010 end-page: 488 ident: bib0250 article-title: The economic lot-sizing problem with remanufacturing and one-way substitution publication-title: Int J Prod Econ – volume: 181 start-page: 842 year: 2011 end-page: 854 ident: bib0215 article-title: Application of fuzzy sets to manufacturing/distribution planning decisions in supply chains publication-title: Inform Sci – volume: 42 start-page: 1519 year: 2012 end-page: 1530 ident: bib0285 article-title: A fuzzy goal programming approach for optimal product family design of mobile phones and multiple-platform architecture publication-title: IEEE Trans Syst Man Cybern – Part C: Appl Rev – volume: 133 start-page: 432 year: 2011 end-page: 438 ident: bib0125 article-title: A new lot-sizing heuristic for manufacturing systems with product recovery publication-title: Int J Prod Econ – volume: 50 start-page: 3011 year: 2012 end-page: 3020 ident: bib0240 article-title: Fuzzy multi-objective optimisation for master planning in a ceramic supply chain publication-title: Int J Prod Res – volume: 55 start-page: 676 year: 2008 end-page: 694 ident: bib0230 article-title: Fuzzy multi-objective production/distribution planning decisions with multi-product and multi-time period in a supply chain publication-title: Comput Ind Eng – volume: 37 start-page: 5549 year: 2013 end-page: 5554 ident: bib0065 article-title: An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments publication-title: Appl Math Model – volume: 51 start-page: 279 year: 2006 end-page: 287 ident: bib0170 article-title: Supply planning model for remanufacturing system in reverse logistics environment publication-title: Comput Ind Eng – volume: 32 start-page: 281 year: 2013 end-page: 293 ident: bib0260 article-title: Multi-objective partial disassembly optimization based on sequence feasibility publication-title: J Manuf Syst – volume: 18 start-page: 87 year: 2001 end-page: 93 ident: bib0310 article-title: A compromise model for solving fuzzy multiple objective linear programming problems publication-title: J Chin Inst Ind Eng – volume: 60 start-page: 1038 year: 2010 end-page: 1048 ident: bib0120 article-title: Vendor selection problem by using an interactive fuzzy multi-objective approach with modified S-cure membership functions publication-title: Comput Math Appl – volume: 115 start-page: 195 year: 1999 end-page: 214 ident: bib0190 article-title: An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control publication-title: Eur J Oper Res – volume: 219 start-page: 305 year: 2012 end-page: 311 ident: bib0320 article-title: Fuzzy multi-objective vendor selection under lean procurement publication-title: Eur J Oper Res – volume: 39 start-page: 6782 year: 2012 end-page: 6791 ident: bib0015 article-title: An integrated model for closed-loop supply chain configuration and supplier selection: multi-objective approach publication-title: Exp Syst Appl – volume: 1 start-page: 45 year: 1978 end-page: 55 ident: bib0355 article-title: Fuzzy programming and linear programming with several objective functions publication-title: Fuzzy Sets Syst – volume: 56 start-page: 507 year: 2009 end-page: 520 ident: bib0040 article-title: Performance analysis of a hybrid system under quality impact of returns publication-title: Comput Ind Eng – volume: 124 start-page: 482 year: 2010 ident: 10.1016/j.jmsy.2014.07.007_bib0250 article-title: The economic lot-sizing problem with remanufacturing and one-way substitution publication-title: Int J Prod Econ doi: 10.1016/j.ijpe.2010.01.007 – volume: 219 start-page: 305 