Zhuan, X., Zhang, L., Li, W., & Yang, F. (2018). Efficient operation of the fourth Huaian pumping station in east route of South-to-North Water Diversion Project. International journal of electrical power & energy systems, 98, 399-408. https://doi.org/10.1016/j.ijepes.2017.10.041
Chicago Style (17th ed.) CitationZhuan, Xiangtao, Lei Zhang, Wei Li, and Fei Yang. "Efficient Operation of the Fourth Huaian Pumping Station in East Route of South-to-North Water Diversion Project." International Journal of Electrical Power & Energy Systems 98 (2018): 399-408. https://doi.org/10.1016/j.ijepes.2017.10.041.
MLA (9th ed.) CitationZhuan, Xiangtao, et al. "Efficient Operation of the Fourth Huaian Pumping Station in East Route of South-to-North Water Diversion Project." International Journal of Electrical Power & Energy Systems, vol. 98, 2018, pp. 399-408, https://doi.org/10.1016/j.ijepes.2017.10.041.