Xu, M., Abdul-Kader, W., & Ganjavi, O. (2009). Cycle Time Estimation of a Multiple Product Production Line: An Approach With Fuzzy and Chance-Constrained Programming. INFOR. Information systems and operational research, 47(2), 93-103. https://doi.org/10.3138/infor.47.2.93
Chicago Style (17th ed.) CitationXu, Min, Walid Abdul-Kader, and Ozhand Ganjavi. "Cycle Time Estimation of a Multiple Product Production Line: An Approach With Fuzzy and Chance-Constrained Programming." INFOR. Information Systems and Operational Research 47, no. 2 (2009): 93-103. https://doi.org/10.3138/infor.47.2.93.
MLA (9th ed.) CitationXu, Min, et al. "Cycle Time Estimation of a Multiple Product Production Line: An Approach With Fuzzy and Chance-Constrained Programming." INFOR. Information Systems and Operational Research, vol. 47, no. 2, 2009, pp. 93-103, https://doi.org/10.3138/infor.47.2.93.