year: 2012 ident: 10.1016/j.jmsy.2014.07.007_bib0320 article-title: Fuzzy multi-objective vendor selection under lean procurement publication-title: Eur J Oper Res doi: 10.1016/j.ejor.2011.12.028 – volume: 40 start-page: 947 year: 2013 ident: 10.1016/j.jmsy.2014.07.007_bib0020 article-title: A fuzzy solution approach for multi objective supplier selection publication-title: Exp Syst Appl doi: 10.1016/j.eswa.2012.05.051 – volume: 41 start-page: 1124 year: 2010 ident: 10.1016/j.jmsy.2014.07.007_bib0035 article-title: Multi-objective aggregate production planning with fuzzy parameters publication-title: Adv Eng Softw doi: 10.1016/j.advengsoft.2010.07.002 – volume: 10 start-page: 919 year: 2010 ident: 10.1016/j.jmsy.2014.07.007_bib0270 article-title: The use of a fuzzy multi objective linear programming for solving a multi-objective single-machine scheduling problem publication-title: Appl Soft Comput doi: 10.1016/j.asoc.2009.10.010 – volume: 58 start-page: 452 year: 2010 ident: 10.1016/j.jmsy.2014.07.007_bib0180 article-title: Lot sizing for a recoverable product with inspection and sorting publication-title: Comput Ind Eng doi: 10.1016/j.cie.2009.11.004 – volume: 50 start-page: 1726 year: 2012 ident: 10.1016/j.jmsy.2014.07.007_bib0280 article-title: Applying a mathematical programming approach for a green product mix decision publication-title: Int J Prod Res doi: 10.1080/00207543.2011.560907 – volume: 42 start-page: 1131 year: 2004 ident: 10.1016/j.jmsy.2014.07.007_bib0160 article-title: Model for the allocation of electronics components to reuse options publication-title: Int J Prod Res doi: 10.1080/00207540310001632466 – volume: 98 start-page: 134 issue: 1 year: 2010 ident: 10.1016/j.jmsy.2014.07.007_bib0340 article-title: Fuzzy multi-objective linear programming applying to crop area planning publication-title: Agric Water Manag doi: 10.1016/j.agwat.2010.08.010 – volume: 33 start-page: 166 issue: 1 year: 2014 ident: 10.1016/j.jmsy.2014.07.007_bib0100 article-title: Dynamic co-opetitive approach of a closed loop system with remanufacturing for deteriorating items in e-markets publication-title: J Manuf Syst doi: 10.1016/j.jmsy.2013.11.002 – volume: 345 start-page: 452 year: 2008 ident: 10.1016/j.jmsy.2014.07.007_bib0150 article-title: No-wait flow shop scheduling using fuzzy multi-objective linear programming publication-title: J Franklin Inst doi: 10.1016/j.jfranklin.2007.12.003 – volume: 46 start-page: 17 year: 2004 ident: 10.1016/j.jmsy.2014.07.007_bib0300 article-title: Application of fuzzy multi-objective linear programming to aggregate production planning publication-title: Comput Ind Eng doi: 10.1016/j.cie.2003.09.009 – volume: 133 start-page: 432 year: 2011 ident: 10.1016/j.jmsy.2014.07.007_bib0125 article-title: A new lot-sizing heuristic for manufacturing systems with product recovery publication-title: Int J Prod Econ doi: 10.1016/j.ijpe.2010.04.018 – volume: 56 start-page: 507 year: 2009 ident: 10.1016/j.jmsy.2014.07.007_bib0040 article-title: Performance analysis of a hybrid system under quality impact of returns publication-title: Comput Ind Eng doi: 10.1016/j.cie.2007.11.001 – volume: 39 start-page: 6782 year: 2012 ident: 10.1016/j.jmsy.2014.07.007_bib0015 article-title: An integrated model for closed-loop supply chain configuration and supplier selection: multi-objective approach publication-title: Exp Syst Appl doi: 10.1016/j.eswa.2011.12.056 – volume: 37 start-page: 7883 issue: 14–15 year: 2013 ident: 10.1016/j.jmsy.2014.07.007_bib0060 article-title: Supply chain models for an assembly system with preprocessing of raw materials: a simple and better algorithm publication-title: Appl Math Model doi: 10.1016/j.apm.2013.03.006 – volume: 136 start-page: 384 issue: 2 year: 2012 ident: 10.1016/j.jmsy.2014.07.007_bib0075 article-title: An improved algorithm and solution on an integrated production-inventory model in a three-layer supply chain publication-title: Int J Prod Econ doi: 10.1016/j.ijpe.2011.12.013 – volume: 28 start-page: 107 issue: 4 year: 2009 ident: 10.1016/j.jmsy.2014.07.007_bib0255 article-title: A stochastic optimization model for integrated forward/reverse logistics network design publication-title: J Manuf Syst doi: 10.1016/j.jmsy.2010.05.001 – volume: 203 start-page: 326 year: 2010 ident: 10.1016/j.jmsy.2014.07.007_bib0185 article-title: Lot sizing for a single product with variable setup numbers publication-title: Eur J Oper Res doi: 10.1016/j.ejor.2009.07.018 – volume: 157 start-page: 1303 year: 2006 ident: 10.1016/j.jmsy.2014.07.007_bib0225 article-title: Distribution planning decisions using interactive fuzzy Multi-objective linear programming publication-title: Fuzzy Sets Syst doi: 10.1016/j.fss.2006.01.014 – volume: 6 start-page: 235 year: 1981 ident: 10.1016/j.jmsy.2014.07.007_bib0145 article-title: Linear programming with multiple fuzzy goals publication-title: Fuzzy Sets Syst doi: 10.1016/0165-0114(81)90002-6 – volume: 39 start-page: 3888 issue: 3 year: 2012 ident: 10.1016/j.jmsy.2014.07.007_bib0080 article-title: A simple and better algorithm to solve the vendor managed inventory control system of multi-product multi-constraint economic order quantity model publication-title: Exp Syst Appl doi: 10.1016/j.eswa.2011.09.057 – volume: 18 start-page: 87 year: 2001 ident: 10.1016/j.jmsy.2014.07.007_bib0310 article-title: A compromise model for solving fuzzy multiple objective linear programming problems publication-title: J Chin Inst Ind Eng – volume: 38 start-page: 6281 year: 2011 ident: 10.1016/j.jmsy.2014.07.007_bib0330 article-title: A weighted additive fuzzy programming approach for multi-criteria supplier selection publication-title: Exp Syst Appl doi: 10.1016/j.eswa.2010.11.086 – volume: 108 start-page: 426 year: 2007 ident: 10.1016/j.jmsy.2014.07.007_bib0265 article-title: Planned lead time determination in a make-to-order remanufacturing system publication-title: Int J Prod Econ doi: 10.1016/j.ijpe.2006.12.034 – volume: 182 start-page: 764 year: 2007 ident: 10.1016/j.jmsy.2014.07.007_bib0105 article-title: A generalized ordering and recovery policy for reusable items publication-title: Eur J Oper Res doi: 10.1016/j.ejor.2006.08.048 – volume: 36 start-page: 759 year: 1999 ident: 10.1016/j.jmsy.2014.07.007_bib0135 article-title: The effect of lead time variation on the performance of disassembly release mechanisms publication-title: Comput Ind Eng doi: 10.1016/S0360-8352(99)00164-3 – volume: 181 start-page: 842 year: 2011 ident: 10.1016/j.jmsy.2014.07.007_bib0215 article-title: Application of fuzzy sets to manufacturing/distribution planning decisions in supply chains publication-title: Inform Sci doi: 10.1016/j.ins.2010.10.019 – volume: 55 start-page: 676 year: 2008 ident: 10.1016/j.jmsy.2014.07.007_bib0230 article-title: Fuzzy multi-objective production/distribution planning decisions with multi-product and multi-time period in a supply chain publication-title: Comput Ind Eng doi: 10.1016/j.cie.2008.02.008 – volume: 8 start-page: 38 year: 1965 ident: 10.1016/j.jmsy.2014.07.007_bib0335 article-title: Fuzzy set publication-title: Inform Control doi: 10.1016/S0019-9958(65)90241-X – volume: 18 start-page: 132 issue: 2 year: 2013 ident: 10.1016/j.jmsy.2014.07.007_bib0070 article-title: Easy and improved algorithms to joint determination of the replenishment lot size and number of shipments for an EPQ model with rework publication-title: Math Comput Appl – volume: 32 start-page: 281 issue: 1 year: 2013 ident: 10.1016/j.jmsy.2014.07.007_bib0260 article-title: Multi-objective partial disassembly optimization based on sequence feasibility publication-title: J Manuf Syst doi: 10.1016/j.jmsy.2012.11.005 – volume: l7 start-page: 141 year: 1970 ident: 10.1016/j.jmsy.2014.07.007_bib0045 article-title: Decision-making in a fuzzy environment publication-title: Manage Sci doi: 10.1287/mnsc.17.4.B141 – volume: 37 start-page: 5549 issue: 7 year: 2013 ident: 10.1016/j.jmsy.2014.07.007_bib0065 article-title: An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments publication-title: Appl Math Model doi: 10.1016/j.apm.2012.10.017 – volume: 16 start-page: 352 issue: 5 year: 1997 ident: 10.1016/j.jmsy.2014.07.007_bib0345 article-title: Environmentally conscious design and manufacturing: a state-of-the-art survey publication-title: J Manuf Syst doi: 10.1016/S0278-6125(97)88465-8 – volume: 51 start-page: 279 year: 2006 ident: 10.1016/j.jmsy.2014.07.007_bib0170 article-title: Supply planning model for remanufacturing system in reverse logistics environment publication-title: Comput Ind Eng doi: 10.1016/j.cie.2006.02.008 – volume: 32 start-page: 206 issue: 1 year: 2013 ident: 10.1016/j.jmsy.2014.07.007_bib0295 article-title: Comparative study of the applicability of fuzzy multi-objective linear programming models through cost-effective analysis for mold manufacturing publication-title: J Manuf Syst doi: 10.1016/j.jmsy.2012.10.003 – volume: 81–82 start-page: 333 year: 2003 ident: 10.1016/j.jmsy.2014.07.007_bib0165 article-title: Optimal control of a one product recovery system with lead times publication-title: Int J Prod Econ doi: 10.1016/S0925-5273(02)00329-8 – volume: 48 start-page: 501 year: 2010 ident: 10.1016/j.jmsy.2014.07.007_bib0290 article-title: Analysis of outsourcing cost-effectiveness using a linear programming model with fuzzy multiple goals publication-title: Int J Prod Res doi: 10.1080/00207540903175046 – volume: 60 start-page: 1038 year: 2010 ident: 10.1016/j.jmsy.2014.07.007_bib0120 article-title: Vendor selection problem by using an interactive fuzzy multi-objective approach with modified S-cure membership functions publication-title: Comput Math Appl doi: 10.1016/j.camwa.2010.03.060 – volume: 82 start-page: 35 year: 1996 ident: 10.1016/j.jmsy.2014.07.007_bib0095 article-title: Solving multiobjective linear programming problems – a generic approach publication-title: Fuzzy Sets Syst doi: 10.1016/0165-0114(95)00277-4 – volume: 50 start-page: 3011 year: 2012 ident: 10.1016/j.jmsy.2014.07.007_bib0240 article-title: Fuzzy multi-objective optimisation for master planning in a ceramic supply chain publication-title: Int J Prod Res doi: 10.1080/00207543.2011.588267 – volume: 36 start-page: 3367 year: 2009 ident: 10.1016/j.jmsy.2014.07.007_bib0200 article-title: Application of fuzzy sets to manufacturing/distribution planning decisions with multi-product and multi-time period in supply chains publication-title: Exp Syst Appl doi: 10.1016/j.eswa.2008.01.002 – volume: 200 start-page: 774 year: 2010 ident: 10.1016/j.jmsy.2014.07.007_bib0305 article-title: Fuzzy multi-objective programming for supplier selection and risk modeling: a possibility approach publication-title: Eur J Oper Res doi: 10.1016/j.ejor.2009.01.026 – volume: 50 start-page: 407 year: 2009 ident: 10.1016/j.jmsy.2014.07.007_bib0025 article-title: Modeling of a manufacturing cell design problem with fuzzy multi-objective parametric programming publication-title: Math Comput Model doi: 10.1016/j.mcm.2009.04.017 – volume: 115 start-page: 195 year: 1999 ident: 10.1016/j.jmsy.2014.07.007_bib0190 article-title: An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control publication-title: Eur J Oper Res doi: 10.1016/S0377-2217(98)00108-8 – volume: 124 start-page: 11 year: 2010 ident: 10.1016/j.jmsy.2014.07.007_bib0005 article-title: Inventory optimization in a one product recoverable manufacturing system publication-title: Int J Prod Econ doi: 10.1016/j.ijpe.2009.09.002 – volume: 113 start-page: 528 year: 2008 ident: 10.1016/j.jmsy.2014.07.007_bib0110 article-title: Green-component life-cycle value on design and reverse manufacturing in semi-closed chain publication-title: Int J Prod Econ doi: 10.1016/j.ijpe.2007.10.020 – volume: 38 start-page: 1918 issue: 5–6 year: 2014 ident: 10.1016/j.jmsy.2014.07.007_bib0085 article-title: An optimal solution to a three echelon supply chain network with multi-product and multi-period publication-title: Appl Math Model – volume: 15 start-page: 421 year: 2006 ident: 10.1016/j.jmsy.2014.07.007_bib0050 article-title: Optimal order quantities with remanufacturing across new product generations publication-title: Prod Oper Manag doi: 10.1111/j.1937-5956.2006.tb00255.x – volume: 99 start-page: 289 year: 1997 ident: 10.1016/j.jmsy.2014.07.007_bib0090 article-title: A fuzzy multi-objective programming approach for optimal management of the reservoir watershed publication-title: Eur J Oper Res doi: 10.1016/S0377-2217(96)00019-7 – volume: 11 start-page: 2656 year: 2011 ident: 10.1016/j.jmsy.2014.07.007_bib0245 article-title: Transportation planning with modified S-curve membership functions using an interactive fuzzy multi-objective approach publication-title: Appl Soft Comput doi: 10.1016/j.asoc.2010.10.014 – volume: 124 start-page: 51 year: 2010 ident: 10.1016/j.jmsy.2014.07.007_bib0010 article-title: Life cycle inventory policy characterizations for a single-product recoverable system publication-title: Int J Prod Econ doi: 10.1016/j.ijpe.2009.08.033 – volume: 34 start-page: 427 year: 2002 ident: 10.1016/j.jmsy.2014.07.007_bib0055 article-title: A weight space-based approach to fuzzy multiple-objective linear programming publication-title: Decis Support Syst doi: 10.1016/S0167-9236(02)00068-4 – volume: 46 start-page: 1451 year: 2012 ident: 10.1016/j.jmsy.2014.07.007_bib0205 article-title: Application of fuzzy mathematical programming to imprecise project management decisions publication-title: Qual Quant doi: 10.1007/s11135-011-9460-y – volume: 105 start-page: 301 year: 2007 ident: 10.1016/j.jmsy.2014.07.007_bib0195 article-title: Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing publication-title: Int J Prod Econ doi: 10.1016/j.ijpe.2004.11.017 – volume: 129 start-page: 195 year: 2011 ident: 10.1016/j.jmsy.2014.07.007_bib0115 article-title: Short life-cycle deteriorating product remanufacturing in a green supply chain inventory control system publication-title: Int J Prod Econ doi: 10.1016/j.ijpe.2010.09.033 – volume: 8 start-page: 71 year: 2008 ident: 10.1016/j.jmsy.2014.07.007_bib0350 article-title: Generic model of reverse logistics network design publication-title: J Transp Syst Eng Inform Technol – volume: 44 start-page: 981 year: 2006 ident: 10.1016/j.jmsy.2014.07.007_bib0155 article-title: Production planning for closed-loop supply chains with product recovery and reuse: an analytical approach publication-title: Int J Prod Res doi: 10.1080/00207540500250507 – volume: 43 start-page: 59 year: 2002 ident: 10.1016/j.jmsy.2014.07.007_bib0175 article-title: An optimal ordering and recovery policy for reusable items publication-title: Comput Ind Eng doi: 10.1016/S0360-8352(02)00062-1 – volume: 1 start-page: 45 year: 1978 ident: 10.1016/j.jmsy.2014.07.007_bib0355 article-title: Fuzzy programming and linear programming with several objective functions publication-title: Fuzzy Sets Syst doi: 10.1016/0165-0114(78)90031-3 – volume: 34 start-page: 395 year: 2007 ident: 10.1016/j.jmsy.2014.07.007_bib0235 article-title: Reverse logistics network design with stochastic lead times publication-title: Comput Oper Res doi: 10.1016/j.cor.2005.03.006 – volume: 210 start-page: 241 year: 2011 ident: 10.1016/j.jmsy.2014.07.007_bib0275 article-title: Optimal core acquisition and remanufacturing policies under uncertain core quality fractions publication-title: Eur J Oper Res doi: 10.1016/j.ejor.2010.06.015 – volume: 85 start-page: 45 year: 1997 ident: 10.1016/j.jmsy.2014.07.007_bib0140 article-title: Weighted coefficients in two-phase approach for solving the multiple objective programming problems publication-title: Fuzzy Sets Syst doi: 10.1016/0165-0114(95)00360-6 – volume: 30 start-page: 125 year: 2000 ident: 10.1016/j.jmsy.2014.07.007_bib0130 article-title: Supply-chain management for recoverable manufacturing systems publication-title: Interfaces doi: 10.1287/inte.30.3.125.11656 – volume: 37 start-page: 8499 year: 2010 ident: 10.1016/j.jmsy.2014.07.007_bib0210 article-title: Application of fuzzy goal to project management decisions with multiple goals in uncertain environments publication-title: Exp Syst Appl doi: 10.1016/j.eswa.2010.05.026 – volume: 36 start-page: 6011 year: 2012 ident: 10.1016/j.jmsy.2014.07.007_bib0315 article-title: Integrated markdown pricing and aggregate production planning in a two echelon supply chain: a hybrid fuzzy multiple objective approach publication-title: Appl Math Model doi: 10.1016/j.apm.2012.01.029 – volume: 113 start-page: 969 year: 2008 ident: 10.1016/j.jmsy.2014.07.007_bib0030 article-title: Applying the minimum relative entropy method for bimodal distribution in a remanufacturing system publication-title: Int J Prod Econ doi: 10.1016/j.ijpe.2007.11.010 – volume: 19 start-page: 94 issue: 2 year: 2000 ident: 10.1016/j.jmsy.2014.07.007_bib0325 article-title: A decision-making model for materials management of end-of-life electronic products publication-title: J Manuf Syst doi: 10.1016/S0278-6125(00)80003-5 – volume: 38 start-page: 293 year: 2007 ident: 10.1016/j.jmsy.2014.07.007_bib0220 article-title: Applying fuzzy goal programming to production/transportation planning decisions in a supply chain publication-title: Int J Syst Sci doi: 10.1080/00207720601159381 – volume: 42 start-page: 1519 year: 2012 ident: 10.1016/j.jmsy.2014.07.007_bib0285 article-title: A fuzzy goal programming approach for optimal product family design of mobile phones and multiple-platform architecture publication-title: IEEE Trans Syst Man Cybern – Part C: Appl Rev doi: 10.1109/TSMCC.2012.2198056 |
| SSID | ssj0012402 |
| Score | 2.2257452 |
| Snippet | •Fuzzy multi-objective linear programming model.•Procurement/production planning decision.•Recoverable manufacturing systems.
In actual lot-sizing... |
| SourceID | crossref elsevier |
| SourceType | Enrichment Source Index Database Publisher |
| StartPage | 396 |
| SubjectTerms | Fuzzy multi-objective linear programming Lot-sizing Procurement/production planning Recoverable remanufacturing systems |
| Title | Fuzzy multi-objective procurement/production planning decision problems for recoverable manufacturing systems |
| URI | https://dx.doi.org/10.1016/j.jmsy.2014.07.007 |
| Volume | 37 |
| WOSCitedRecordID | wos000367698100031&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| hasFullText | 1 |
| inHoldings | 1 |
| isFullTextHit | |
| isPrint | |
| journalDatabaseRights | – providerCode: PRVESC databaseName: Elsevier SD Freedom Collection Journals 2021 customDbUrl: eissn: 1878-6642 dateEnd: 99991231 omitProxy: false ssIdentifier: ssj0012402 issn: 0278-6125 databaseCode: AIEXJ dateStart: 19950101 isFulltext: true titleUrlDefault: https://www.sciencedirect.com providerName: Elsevier |
| link | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1LT9tAEF5B6AEOVaFUvFrtobdoW8drZ9fHqEoEHBBSg5SerH1ZEDUmIgkCfj2zDxsnFFQOXFaR40ey3-fd2Z2ZbxD6rguwQmFeJ0kqOEkE14QDzER2hBBx12jGpSs2wc7O-GiUnQdXzMyVE2Blye_usum7Qg3HAGybOvsGuOubwgH4DKBDC7BD-1_ADxYPD_c-UJBcy7Ef0Gwclqr2AuPB1Ou8WuinoWpRW4dqO-1QY8YJNbTtghm6wCVYTUS5sIkQPrNx1tA6f27dvnyu80A5mogr8vvShKnTBgV5PYM_CzIInA3bEZ20DmyrRq0YlqXWbGoOsV7XJYyRNOs2ptvEyTo8H8n9psL4x3gyu7cReInTWPUVcpdls1emszrIsIpfG-f2Hrm9Rx5ZbztbRxsxg4VWC230Tvqj09rtZF1NblMu_IeQZeUDAld_yb8tmYZ1MvyEPoaOxz1Ph220ZsodtNUQm_yMJo4YeIUYuEGMn0-0wBUtcEULXNECAy1wgxZ4CWocoN5FF4P-8NcxCcU2iKIsmpM0odxEUtpEZUM1TzW8s1rKSIDRCm1WJDzjkdDKMKaELqhI4VuZGBUzU1D6BbXK69LsIQyL6NhQKWElUFjHuexoWsDMoLKuVqlk-6hTdVyughK9LYjyN38Zsn3Urq-Zeh2WV89OKzzyYEl6CzEHer1y3cGbnnKINp_egCPUmt8szFf0Qd3Or2Y33wK3HgEUkp1h |
| linkProvider | Elsevier |
| openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Fuzzy+multi-objective+procurement%2Fproduction+planning+decision+problems+for+recoverable+manufacturing+systems&rft.jtitle=Journal+of+manufacturing+systems&rft.au=Su%2C+Tai-Sheng&rft.au=Lin%2C+Yu-Fan&rft.date=2015-10-01&rft.issn=0278-6125&rft.volume=37&rft.spage=396&rft.epage=408&rft_id=info:doi/10.1016%2Fj.jmsy.2014.07.007&rft.externalDBID=n%2Fa&rft.externalDocID=10_1016_j_jmsy_2014_07_007 |
| thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0278-6125&client=summon |
| thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0278-6125&client=summon |
| thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0278-6125&client=summon |